ROBINSON CONSTRUCTION, LLC. | B= | C | 10/19/2011 | | JIMP | JIMP | | B= | C | 4224181 |
ROBINSON CONSTRUCTION, LLC. | B= | P | 05/05/2011 | need shell frame and shell final completed -- Schedule a new Building Final when above items are complete. | DANF | DANF | | B= | P | 4145320 |
ROBINSON CONSTRUCTION, LLC. | B= | R | 04/28/2011 | Cancelled, Terri | MIKE | MIKE | | B= | R | 4141987 |
ROBINSON CONSTRUCTION, LLC. | B16 | C | 04/27/2011 | CONSULTATION WITH BUILDER, ARCHITECT, CHIEF BLDG INSPECTOR. REDUCED SALES AREA NOT EXACTLY PER PLAN, HOWEVER FIXED SEATING CAPACITY REMAINS AT 15 OCCUPANTS PER DESIGN FOR REDUCING RESTROOM FACILITY REQUIREMENT. | JIMV | JIMV | | B16 | C | 4141385 |
ROBINSON CONSTRUCTION, LLC. | B= | P | 04/26/2011 | Problems not corrected -- Schedule a new Building Final when above items are complete. | MIKE | MIKE | | B= | P | 4140765 |
MEYER ELECTRIC | BSP | T | 03/22/2011 | PAID (REC#965167): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: splice to add water heater | SHELBY | SHELBY | | BSP | T | 4125438 |
ROBINSON CONSTRUCTION, LLC. | B= | P | 03/21/2011 | Temp CO: all finals are not completed ( Expires: 4/20/2011 12:00:00 AM) | JAN | JAN | | B= | P | 4124926 |
ROBINSON CONSTRUCTION, LLC. | B= | P | 03/21/2011 | Problems not corrected | MIKE | MIKE | | B= | P | 4124758 |
ROBINSON CONSTRUCTION, LLC. | B= | R | 03/18/2011 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, HOGAN MECHANICAL, INC Plumbing Final Inspection is not Completed yet, MEYER ELECTRIC Electrical Final Inspection is not Completed yet. Need all other final inspections, Need complete shell final inspection, Install indicator lock at front door, Install seating area rails to limit size per design, Complete HC restroom to code | MIKE | MIKE | | B= | R | 4124017 |
ROBINSON CONSTRUCTION, LLC. | BFR | C | 03/18/2011 | | MIKE | MIKE | | BFR | C | 4124016 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 03/16/2011 | Need electric & mechanical rough inspections | MIKE | MIKE | | BFR | P | 4122978 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 03/15/2011 | metal studs installed at radius wall; rock screwed above 9'; need adhesive of stud to rock 9' and below ; recall | DANF | DANF | | BFR | P | 4122562 |
ROBINSON CONSTRUCTION, LLC. | BFR | R | 03/14/2011 | Work performed prior to to permit, Framing covered without inspection, Need all rough inspections, Wood partition framing must be fire-retardant-treated studs (studs are not FRT), | MIKE | MIKE | | BFR | R | 4121634 |
MEYER ELECTRIC | E= | C | 03/25/2011 | | GARYL | GARYL | | E= | C | 4127274 |
MEYER ELECTRIC | E= | T | 03/23/2011 | PAID (REC#965669): white wires no id'd at 240v outlets, neutrals not bundled with multi-conductor circuits | MATTHEW | MATTHEW | | E= | T | 4125825 |
MEYER ELECTRIC | ER | C | 03/23/2011 | | MATTHEW | MATTHEW | | ER | C | 4125823 |
MEYER ELECTRIC | E= | P | 03/21/2011 | see rough this date | MATTHEW | MATTHEW | | E= | P | 4124535 |
MEYER ELECTRIC | ER | P | 03/21/2011 | bundle multi-conductor circuits, missing ko seal bottom of panel, revise plans showing water heater, ground switches, id white wires on 220v outlets | MATTHEW | MATTHEW | | ER | P | 4124531 |
MEYER ELECTRIC | ER | P | 03/11/2011 | walls complete------ contractor needs to leave both boxes with uf cable open to check grounds on ceiling inspection | MATTHEW | MATTHEW | | ER | P | 4121069 |
MEYER ELECTRIC | ER | P | 03/09/2011 | interior walls excluding both ends of uf cable | MATTHEW | MATTHEW | | ER | P | 4119943 |
MEYER ELECTRIC | ER | P | 03/03/2011 | exterior walls | MATTHEW | MATTHEW | | ER | P | 4117798 |
AIRTECH MECHANICAL, INC. | H= | C | 03/23/2011 | RECEIVED BALANCE REPORT. | LYNNS | LYNNS | | H= | C | 4125520 |
AIRTECH MECHANICAL, INC. | H= | P | 03/18/2011 | HVAC FINAL PENDING BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 4124202 |
ALLRIGHT PLUMBING | H= | C | 03/17/2011 | CONDENSATION DRAIN OFF WALK-IN COOLER OK. | LYNNS | LYNNS | | H= | C | 4123748 |
ALLRIGHT PLUMBING | HRP | C | 03/15/2011 | WALK-IN COOLER OK. | LYNNS | LYNNS | | HRP | C | 4122521 |
AIRTECH MECHANICAL, INC. | HD | P | 03/07/2011 | ROUGH DUCT ON MAINS AND LATTERAL RUNS. | LYNNS | LYNNS | | HD | P | 4119085 |
HOGAN MECHANICAL, INC. | P= | C | 03/21/2011 | | LYNNIE | LYNNIE | | P= | C | 4124870 |
HOGAN MECHANICAL, INC. | PTO | C | 03/14/2011 | | LYNNIE | LYNNIE | | PTO | C | 4121766 |
HOGAN MECHANICAL, INC. | PB | C | 03/03/2011 | | LYNNIE | LYNNIE | | PB | C | 4117892 |