ROBINSON CONSTRUCTION, LLC. | B= | C | 11/04/2011 | roof ok per pepper/ contractor states ice and water shield installed | BLAKE | BLAKE | | B= | C | 4231223 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 06/01/2011 | Reviewed structural steel repair at stair landing(Need engineer final inspection report), Roof top bar - Still need "keep door unlocked" sign and indicator lock at exit door, Shingles on roof slope < 2:12, Need to complete canopy permit | MIKE | MIKE | | BSP | P | 4157055 |
ROBINSON CONSTRUCTION, LLC. | BSP | T | 05/24/2011 | PAID (REC#977658): PLAN SPLICE FEE: $50 by: JAY for Construction: Eng beam repair: OK | JAY | JAY | | BSP | T | 4153960 |
ROBINSON CONSTRUCTION, LLC. | BSP | T | 05/11/2011 | PAID (REC#977660): PLAN SPLICE FEE: $50 by: JAY for Construction: Beam / Joist modification: OK | JAY | JAY | | BSP | T | 4147789 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 04/26/2011 | Reviewed outstanding final inspection items | MIKE | MIKE | | BSP | P | 4140772 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 12/21/2010 | Upper/roof level only - Need shell & fire finals, Need minimum 7' height under stair structure (6'-8"), Need minimum 6'-8" height at stair landing (6'- 4 1/2" at steel beam, 6'-6" at steel bar joist), Complete roof/door trim/stucco at roof top stair enclosure, Missing "keep door unlocked" sign, Install freezer at guardrail opening | MIKE | MIKE | | BSP | P | 4088541 |
ROBINSON CONSTRUCTION, LLC. | BSP | R | 12/20/2010 | Upper level - Not ready, Work not complete | MIKE | MIKE | | BSP | R | 4087851 |
ROBINSON CONSTRUCTION, LLC. | B= | P | 12/16/2010 | Temp CO: elect final pending ( Expires: 1/15/2011 12:00:00 AM) | MINDY | MINDY | | B= | P | 4087013 |
ROBINSON CONSTRUCTION, LLC. | B= | P | 12/16/2010 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, MEYER ELECTRIC Electrical Final Inspection is not Completed yet. Lower level only - Need electric & fire finals, Complete fire caulking at through penetrations & joints in 2hr fire barrier walls, Complete HC restrooms to code, Complete door hardware -- Schedule a new Building Final when above items are complete. | MIKE | MIKE | | B= | P | 4086993 |
ROBINSON CONSTRUCTION, LLC. | BFR | C | 12/16/2010 | 2hr fire barrier not complete at Suite #110 (not complete on Suite #110 side) | MIKE | MIKE | | BFR | C | 4086979 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 12/15/2010 | Reviewed final inspection ?'s | MIKE | MIKE | | BSP | P | 4085968 |
ROBINSON CONSTRUCTION, LLC. | BLA | C | 12/15/2010 | Lath at roof stair enclosure ok | MIKE | MIKE | | BLA | C | 4085967 |
ROBINSON CONSTRUCTION, LLC. | BSP | T | 12/15/2010 | PAID (REC#951103): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: added splice for patio fence/gate | SHELLEY | SHELLEY | | BSP | T | 4085739 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 12/02/2010 | Fire barrier walls - Complete slip joint at Unit #110 under bar joist, Complete caulk collars at roof drains, Complete entire side of Unit #110 | MIKE | MIKE | | BFR | P | 4079465 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 12/01/2010 | Received letter from Dwight Cooper(B-876) indicating the platform framing & the roof top/stair enclosure framing is ok as constructed | MIKE | MIKE | | BSP | P | 4078850 |
