HEATH CONSTRUCTION | B= | C | 04/04/2011 | All other required Final inspections are complete. (This is a computer generated result) | DANF | DANF | | B= | C | 4130730 |
HEATH CONSTRUCTION | B= | P | 10/25/2010 | Additional Inspections Required: External Agency Inspection HD= by HEALTHDEPT is not Completed yet, CRYTON INC. Mechanical Final Inspection is not Completed yet. BUILDING OK; NEED MECHANICAL AND HEALTH DEPT COMPLETED | DANF | DANF | | B= | P | 4061229 |
HEATH CONSTRUCTION | BSP | T | 09/28/2010 | PAID (REC#939300) ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN new splice pages | TCRIPPEN | TCRIPPEN | | BSP | T | 4047254 |
SOURCE REFRIGERATION & HVAC | BSP | P | 09/28/2010 | PLAN SPLICE: (No Fee) by: RUSSELL for Mechanical | RUSSELL | RUSSELL | | BSP | P | 4046996 |
HEATH CONSTRUCTION | BSP | T | 09/23/2010 | PAID (REC#939300) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revise finishes and details | SHELLEY | SHELLEY | | BSP | T | 4044467 |
HEATH CONSTRUCTION | BFR | P | 09/07/2010 | NEW PHARMACY FRAMING OK` | DANF | DANF | | BFR | P | 4035804 |
SOURCE REFRIGERATION & HVAC | BSP | P | 08/26/2010 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: splice to change cooler model number | DALEH | DALEH | | BSP | P | 4030650 |
HEATH CONSTRUCTION | BSP | P | 08/26/2010 | Splice fee already charged | SHELBY | SHELBY | | BSP | P | 4030614 |
HEATH CONSTRUCTION | BSP | T | 08/26/2010 | PAID (REC#930549) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised equipment | SHELLEY | SHELLEY | | BSP | T | 4030596 |
HEATH CONSTRUCTION | BFR | P | 08/25/2010 | TEMP FRAMING OF PHARMACY OK | DANF | DANF | | BFR | P | 4029576 |
HEATH CONSTRUCTION | BFR | R | 08/23/2010 | MISSING CROSS BRACING ON TOP OF CEILING JOISTS AND EXPANDED METAL | DANF | DANF | | BFR | R | 4028308 |
HEATH CONSTRUCTION | BFR | P | 08/11/2010 | REAR OF STORE, SITE TO FLOOR WALLS; TALKED WITH SUPER RE REQUIED TEMP PHARMACY INSPECTIONS | DANF | DANF | | BFR | P | 4022794 |
L.G. ELECTRIC | E= | C | 10/14/2010 | | JERRY | JERRY | | E= | C | 4055858 |
L.G. ELECTRIC | E= | P | 09/16/2010 | PHARMACY AND PHOTO CENTER COMPLETE | JERRY | JERRY | | E= | P | 4040370 |
L.G. ELECTRIC | ER | P | 09/10/2010 | CEILINGS ONLY, CHECK FOR LOW VOLTAGE ON TILES AT FINAL | GARYL | GARYL | | ER | P | 4037893 |
L.G. ELECTRIC | ER | P | 09/08/2010 | pharmacy walls ------------POC #307-631-7118----------- | MATTHEW | MATTHEW | | ER | P | 4036735 |
L.G. ELECTRIC | ER | T | 09/07/2010 | PAID (REC#930720) Construction area was locked. History shows this is the second time area is locked. Previously a POC was requested, still no POC. | JOSEPH | JOSEPH | | ER | T | 4035712 |
L.G. ELECTRIC | ER | P | 08/25/2010 | TEMP PHARMACY OK | DEAN | DEAN | | ER | P | 4029761 |
L.G. ELECTRIC | ER | P | 08/16/2010 | WALLS | JERRY | JERRY | | ER | P | 4024782 |
