GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 11/21/2012 | All other required Final inspections are complete. (This is a computer generated result) | DANF | DANF | | B= | C | 4427167 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | C | 06/18/2012 | | DANF | DANF | | BFR | C | 4327724 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 06/18/2012 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-5982, x2), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. Phases 1-5 for permit now complete, building OK need heating and fire finals completed; | DANF | DANF | | B= | P | 4327671 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/05/2012 | Above grid 1hr wall clean supply #1051 and #1056 OK | DANF | DANF | | BSP | P | 4321176 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 05/18/2012 | rooms Area 5A, rooms 1010, 1012, 1013, 1014 -- Schedule a new Building Final when above items are complete. | DANF | DANF | | B= | P | 4313207 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/18/2012 | wall framing for rooms; 1036, 1037, 1038, 1039, and 1056, 1051 need above grid fire caulk inspection | DANF | DANF | | BSP | P | 4313205 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/04/2012 | area 5b above grid in rooms #1001, 1014, 1013, 1012, 1010, and 1011 OK | DANF | DANF | | BSP | P | 4306305 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/27/2012 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. area "4B" building OK for partial release pending fire final -- Schedule a new Building Final when above items are complete. | DANF | DANF | | B= | P | 4302822 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 04/25/2012 | PAID (REC#1041593) PLAN SPLICE FEE: $50 by: JAY for Construction: Revise restroom: OK per jim pepper: | JAY | JAY | | BSP | T | 4301646 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/23/2012 | Wall framing in rooms #1010, 1012, 1013, 1014 and wheel chair storage room #1001 | DANF | DANF | | BFR | P | 4300186 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/12/2012 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. tempered glazing for screen wall OK; documentation on file -- Schedule a new Building Final when above items are complete. | DANF | DANF | | B= | P | 4295621 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/11/2012 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. received invoice from pikes peak glass re temper screen wall in waiting room; will review in lue of tempered labeling -- Schedule a new Building Final when above items are complete. | DANF | DANF | | B= | P | 4294995 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/10/2012 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. west side of waiting room only, need tempered glass etching on screen wall -- Schedule a new Building Final when above items are complete. | DANF | DANF | | B= | P | 4294506 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/09/2012 | south wall above grid room #1039 south side of smoke partition OK | DANF | DANF | | BSP | P | 4294004 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/09/2012 | room #1046 and #1043 above grid smoke partition OK ; OK to drop tile in area #4A | DANF | DANF | | BSP | P | 4293999 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 04/06/2012 | not ready until Monday per super; He will reschedule | DANF | DANF | | BSP | R | 4292997 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/29/2012 | framing in phase #4; need inspect rooms #1046 and #1043 fire barrier walls, linen areas | DANF | DANF | | BFR | P | 4289541 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/06/2012 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. area 3b OK pending other final completed and fire final completed for area -- Schedule a new Building Final when above items are complete. | DANF | DANF | | B= | P | 4279433 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/15/2012 | OK to drop tile area 3A and 3B pending other roughs; letter on file #B-1854 from RTA architects, David L. Magargal, AIA, to use ceiling assembly for smoke partition | DANF | DANF | | BSP | P | 4271721 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/14/2012 | wall framing bathrooms #1006 and #1007; need above grid inspection for smoke partition | DANF | DANF | | BSP | P | 4271183 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/27/2012 | ok framing in area 3b only pending other rough inspections | FRANK | FRANK | | BFR | P | 4265309 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | C | 01/19/2012 | in fill window with lath; at ambulance entrance west wall | DANF | DANF | | BLA | C | 4261310 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 12/23/2011 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-5982, ext 2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. Partial Phase area "2A"; 1) need to idenify fire walls and smoke walls around electrical room #1129; 2) missing bathroom door and hardware 3) seal inside of electrical room penetrations #1129 -- Schedule a new Building Final when above items are complete. | DANF | DANF | | B= | P | 4252748 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/21/2011 | fire caulking above grid around electrical room ; area #1026, 1027, and 1128 OK pending labeling of wall ; 2hr wall above grid east wall #1109 OK pending labeling of wall | DANF | DANF | | BSP | P | 4251944 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | P | 12/14/2011 | Engineer letter from CTL of foundation wall under in fill and base