STEINER CONSTRUCTION, INC | B= | C | 08/23/2011 | | DANF | DANF | | B= | C | 4197805 |
STEINER CONSTRUCTION, INC | BFR | C | 07/19/2011 | Per meeting with contractor and Blake engineer's letter for inspection of structural elements on file, Nathan A. Dowden, p.e. #31266, Robert H. Pollock AWS CWI #10090331 | DANF | DANF | | BFR | C | 4179644 |
STEINER CONSTRUCTION, INC | B= | R | 06/30/2011 | 1) need framing completed 2) max occupancy sign at main exit need to be of a permanent design | DANF | DANF | | B= | R | 4171632 |
STEINER CONSTRUCTION, INC | BFR | R | 06/30/2011 | still need engineer's letter of observation for installation of structural elements of work completed; to include girder beams and columns, roof beam splice, roof reinforcement for added RTU units, welding and bolting observations. | DANF | DANF | | BFR | R | 4171628 |
STEINER CONSTRUCTION, INC | BFR | P | 04/18/2011 | stage ramp and stage steps for access framing OK pending engineer stamped detail for ramp framing; still require engineer's letter for structural elements of building improvements as noted previously | DANF | DANF | | BFR | P | 4137178 |
STEINER CONSTRUCTION, INC | BFR | P | 04/12/2011 | engineer's letter on file for stage platform from Mark D. Weidhaas, #31528; still need engineer's letter for added roof girders, columns, welding and bolting observation; roof reinforcement for installation of added RTU units ; framing for audio video room and electrical room on stage ok | DANF | DANF | | BFR | P | 4134609 |
STEINER CONSTRUCTION, INC | BSP | T | 04/07/2011 | PAID (REC#967994) PLAN SPLICE FEE: $50 by: JAY for Construction: revise audio video room | JAY | JAY | | BSP | T | 4132879 |
STEINER CONSTRUCTION, INC | BFR | P | 04/05/2011 | 2,500 sq ft stage area deck covered prior to inspection, missing floor framing detail; will need engineer to verify framingof stage as to his approved design; still need engineer's inspection of steel girder beams install in roof system and columns; dry pack under columns ok; lobby soffit framing ok; south lobby wall framing ok | DANF | DANF | | BFR | P | 4131720 |
STEINER CONSTRUCTION, INC | BFR | P | 03/15/2011 | soffit angle steel attached to studs lobby at line #5 OK; still need line d.5 inspected for angle attachment to studs | DANF | DANF | | BFR | P | 4122661 |
STEINER CONSTRUCTION, INC | BFT | C | 03/14/2011 | letter on file from RMG, Andrei Bedoya, P,E., #39722 for inspection of pads to support added girder trusses | DANF | DANF | | BFT | C | 4121763 |
STEINER CONSTRUCTION, INC | BFR | R | 03/14/2011 | missing 4 each #12 tech screws in 3/16" steel plate to support rods to support soffit in lobby; detail for 24"oc framing and headwall attachments added to plans and is acceptable; need structural engineer inspection of added girder steel beams | DANF | DANF | | BFR | R | 4121759 |
STEINER CONSTRUCTION, INC | BFR | P | 02/22/2011 | stage framing in education area OK to cover; letter on file for wall framing of south education area | DANF | DANF | | BFR | P | 4114150 |
STEINER CONSTRUCTION, INC | BSP | T | 02/10/2011 | PAID (REC#958992) ADDITIONAL PLAN REVIEW TIME: $50 From: JAY Splice: add a wall to plans, other minor info | JAY | JAY | | BSP | T | 4109801 |
FOSTER ELECTRIC CORPORATION | BSP | T | 02/10/2011 | PAID (REC#958991) ADDITIONAL PLAN REVIEW TIME: $50 From: MATTHEW splice 2 new pages | MATTHEW | MATTHEW | | BSP | T | 4109789 |
STEINER CONSTRUCTION, INC | BSP | C | 02/09/2011 | ADDITIONAL PLAN REVIEW TIME: $00 From: TCRIPPEN new splice page | TCRIPPEN | TCRIPPEN | | BSP | C | 4109383 |
HVAC SOLUTIONS, INC. | BSP | T | 02/09/2011 | PAID (REC#958989) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice to all mechanical pages | DALEH | DALEH | | BSP | T | 4109380 |
