STAUFFER AND SONS CONSTRUCTION | B= | C | 04/08/2011 | | CHRISM | CHRISM | | B= | C | 4133079 |
STAUFFER AND SONS CONSTRUCTION | B= | P | 03/25/2011 | ok after E= | CHRISM | CHRISM | | B= | P | 4127537 |
STAUFFER AND SONS CONSTRUCTION | BIN | C | 02/28/2011 | | CHRISM | CHRISM | | BIN | C | 4116381 |
STAUFFER AND SONS CONSTRUCTION | BFR | C | 02/28/2011 | | CHRISM | CHRISM | | BFR | C | 4116378 |
STAUFFER AND SONS CONSTRUCTION | BFR | R | 02/25/2011 | ok to insulate, a-35 rake walls at corners | CHRISM | CHRISM | | BFR | R | 4115970 |
STAUFFER AND SONS CONSTRUCTION | BFT | C | 02/16/2011 | deck and roof support pier ok | CHRISM | CHRISM | | BFT | C | 4112047 |
STAUFFER AND SONS CONSTRUCTION | BFR | P | 02/11/2011 | floor trusses and ledger connections ok | CHRISM | CHRISM | | BFR | P | 4110308 |
D & J QUALITY ELECTRIC INC | E= | C | 04/06/2011 | | MATTHEW | MATTHEW | | E= | C | 4132416 |
D & J QUALITY ELECTRIC INC | E= | P | 03/24/2011 | contractor is coordinating overhead change over with mtve | MATTHEW | MATTHEW | | E= | P | 4126302 |
D & J QUALITY ELECTRIC INC | E= | R | 03/21/2011 | panel not labeled correctly (only 1 dryer breaker and 1 phase is on a single pole 20 and the other phase is on 1/2 of 2 pole 20), top of panel needs to be completely sealed and done correctly, where is the j-box where the homeruns come in? | MATTHEW | MATTHEW | | E= | R | 4124950 |
D & J QUALITY ELECTRIC INC | ER | C | 02/24/2011 | homeruns need to be checked for derating at service or final inspection | MATTHEW | MATTHEW | | ER | C | 4114899 |
D & J QUALITY ELECTRIC INC | ES | R | 02/23/2011 | see rough | MATTHEW | MATTHEW | | ES | R | 4114535 |
D & J QUALITY ELECTRIC INC | ER | R | 02/23/2011 | framing for walls not complete; nm laying on ground, make up box feeding floor plug,---------------- at service: bond neutral install ko seal at top of panel, install inter-system bonding terminal, derate homerun conductors to addition | MATTHEW | MATTHEW | | ER | R | 4114530 |
BESTWAY PLUMBING, INC | H= | C | 03/25/2011 | gas piping | TED | TED | | H= | C | 4126916 |
BRUNO'S HEATING & COOLING | H= | C | 03/22/2011 | no a/c, furnace room conditioned | TED | TED | | H= | C | 4125221 |
BESTWAY PLUMBING, INC | HI | C | 02/23/2011 | to new furnace | LEE | LEE | | HI | C | 4114296 |
BRUNO'S HEATING & COOLING | HRR | C | 02/23/2011 | | NANCY | NANCY | | HRR | C | 4114196 |
BRUNO'S HEATING & COOLING | HRR | P | 02/18/2011 | NO GAS CONTRACTOR LISTED ON PERMIT. NEED GAS ADDED TO PERMIT AND INSPECTED. BY FINAL PROVIDE RESIDENTIAL EQUIPMENT CERTIFICATE. CONDITION FURNACE ROOM, SUPPLY MUST HAVE DAMPER AND BE BLOCKED PARTIALLY OPEN. NOTE: 40K, 90% INSTALLED, DIRECT VENT. NO A/C. | NANCY | NANCY | | HRR | P | 4112921 |
BESTWAY PLUMBING, INC | P= | C | 03/24/2011 | could not find the card | LEE | LEE | | P= | C | 4126396 |
BESTWAY PLUMBING, INC | PTO | C | 02/24/2011 | | LEE | LEE | | PTO | C | 4114919 |
BESTWAY PLUMBING, INC | PTO | P | 02/23/2011 | lacks test at w/c and tub vtr, complete nail protection at lav vent and bottom plate at new washer location (p-trap, san-tee, vent), lost test laundry gauge, f/d fixture drain is flat | LEE | LEE | | PTO | P | 4114297 |
BESTWAY PLUMBING, INC | PTO | P | 02/18/2011 | under floor dwv and h20 ok | LEE | LEE | | PTO | P | 4112825 |