HAMMERS CONSTRUCTION, INC | B= | C | 11/19/2010 | All other required Final inspections are complete. (This is a computer generated result) | DANF | DANF | | B= | C | 4073924 |
HAMMERS CONSTRUCTION, INC | B= | P | 11/18/2010 | Additional Inspections Required: External Agency Inspection Z= by ZONING is not Completed yet (Contact: kmagargal@springsgov.com or 385-5982). | DANF | DANF | | B= | P | 4073781 |
HAMMERS CONSTRUCTION, INC | BSP | T | 11/08/2010 | PAID (REC#944425) ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN new splice page moved grease trap | TCRIPPEN | TCRIPPEN | | BSP | T | 4068442 |
HAMMERS CONSTRUCTION, INC | BFR | P | 10/28/2010 | FRAMING OK PENIDNG OTHER ROUGHS | DANF | DANF | | BFR | P | 4063258 |
FOSTER ELECTRIC CORPORATION | E= | C | 11/17/2010 | | MIKEC | MIKEC | | E= | C | 4072847 |
FOSTER ELECTRIC CORPORATION | E= | R | 11/16/2010 | over current protection missing for secondary side of 30 kva transformer, unable to id this on first correction because general contractor showed me approved set that had incomplete one line and no access to ceiling above to confirm over current protection. still missing gfci protection for all outlets within 6 feet of any sink; still missing handle ties; still need to group and id multi wire circuits inside panel. These last three items were all requested on previous inspection. | JOSEPH | JOSEPH | | E= | R | 4072005 |
FOSTER ELECTRIC CORPORATION | E= | R | 11/15/2010 | panel blanks; all outlets within 6 feet of any sink needs gfci protection; label panels with phase color designation since two nominal voltages exist on site; provide complete one line on approved set; provide iecc calculations; handle ties; group multiwire circuits inside panel; | JOSEPH | JOSEPH | | E= | R | 4071385 |
FOSTER ELECTRIC CORPORATION | ER | C | 11/09/2010 | | MIKEC | MIKEC | | ER | C | 4069024 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/27/2010 | walls | MIKEC | MIKEC | | ER | P | 4062603 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 11/16/2010 | RECEIVED BALANCE REPORT. | LYNNS | LYNNS | | H= | C | 4071934 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 11/12/2010 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4070600 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 10/27/2010 | MOVE T-STAT TO NEW LOCATION. BALANCE AS PER PRINTS. INSULATE PVC IN RETURN AIR PLENUM. | NANCY | NANCY | | H= | P | 4062318 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | C | 10/27/2010 | ABOVE CEILING ALL OK. | NANCY | NANCY | | HD | C | 4062316 |
CHIEF MECHANICAL CONTRACTORS, INC. | P= | C | 11/15/2010 | | JOEL | JOEL | | P= | C | 4071534 |
CHIEF MECHANICAL CONTRACTORS, INC. | PTO | P | 10/27/2010 | WALLS OK, STILL NEED VTR AND WATER HEATER, PLENIUM CEILING (NEED TO INSULATE ALL PVC/COMBUSTABLES) | LEE | LEE | | PTO | P | 4062705 |
CHIEF MECHANICAL CONTRACTORS, INC. | PB | C | 10/21/2010 | | LEE | LEE | | PB | C | 4059963 |
CHIEF MECHANICAL CONTRACTORS, INC. | PB | P | 10/20/2010 | GREASE TRAP IMPROPERLY VENTED | LEE | LEE | | PB | P | 4059289 |
CHIEF MECHANICAL CONTRACTORS, INC. | PB | P | 10/19/2010 | NO APPROVED PLANS ON SITE, GREASE TRAP OUTLET PIPING NOT VENTED AND LACKS C/O TEE, PROVIDE ME MODEL # OF GREASE TRAP PLEASE | LEE | LEE | | PB | P | 4058595 |
CHIEF MECHANICAL CONTRACTORS, INC. | PB | P | 10/15/2010 | 4" STUB FROM ADJACENT SUITE OK | LEE | LEE | | PB | P | 4056561 |