STEINER CONSTRUCTION, INC | BFT | P | 02/08/2011 | ok for engineer to inspect interior footings, stamped letter to follow | FRANK | FRANK | | BFT | P | 4108762 |
STEINER CONSTRUCTION, INC | BFR | R | 01/27/2011 | plans show 30' walls to deck to be 16"oc; still need head wall detail | DANF | DANF | | BFR | R | 4104956 |
STEINER CONSTRUCTION, INC | BFR | P | 01/07/2011 | south educational wall OK pending plans that show wall type and support at top of walls area noted on approved plans sheet A101 | DANF | DANF | | BFR | P | 4095780 |
FOSTER ELECTRIC CORPORATION | E= | C | 05/24/2011 | | MIKEC | MIKEC | | E= | C | 4154131 |
FOSTER ELECTRIC CORPORATION | E= | P | 04/22/2011 | outlets in foyer and sanctuary ok | MATTHEW | MATTHEW | | E= | P | 4139366 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/22/2011 | 4 sets of 250 al landed in dimmer panel----- approved plans not on site | MATTHEW | MATTHEW | | ER | P | 4139364 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/15/2011 | lobby ceiling | MIKEC | MIKEC | | ER | P | 4136191 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/12/2011 | slab,walls,ceiling see plans | MIKEC | MIKEC | | ER | P | 4134707 |
FOSTER ELECTRIC CORPORATION | EP | P | 04/05/2011 | transformer ,sub-panel, rtu's | MIKEC | MIKEC | | EP | P | 4131775 |
FOSTER ELECTRIC CORPORATION | E= | P | 03/30/2011 | phase 1 | MIKEC | MIKEC | | E= | P | 4129161 |
FOSTER ELECTRIC CORPORATION | ER | P | 03/25/2011 | ceiling | MIKEC | MIKEC | | ER | P | 4127346 |
FOSTER ELECTRIC CORPORATION | ER | P | 03/24/2011 | ceilings see plans | MIKEC | MIKEC | | ER | P | 4126781 |
FOSTER ELECTRIC CORPORATION | ER | P | 03/21/2011 | see plans | MIKEC | MIKEC | | ER | P | 4124478 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/26/2011 | walls see plans | MIKEC | MIKEC | | ER | P | 4104184 |
FOSTER ELECTRIC CORPORATION | ESL | C | 01/11/2011 | | MIKEC | MIKEC | | ESL | C | 4096896 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/06/2011 | partial walls see highlighted plans | MIKEC | MIKEC | | ER | P | 4094929 |
HVAC SOLUTIONS, INC. | H= | C | 05/04/2011 | RECEIVED BALANCE REPORT, SENT TO SCANNING. | LYNNS | LYNNS | | H= | C | 4144273 |
HVAC SOLUTIONS, INC. | H= | P | 04/15/2011 | COMPLETION OF ROUGH DUCT. HVAC FINAL PENDING BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 4136427 |
ARTISAN PIPE SYSTEMS, INC. | H= | C | 03/25/2011 | GAS FINAL. | LYNNS | LYNNS | | H= | C | 4127553 |
HVAC SOLUTIONS, INC. | H= | P | 03/04/2011 | partial final for the class rooms only, ok to drop tile. | LYNNS | LYNNS | | H= | P | 4118505 |
ARTISAN PIPE SYSTEMS, INC. | HI | C | 01/27/2011 | 10- 60# TESTS, 1-10# TEST AND DESIGN OK. | LYNNS | LYNNS | | HI | C | 4104896 |
HVAC SOLUTIONS, INC. | HD | P | 01/26/2011 | ROUGH DUCT ON RTU'S 6,8,9,10 AND 11. OK TO INSULATE ROUND PIPE. | LYNNS | LYNNS | | HD | P | 4104016 |
ARTISAN PIPE SYSTEMS, INC. | P= | C | 04/05/2011 | | LEE | LEE | | P= | C | 4131708 |
ARTISAN PIPE SYSTEMS, INC. | PTO | C | 02/11/2011 | for one sink, pto complete | LEE | LEE | | PTO | C | 4110398 |
ARTISAN PIPE SYSTEMS, INC. | PTO | P | 01/20/2011 | | LEE | LEE | | PTO | P | 4101693 |
ARTISAN PIPE SYSTEMS, INC. | PTO | P | 01/19/2011 | for vtr and overhead h20 at two & three yr old restrooms only, need plans !!! | LEE | LEE | | PTO | P | 4100555 |
ARTISAN PIPE SYSTEMS, INC. | PTO | P | 01/05/2011 | NO PLANS ON SITE ! LOOKED AT TWO & THREE YR OLDS RESTROOMS/SINKS WALLS ONLY, DESIGN APPEARS TO BE OK | LEE | LEE | | PTO | P | 4094652 |
ARTISAN PIPE SYSTEMS, INC. | PB | C | 12/30/2010 | INSPECTED RESTROOM AND SINK IN ROOMS 112 & 113, OTHER RESTROOMS AT A LATER DATE ON ANOTHER PERMIT ? | LEE | LEE | | PB | C | 4092347 |