J. E. DUNN CONSTRUCTION COMPANY | B= | C | 12/20/2012 | | JIMA | JIMA | | B= | C | 4443911 |
J. E. DUNN CONSTRUCTION COMPANY | BE | L | 12/19/2012 | Renewed at 12/19/2012 11:11:15 AM | ROGER | ROGER | | BE | L | 4443033 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/04/2012 | ok pending phase #2 skywalk connection completed -- Schedule a new Building Final when above items are complete. | BERTW | BERTW | | B= | P | 4255704 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 12/07/2011 | phase #1 guard railings ok/missing railings on exterior stair lower flight -- Schedule a new Building Final when above items are complete/still need skywalk connection @ phase #2. | BERTW | BERTW | | B= | P | 4245935 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 09/19/2011 | install barricade at walkway ramp/install stars to ramp/alert for tax fee due is coming up in computer/walked job with Blake and Frank RBD building senior inspectors | BERTW | BERTW | | BSP | P | 4209233 |
J. E. DUNN CONSTRUCTION COMPANY | BFD | C | 08/12/2011 | no drain required letter on file | BERTW | BERTW | | BFD | C | 4192571 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | C | 08/12/2011 | | BERTW | BERTW | | BFR | C | 4192569 |
MECHONE, INC. | BSP | P | 08/05/2011 | PLAN SPLICE FEE: by: DALEH for Mechanical: splice to add fire damper | DALEH | DALEH | | BSP | P | 4189084 |
J. E. DUNN CONSTRUCTION COMPANY | B= | R | 07/29/2011 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396), External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: enijkamp@springsgov.com or 385-5977), MECH ONE, INC. Mechanical Final Inspection is not Completed yet, UTE PLUMBING & HEATING, INC Mechanical Final Inspection is not Completed yet, UTE PLUMBING & HEATING, INC Plumbing Final Inspection is not Completed yet, WEST ELECTRIC GROUP, INC. Electrical Final Inspection is not Completed yet. consultation with contractor rep Ian,zoo rep Ed and senior inspector Blake for final review/still need full final inspection done | BERTW | BERTW | | B= | R | 4185702 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 07/29/2011 | observation report on file pre engineered building and sky walk ok/pending other rough inspections completed | BERTW | BERTW | | BFR | P | 4185699 |
J. E. DUNN CONSTRUCTION COMPANY | BFN | C | 07/29/2011 | engineering observation report on file | BERTW | BERTW | | BFN | C | 4185692 |
J. E. DUNN CONSTRUCTION COMPANY | BFT | C | 07/29/2011 | engineering observation report on file | BERTW | BERTW | | BFT | C | 4185691 |
J. E. DUNN CONSTRUCTION COMPANY | BIN | C | 07/28/2011 | | BERTW | BERTW | | BIN | C | 4185168 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 07/28/2011 | Splice fee charged by construction | SHELBY | SHELBY | | BSP | P | 4184762 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | T | 07/28/2011 | PAID (REC#989637) PLAN SPLICE FEE: $50 by: JAY for Construction: Add walls to enclose electrical: OK | JAY | JAY | | BSP | T | 4184740 |
J. E. DUNN CONSTRUCTION COMPANY | BFD | P | 07/27/2011 | pending engineering letters | BERTW | BERTW | | BFD | P | 4184569 |
J. E. DUNN CONSTRUCTION COMPANY | BFN | P | 07/27/2011 | pending engineering letters | BERTW | BERTW | | BFN | P | 4184568 |