ROBINSON CONSTRUCTION, LLC. | BSP | R | 11/30/2010 | Stair walls - Problems not corrected(still no arch/eng design), No access provided roof for inspection | MIKE | MIKE | | BSP | R | 4077969 |
AIRTECH MECHANICAL, INC. | BSP | T | 11/29/2010 | PAID (REC#947906) PLAN SPLICE FEE: $50 by: RUSSELL for Mechanical: splice of 2 hood sheets | RUSSELL | RUSSELL | | BSP | T | 4077441 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 11/19/2010 | Platform framing - Need revised framing plan, Stair enclosure framing - Need engineer/architect framing plan | MIKE | MIKE | | BFR | P | 4074333 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 11/16/2010 | Meeting with Pepper & Roger, Fire barrier at Unit #140 ok as completed (need eng judgment for one sided top of wall protection), Will need panic hardware at 2nd front door & back door at final inspection | MIKE | MIKE | | BSP | P | 4072014 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 11/15/2010 | Putty packs at back to back boxes in fire barrier wall ok | MIKE | MIKE | | BSP | P | 4071693 |
ROBINSON CONSTRUCTION, LLC. | BFR | R | 11/12/2010 | Need electric/mechanical/plmbg rough inspections, Platform framing covered without inspection (must be fire treated wood), Complete putty packs in 2hr fire barrier wall(reviewed with electric contractor), Need approved design for 2hr fire barrier wall at Unit #140, Door #104 must swing indirection of travel (access to 2nd required exit), Remove freezer wall to complete/inspect 2hr fire barrier wall at Unit #130, Complete stair framing, Complete roof top patio framing, Note: Need backing for restroom grab bars, Need UL listed top track/slip track design at 2hr fire barrier walls | MIKE | MIKE | | BFR | R | 4070949 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 11/10/2010 | Reviewed fire barrier ?'s, Need non combustible framing at stage floor | MIKE | MIKE | | BSP | P | 4069741 |
ROBINSON CONSTRUCTION, LLC. | BIN | P | 10/29/2010 | R-13 installed at front & rear exterior walls | MIKE | MIKE | | BIN | P | 4063916 |
MEYER ELECTRIC | E= | C | 12/20/2010 | | MIKEC | MIKEC | | E= | C | 4087735 |
MEYER ELECTRIC | E= | P | 12/16/2010 | need handi boxes on exterior walls finished around or bell boxes installed | MATTHEW | MATTHEW | | E= | P | 4086658 |
MEYER ELECTRIC | E= | R | 12/15/2010 | need wr outlets, finish around boxes, secure fireplace outlet, need more accurate panel schedule | MATTHEW | MATTHEW | | E= | R | 4086167 |
MEYER ELECTRIC | E= | P | 12/10/2010 | main floor ok | MATTHEW | MATTHEW | | E= | P | 4083490 |
MEYER ELECTRIC | E= | T | 12/09/2010 | PAID (REC#950285): Roof area not ready----alter backsplash in bar area to provide access to double duplex recepticles-----GFCI protect three recepticles in south west corner of kitchen | SHELBY | SHELBY | | E= | T | 4083280 |
MEYER ELECTRIC | ER | P | 12/02/2010 | drop ceiling excluding hood area ok | MATTHEW | MATTHEW | | ER | P | 4079198 |
MEYER ELECTRIC | ER | P | 11/23/2010 | roof bar | MIKEC | MIKEC | | ER | P | 4075833 |
MEYER ELECTRIC | ER | P | 11/22/2010 | walls only for 2nd level "dog house" | GARYL | GARYL | | ER | P | 4074821 |
MEYER ELECTRIC | ES | C | 11/12/2010 | Commercial Service: 400 amp three phase 120/208 | SHELBY | SHELBY | | ES | C | 4070528 |
