BRYAN CONSTRUCTION, INC. | B= | C | 09/09/2011 | All other required Final inspections are complete. (This is a computer generated result) | BERTW | BERTW | | B= | C | 4205349 |
BRYAN CONSTRUCTION, INC. | B= | P | 08/12/2011 | Additional Inspections Required: PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | BERTW | BERTW | | B= | P | 4192696 |
BRYAN CONSTRUCTION, INC. | BSP | T | 08/11/2011 | PAID (REC#992869) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised floor plan to show existing doors to remain, modified hardware. | SHELLEY | SHELLEY | | BSP | T | 4191818 |
BRYAN CONSTRUCTION, INC. | BFR | C | 08/03/2011 | | BERTW | BERTW | | BFR | C | 4187661 |
BRYAN CONSTRUCTION, INC. | B= | P | 08/03/2011 | Additional Inspections Required: External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), CONTRACT MECHANICAL SVC INC Mechanical Final Inspection is not Completed yet, PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. plans show 2 doors being infill framing to remove doors in student activity area/change plans to correct doors not being removed -- Schedule a new Building Final when above items are complete. | BERTW | BERTW | | B= | P | 4187660 |
PEAK HEATING & AIR CONDITIONING, INC. | BSP | P | 07/20/2011 | PLAN SPLICE: (No Fee) by: RUSSELL for Mechanical: revised spec section for smoke detectors | RUSSELL | RUSSELL | | BSP | P | 4180752 |
PEAK HEATING & AIR CONDITIONING, INC. | BSP | T | 06/24/2011 | PAID (REC#990609): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice to remove individual smoke detectors from fan powered boxes | DALEH | DALEH | | BSP | T | 4169039 |
BRYAN CONSTRUCTION, INC. | BSP | R | 06/17/2011 | not ready | BERTW | BERTW | | BSP | R | 4165435 |
BRYAN CONSTRUCTION, INC. | BFR | P | 05/24/2011 | restroom hardlids and resource center furr-out walls ok | BERTW | BERTW | | BFR | P | 4153885 |
CONTRACT MECHANICAL SVC INC | BSP | T | 05/19/2011 | PAID (REC#979957): PLAN SPLICE FEE: $50 by: RUSSELL for Plumbing: revised /added sheeet M6.2 | RUSSELL | RUSSELL | | BSP | T | 4152194 |
BRYAN CONSTRUCTION, INC. | BFR | P | 05/03/2011 | walls ok northwest section/pending other roughs completed | BERTW | BERTW | | BFR | P | 4143755 |
BIBLE ELECTRIC, INC. | E= | C | 08/04/2011 | FIRE ALARM INSPECTION: Ok to final per Bret F. | DEAN | DEAN | | E= | C | 4188521 |
BIBLE ELECTRIC, INC. | E= | C | 08/01/2011 | | BRET | BRET | | E= | C | 4186369 |
BIBLE ELECTRIC, INC. | E= | P | 07/29/2011 | west half , student center ok install handle ties. | BRET | BRET | | E= | P | 4185802 |
BIBLE ELECTRIC, INC. | E= | C | 07/18/2011 | | MIKEC | MIKEC | | E= | C | 4178977 |
BIBLE ELECTRIC, INC. | ER | C | 07/18/2011 | | MIKEC | MIKEC | | ER | C | 4178975 |
BIBLE ELECTRIC, INC. | ER | C | 06/13/2011 | FIRE ALARM INSPECTION: | BRET | BRET | | ER | C | 4163109 |
BIBLE ELECTRIC, INC. | ER | P | 06/08/2011 | ceiling electrical ok borders only will need to have f.a inspection | BRET | BRET | | ER | P | 4160695 |
BIBLE ELECTRIC, INC. | EP | P | 06/07/2011 | panel hp1 ,lp1,lp2,lp3 and tranformers ok handle ties by final. | BRET | BRET | | EP | P | 4160017 |