L.G. ELECTRIC | ER | R | 08/12/2010 | NEED POC AND PHONE NUMBER------CONSTRUCTION AREA LOCKED---------- | JERRY | JERRY | | ER | R | 4023448 |
CRYTON INC. | H= | C | 04/04/2011 | RECEIVED BALANCE REPORT. SENT TO SCANNING. | LYNNS | LYNNS | | H= | C | 4130729 |
CRYTON INC. | H= | P | 10/06/2010 | HVAC FINAL PENDING BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 4052156 |
SOURCE REFRIGERATION & HVAC | H= | C | 10/06/2010 | HRP FINAL. | LYNNS | LYNNS | | H= | C | 4052155 |
CRYTON INC. | H= | P | 10/04/2010 | HVAC FINAL IN VISION CENTER. | LYNNS | LYNNS | | H= | P | 4050131 |
CRYTON INC. | HD | P | 09/28/2010 | ROUGH DUCT IN VISION CENTER OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 4047571 |
CRYTON INC. | HRR | P | 09/09/2010 | ROUGH DUCT IN PHARMACY AND SITE TO STORE AREA. OK TO INSULATE. | LYNNS | LYNNS | | HRR | P | 4037396 |
SOURCE REFRIGERATION & HVAC | HRP | C | 08/19/2010 | 2- 350# TESTS OK. | LYNNS | LYNNS | | HRP | C | 4027105 |
SOURCE REFRIGERATION & HVAC | HRP | R | 08/17/2010 | JOBSITE AREA LOCKED. COULD NOT FIND CONTRACTOR. NEED TO LIST A CONTACT AND NUMBER FOR INSPECTION. | LYNNS | LYNNS | | HRP | R | 4025804 |
FRONTIER MECHANICAL LLC | P= | C | 10/04/2010 | no approved plans on site (at rbd) | LEE | LEE | | P= | C | 4050207 |
FRONTIER MECHANICAL LLC | PTO | C | 10/04/2010 | ONLY LOOKED AT WORK LISTED ON PREVIOUS INSPECTIONS | LEE | LEE | | PTO | C | 4050205 |
FRONTIER MECHANICAL LLC | P= | P | 10/01/2010 | | TIM | TIM | | P= | P | 4049648 |
FRONTIER MECHANICAL LLC | PTO | P | 09/24/2010 | SINK IN VISION OK | LEE | LEE | | PTO | P | 4045755 |
FRONTIER MECHANICAL LLC | P= | P | 09/15/2010 | PHARMACY OK | LEE | LEE | | P= | P | 4039737 |
FRONTIER MECHANICAL LLC | P= | P | 09/13/2010 | -- PHARMACY -- LAV TOO HIGH, NO HOT WATER | LEE | LEE | | P= | P | 4038463 |
FRONTIER MECHANICAL LLC | PTO | P | 09/08/2010 | PHARMACY -- WALLS OK, NEED VTR AND OVERHEAD H20 -- AT FINAL -- ACCESS TO TRAP PRIMER IN WALL AND IN SINK CABINET | LEE | LEE | | PTO | P | 4036319 |
FRONTIER MECHANICAL LLC | PB | P | 09/07/2010 | FISH TANK AREA OK | LEE | LEE | | PB | P | 4035653 |
FRONTIER MECHANICAL LLC | PTO | P | 09/07/2010 | FISH TANK DWV AND H20 OK | LEE | LEE | | PTO | P | 4035647 |
FRONTIER MECHANICAL LLC | PB | P | 09/01/2010 | PHARMACY --- NEED ENGINEERES APPROVAL FOR 2" FLOOR DRAIN/HUB DRAIN ? ALSO NEED TRAP PRIMERS FISH TANK AREA --- EJECTOR PIT AND PIPING INSTALLED WITH-OUT INSPECTION, NEED TO SEE DRAIN CONNECTION TO PIT, PIPE SIZING, TRAP SIZE, ETC, PUMPED POINT OF CONNECTION APPEARS TO BE OK, CAN'T FIND ON PLANS ? NEED TEST ON ALL PIPING, NEED APPROVED PLUMBING SUPPORT STRAPING PRIOR TO PTO INSPECTION REQUEST | LEE | LEE | | PB | P | 4033642 |
FRONTIER MECHANICAL LLC | PB | P | 08/19/2010 | FLOOR DRAIN IN BAKERY OK | LEE | LEE | | PB | P | 4026726 |