MEYER ELECTRIC | ER | P | 11/10/2010 | walls except in kitchen | GARYL | GARYL | | ER | P | 4069720 |
MEYER ELECTRIC | ER | P | 11/04/2010 | exterior walls | MATTHEW | MATTHEW | | ER | P | 4066672 |
MEYER ELECTRIC | ER | T | 11/02/2010 | PAID (REC#943364): LOCKED AT 12:24 | GARYL | GARYL | | ER | T | 4065463 |
COLORADO GAS SYSTEMS | HI | C | 12/15/2010 | FIRE RING OK. | LYNNS | LYNNS | | HI | C | 4086371 |
COLORADO GAS SYSTEMS | H= | C | 12/15/2010 | GAS FINAL. | LYNNS | LYNNS | | H= | C | 4086368 |
AIRTECH MECHANICAL, INC. | H= | C | 12/15/2010 | RECEIVED BALANCE REPORT. SENT TO SCANNING. | LYNNS | LYNNS | | H= | C | 4085719 |
COLORADO GAS SYSTEMS | HI | P | 12/13/2010 | NEED FIRE RING INSTALLED WITH FLEX AND REGULATOR VENTED TO OUTSIDE HOUSING. | LYNNS | LYNNS | | HI | P | 4084848 |
COLORADO GAS SYSTEMS | H= | P | 12/13/2010 | GAS FLEXS AND RESTRAINTS INSTALLED. STILL NEED FIRE RING INSTALLED ON ROOF. | LYNNS | LYNNS | | H= | P | 4084845 |
KENT SHEET METAL, INC | H= | C | 12/13/2010 | HRP FINAL. | LYNNS | LYNNS | | H= | C | 4084843 |
KENT SHEET METAL, INC | HRP | C | 12/13/2010 | 2- 350# TESTS OK. | LYNNS | LYNNS | | HRP | C | 4084841 |
AIRTECH MECHANICAL, INC. | HV | C | 12/09/2010 | WATER HEATER VENT OK. | LYNNS | LYNNS | | HV | C | 4083363 |
AIRTECH MECHANICAL, INC. | H= | P | 12/02/2010 | HOOD INTERLOCK OK. HVAC FINAL PENDING BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 4079845 |
COLORADO GAS SYSTEMS | HC | C | 11/30/2010 | OK FOR 2# METER. | LYNNS | LYNNS | | HC | C | 4078480 |
COLORADO GAS SYSTEMS | HI | P | 11/30/2010 | 10# AND 60# TESTS AND DESIGN OK. NEED TO SEE FIRE WALL NEXT. | LYNNS | LYNNS | | HI | P | 4078379 |
AIRTECH MECHANICAL, INC. | HD | P | 11/29/2010 | ROUGH DUCT ON MUA, OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 4077799 |
AIRTECH MECHANICAL, INC. | HD | P | 11/22/2010 | GREASE DUCT OK TO FIRE WRAP. | LYNNS | LYNNS | | HD | P | 4075499 |
AIRTECH MECHANICAL, INC. | HD | P | 11/17/2010 | ROUGH DUCT ON SUPPLY AND RETURN DUCTS, OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 4073140 |
HOGAN MECHANICAL, INC. | P= | C | 11/02/2011 | UNIT 110 HAS TWO CAPPED VENTS THAT ARE FOR FUTURE USE | LYNNIE | LYNNIE | | P= | C | 4230422 |
HOGAN MECHANICAL, INC. | P= | R | 10/25/2011 | 1) STILL HAS VENTS OVER THE MAX OF 7FT 2) STILL HAS 2 UNITS WITH CAPS ON THEM 3) MUST PAINT ALL PVC FOR UV PROTECTION | LYNNIE | LYNNIE | | P= | R | 4226767 |
HOGAN MECHANICAL, INC. | P= | P | 12/15/2010 | CHANGED TO PARTIAL ON 10/19/11 BY JIMV, ISSUES WITH PLUMBING VENTS THROUGH THE ROOF WERE BEING ADDRESSED ON THE SHELL PERMIT, THE CORRECT WORK SCOPE ISSUE IS FROM THIS TENANT FINISH. | JOEL | JOEL | | P= | P | 4086140 |
HOGAN MECHANICAL, INC. | P= | P | 12/13/2010 | complete roof top bar, install hammer arrestor for d.w | JOEL | JOEL | | P= | P | 4084734 |
HOGAN MECHANICAL, INC. | PTO | C | 12/02/2010 | | JOEL | JOEL | | PTO | C | 4079622 |
HOGAN MECHANICAL, INC. | PTO | P | 11/16/2010 | RESTROOMS AND KITCHEN O.K | JOEL | JOEL | | PTO | P | 4072418 |
HOGAN MECHANICAL, INC. | PB | C | 10/28/2010 | | LYNNIE | LYNNIE | | PB | C | 4063361 |
HOGAN MECHANICAL, INC. | PB | P | 10/27/2010 | QUESTION CELLCORE PVC AS BEING RATED OVER 140*--DW MAY DISCHARGE MORE THAN 140*--REST OK | LYNNIE | LYNNIE | | PB | P | 4062872 |