J. E. DUNN CONSTRUCTION COMPANY | BFT | P | 07/27/2011 | pending engineering letters | BERTW | BERTW | | BFT | P | 4184567 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 07/27/2011 | ok pending engineering letters and completed footing and foundations and all other rough inspections completed/phase #1 need plan review for electric equipment room not on plans per previous comments | BERTW | BERTW | | BFR | P | 4184566 |
J. E. DUNN CONSTRUCTION COMPANY | BIN | P | 06/17/2011 | roof R-30 in progress | BERTW | BERTW | | BIN | P | 4165631 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 06/17/2011 | met with Ian job super-reviewed what letters will be required by CTL for 3rd party and special inspections/electrical equipment room not on approved plans-need revised plan for inspection | BERTW | BERTW | | BFR | P | 4165630 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 06/16/2011 | restrooms,boiler rooms,electric equipment room framing ok pending other rough inspections/check for rated construction of boiler and electric room/need completed footing and foundation inspections | BERTW | BERTW | | BFR | P | 4165128 |
J. E. DUNN CONSTRUCTION COMPANY | BFT | P | 03/07/2011 | need completed inspection report | BERTW | BERTW | | BFT | P | 4119157 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 01/11/2011 | reviewed rated construction ?'s | BERTW | BERTW | | BSP | P | 4097121 |
J. E. DUNN CONSTRUCTION COMPANY | BFN | P | 12/22/2010 | ok to use ctl for foundation inspections due to construction schedule | BERTW | BERTW | | BFN | P | 4089539 |
J. E. DUNN CONSTRUCTION COMPANY | BFT | P | 12/22/2010 | reviewed drawings and construction schedule with "TO" job site super/ok to use ctl for footing inspections | BERTW | BERTW | | BFT | P | 4089537 |
WEST ELECTRIC GROUP, INC. | E= | C | 09/16/2011 | | BRET | BRET | | E= | C | 4208549 |
WEST ELECTRIC GROUP, INC. | E= | P | 09/15/2011 | 3 bad gfci receptacles on walkway | BRET | BRET | | E= | P | 4208153 |
WEST ELECTRIC GROUP, INC. | E= | P | 07/28/2011 | animal area ok, complete labeling, install handle ties for multi wire branch circuits, install bushing on gen conduit, make up main crane connections. pedestrian walkway not ready. | BRET | BRET | | E= | P | 4185407 |
WEST ELECTRIC GROUP, INC. | EP | P | 07/20/2011 | transformers and ehp and elp panel ok handle ties at final | BRET | BRET | | EP | P | 4180674 |
WEST ELECTRIC GROUP, INC. | EP | P | 07/13/2011 | panels ok. | BRET | BRET | | EP | P | 4177236 |
WEST ELECTRIC GROUP, INC. | ES | P | 07/11/2011 | Commercial Service: 600 amp 4/wire service, ok to energize when contractor ready made to main breaker only | BRET | BRET | | ES | P | 4175736 |
WEST ELECTRIC GROUP, INC. | ER | P | 06/10/2011 | walls and hardlids in electric, mech and bathrooms | BRET | BRET | | ER | P | 4162341 |
WEST ELECTRIC GROUP, INC. | EUG | C | 06/10/2011 | secondary and gen conduits ok | BRET | BRET | | EUG | C | 4162323 |
WEST ELECTRIC GROUP, INC. | ESL | C | 05/20/2011 | 2nd floor deck slab ok | BRET | BRET | | ESL | C | 4152684 |
WEST ELECTRIC GROUP, INC. | EUG | P | 05/12/2011 | south corridor slab ok | BRET | BRET | | EUG | P | 4148208 |
WEST ELECTRIC GROUP, INC. | EUG | P | 05/10/2011 | slab ok in bird area | BRET | BRET | | EUG | P | 4148210 |