BIBLE ELECTRIC, INC. | ER | P | 06/02/2011 | ceilings 108 thru 115 pending f.a inspection. cloud in student resource center ok | BRET | BRET | | ER | P | 4157678 |
BIBLE ELECTRIC, INC. | ER | P | 05/26/2011 | break room walls | MIKEC | MIKEC | | ER | P | 4155052 |
BIBLE ELECTRIC, INC. | ER | P | 05/23/2011 | bathroom hardlids ok after contractor removes temp lighting | BRET | BRET | | ER | P | 4153389 |
BIBLE ELECTRIC, INC. | ESL | C | 05/17/2011 | 9 floor boxes s.e area. | BRET | BRET | | ESL | C | 4150112 |
BIBLE ELECTRIC, INC. | ER | P | 05/05/2011 | FIRE ALARM INSPECTION: walls | BRET | BRET | | ER | P | 4145086 |
BIBLE ELECTRIC, INC. | ER | P | 05/02/2011 | walls n.w area. | BRET | BRET | | ER | P | 4143247 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 09/09/2011 | BALANCE REPORT CORRECTED. | JON | JON | | H= | C | 4205348 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 08/08/2011 | Review of balance report, found exhaust, fan coil 1 and fan coil 6 is more than 10% off. | JON | JON | | H= | P | 4189521 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 08/04/2011 | RECEIVED LETTER FOR RESTRAINT SYSTEM REQUIREMENT. STILL NEED BALANCE REPORT | JON | JON | | H= | P | 4188708 |
CONTRACT MECHANICAL SVC INC | H= | C | 08/02/2011 | | JON | JON | | H= | C | 4187226 |
CONTRACT MECHANICAL SVC INC | H= | P | 07/25/2011 | Still need to look at supports on roof | JACK | JACK | | H= | P | 4182933 |
CONTRACT MECHANICAL SVC INC | HC | C | 06/27/2011 | ADJUSTING LOAD FOR NEW ROOF TOP HEATING UNIT. 10 LB TEST | JON | JON | | HC | C | 4169680 |
CONTRACT MECHANICAL SVC INC | HI | C | 06/27/2011 | BEFORE FINAL WILL NEED PROPER SPACING FOR GAS LINE SUPPORTS ON ROOF, ALSO NEED SUPPORTS TO BE APPROVED MATERIAL FOR OUTSIDE. 10 LB TEST FOR NEW MAKE UP AIR UNIT OK. 350K LOAD... LEFT NOTE ON CARD NEW MAKE UP AIR UNIT AND CHILLER WILL NEED GUARDS AS NEW EQUIPMENT IS WITHIN 10 FEET OF ROOF EDGE. | JON | JON | | HI | C | 4169679 |
CONTRACT MECHANICAL SVC INC | HWP | P | 06/14/2011 | OK FOR INSULATION SEE CHILLER AND CONNECTIONS BEFORE FINAL, | JON | JON | | HWP | P | 4163581 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 06/13/2011 | REGISTERS AND GRILLS OK. NEED TO CALL HWP IN FOR NEW UNITS. | LYNNS | LYNNS | | H= | P | 4162717 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | C | 06/13/2011 | DUCT AND FLEXS COMPLETE. | LYNNS | LYNNS | | HD | C | 4162715 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 05/23/2011 | OK TO WRAP REST OF DUCT. STILL NEED HWP INSPECTIONS, STILL NEED ALL DRAINS INSTALLED. STILL NEED MINI SPILT INSPECTIONS. RBD NOTE CHILLER AND MAKEUP AIR UNIT NOT IN PLACE. NEED TO CHECK PERMIT DETAILS. | JON | JON | | HD | P | 4153218 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 05/17/2011 | STILL NEED F/C-1 AND F/C-5 AND MAKEUP AIR PHASE ONE INSPECTED. REST OK TO WRAP PHASE ONE ONLY. | JON | JON | | HD | P | 4150088 |
CONTRACT MECHANICAL SVC INC | P= | C | 06/30/2011 | | MARTY | MARTY | | P= | C | 4171330 |
CONTRACT MECHANICAL SVC INC | PTO | C | 05/03/2011 | GET SUITE NUMBER ON PERMIT BY FINALS--GET 4 MORE LAVS ON PERMIT BY FINALS--1 SK IS IN THE SOUTH WEST CORNER OF BLDG TOO | LYNNIE | LYNNIE | | PTO | C | 4143835 |