WEST ELECTRIC GROUP, INC. | EUG | P | 03/30/2011 | n.w corridor ok to backfill | BRET | BRET | | EUG | P | 4129365 |
WEST ELECTRIC GROUP, INC. | EUG | P | 03/29/2011 | ufer | BRET | BRET | | EUG | P | 4128204 |
MECHONE, INC. | H= | C | 08/23/2011 | Received balance report | JON | JON | | H= | C | 4197219 |
MECHONE, INC. | H= | P | 08/19/2011 | BALANCE REPORT MISSING BATH ROOM EXHAUST FAN. | JON | JON | | H= | P | 4195724 |
UTE PLUMBING & HEATING, INC | H= | C | 08/11/2011 | GAS, HOT WATER PIPING AND BOILER FINAL | JON | JON | | H= | C | 4191891 |
UTE PLUMBING & HEATING, INC | H= | P | 08/08/2011 | Need verification of boiler interlock with ef-1 | JON | JON | | H= | P | 4189709 |
MECHONE, INC. | H= | P | 07/27/2011 | BOILER VENT, WATER HEATER VENT, FIRE DAMPER AND GRILL IN ELECTRICAL ROOM PER RFI, NEED APPROVED PLANS FOR FIRE DAMPER IN ELECTRICAL ROOM AND TEST AND BALANCE REPORT. INTER LOCK ON EXHAUST FAN AND DAMPERS OK. | LYNNS | LYNNS | | H= | P | 4184125 |
UTE PLUMBING & HEATING, INC | HC | C | 07/14/2011 | RELEASE 2 LB METER, PLEASE SEND RELEASE FOR 2# SYSTEM TO RBD OFFICE. 60 LB TEST | JON | JON | | HC | C | 4177541 |
UTE PLUMBING & HEATING, INC | HI | C | 07/14/2011 | 60 lb test ok. see regulators and pipe labeling before final. need release for 2# system from cspu | JON | JON | | HI | C | 4177540 |
UTE PLUMBING & HEATING, INC | HWP | C | 07/14/2011 | ok for piping insulation | JON | JON | | HWP | C | 4177539 |
MECHONE, INC. | HD | P | 06/23/2011 | HARD LIDS OK AT BATH ROOMS. INSPECTION FOR ROUGH SPRIAL AS WELL IN HOLDING AREAS OK. NEED EQUIPMENT INSPECTION AND DUCT CONNECTIONS. MAY HAVE ELECTRICAL ROOM VENTILATION, ELECTRICAL ROOM IS NOT SHOWN ON PLANS. BOILER ROOM MAY NEED MECHANICAL (D) STYLE GRILL FROM EQUIPMENT SCHEDULE TO HAVE SOME WAY OF RESISTING PASSAGE OF SMOKE AND PLANS TO INDICATE IF NEEDED. | JON | JON | | HD | P | 4168369 |
UTE PLUMBING & HEATING, INC | HWP | P | 06/02/2011 | 50# TEST ON RADIANT IN FLOOR FOR ELEPHANT PENS 5 AND 6, OK TO POUR. | LYNNS | LYNNS | | HWP | P | 4157676 |
UTE PLUMBING & HEATING, INC | HWP | P | 05/23/2011 | OK TO POUR AT THE RHINO PENS | JON | JON | | HWP | P | 4153548 |
UTE PLUMBING & HEATING, INC | HWP | P | 05/02/2011 | NO ACCESS TO PERMIT CARD. 50 LB TEST OK ON ELEPHANT STALLS #2 AND #3. OK TO POUR. | NANCY | NANCY | | HWP | P | 4143029 |
UTE PLUMBING & HEATING, INC | P= | C | 08/04/2011 | | LEE | LEE | | P= | C | 4188695 |
UTE PLUMBING & HEATING, INC | PTO | C | 06/14/2011 | | MARTY | MARTY | | PTO | C | 4163702 |
UTE PLUMBING & HEATING, INC | PB | C | 05/17/2011 | | MARTY | MARTY | | PB | C | 4150295 |
UTE PLUMBING & HEATING, INC | PB | P | 05/09/2011 | underground waters a-e line. | MARTY | MARTY | | PB | P | 4146448 |
UTE PLUMBING & HEATING, INC | PB | P | 05/04/2011 | underground ok up to where 2 1/2"pipe is necked down from 6".p trap in stall is 6".cannot reduce. | MARTY | MARTY | | PB | P | 4144587 |
UTE PLUMBING & HEATING, INC | PB | P | 04/05/2011 | column line c-west thru splash area.6" trap and waters. | MARTY | MARTY | | PB | P | 4131508 |
UTE PLUMBING & HEATING, INC | PB | P | 03/30/2011 | north corridor h2o from grid b-f | JOEL | JOEL | | PB | P | 4128959 |
UTE PLUMBING & HEATING, INC | PB | P | 03/25/2011 | n side trench drains o.k to exit of building | JOEL | JOEL | | PB | P | 4127391 |