weld plates for 4x4 tube steel at old entry of ER on file | DANF | DANF | | BFN | P | 4248856 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/14/2011 | wall in fill framing old entry of ER room OK | DANF | DANF | | BFR | P | 4248848 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/12/2011 | room #1129 exterior perimeter smoke barrier OK to drop tile in area; room #1109 critical care, east wall above grid 2 hr core board installed need to see when dbl layer of 5/8" is installed | DANF | DANF | | BSP | P | 4247677 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/02/2011 | framing above added door #1106 at 2 hr wall OK | DANF | DANF | | BSP | P | 4243978 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | C | 11/28/2011 | framing for rooms #1025, #1026, #1028, #1029 in area 2A OK | DANF | DANF | | BFR | C | 4241319 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/16/2011 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396), External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. entry canopy at emergence department -- Schedule a new Building Final when above items are complete. | DANF | DANF | | B= | P | 4236650 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | R | 11/15/2011 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396), External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. complete overhead work on canopy installation of skin | DANF | DANF | | B= | R | 4235885 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/15/2011 | CTL engineering letter on file for welding and bolting observation and fire spray of steel for emergency room canopy | DANF | DANF | | BFR | P | 4235882 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/07/2011 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396), External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. phase 1B nurse station OK -- Schedule a new Building Final when above items are complete. | DANF | DANF | | B= | P | 4232485 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/04/2011 | entry canopy soffit framing at ER and soffit above ER door OK ; Need engineer's letter for structural steel ER canopy and letter for spray fire protection | DANF | DANF | | BFR | P | 4231285 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/02/2011 | ER canopy furred framing main north south beams OK; need stamped engineer's letter for spray fire protection of structural elements; OK to drop tiles in ER security and vestibule | DANF | DANF | | BFR | P | 4230200 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/19/2011 | Rooms #1000 and 1002 in area B1 | DANF | DANF | | BFR | P | 4224169 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 10/03/2011 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396), External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. Phase IA - Room #1013,1014,1108 OK -- Schedule a new Building Final when above items are complete. | MIKE | MIKE | | B= | P | 4216084 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/26/2011 | Phase 1A Room #1013,1014,1108 - Smoke partitions OK above ceiling | MIKE | MIKE | | BFR | P | 4212316 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | P | 09/26/2011 | OK to use CTL Thompson for foundation inspection | MIKE | MIKE | | BFN | P | 4212315 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFT | P | 09/26/2011 | OK to use CTL Thompson for footing inspection | MIKE | MIKE | | BFT | P | 4212308 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/16/2011 | Phase IA Room #1013,1014,1108 - Complete fire partition walls, Complete all rough inspections | MIKE | MIKE | | BFR | P | 4208257 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | L | 09/15/2011 | Unable to make contact with contractor | MIKE | MIKE | | BFR | L | 4208053 |
GREEN ELECTRIC INC | E= | C | 06/15/2012 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 4326986 |
GREEN ELECTRIC INC | E= | C | 06/15/2012 | | BRET | BRET | | E= | C | 4326984 |
GREEN ELECTRIC INC | ER | C | 06/05/2012 | | BRET | BRET | | ER | C | 4321517 |
GREEN ELECTRIC INC | ER | P | 05/16/2012 | walls 5A | MIKEC | MIKEC | | ER | P | 4311711 |
GREEN ELECTRIC INC | ER | P | 05/16/2012 | FIRE ALARM INSPECTION: stub ups | MIKEC | MIKEC | | ER | P | 4311704 |
GREEN ELECTRIC INC | ER | P | 05/04/2012 | administrative offices ceilings | BRET | BRET | | ER | P | 4306423 |
GREEN ELECTRIC INC | ER | P | 04/20/2012 | walls and fire alarm stub ups | MIKEC | MIKEC | | ER | P | 4299515 |
GREEN ELECTRIC INC | E= | P | 04/20/2012 | FIRE ALARM INSPECTION: partial 4B | MIKEC | MIKEC | | E= | P | 4299509 |
GREEN ELECTRIC INC | ER | P | 04/06/2012 | FIRE ALARM INSPECTION: waiting area ceiling | BRET | BRET | | ER | P | 4292998 |
GREEN ELECTRIC INC | E= | P | 04/06/2012 | partial waiting room and waiting area restrooms only | BRET | BRET | | E= | P | 4292991 |
GREEN ELECTRIC INC | ER | P | 04/06/2012 | waiting room ceiling | BRET | BRET | | ER | P | 4292989 |
GREEN ELECTRIC INC | ER | P | 03/29/2012 | see card | MIKEC | MIKEC | | ER | P | 4289365 |
GREEN ELECTRIC INC | E= | P | 03/01/2012 | rooms 1-10, greeter station | MIKEC | MIKEC | | E= | P | 4277436 |
GREEN ELECTRIC INC | ER | P | 02/16/2012 | b1-3 triage and greeter ceiling | BRET | BRET | | ER | P | 4272311 |
GREEN ELECTRIC INC | ER | P | 02/15/2012 | a 1 thru a 7 | BRET | BRET | | ER | P | 4271679 |
GREEN ELECTRIC INC | ER | P | 02/08/2012 | FIRE ALARM INSPECTION: waiting room rest room walls | BRET | BRET | | ER | P | 4269156 |
GREEN ELECTRIC INC | ER | P | 02/08/2012 | waiting room rest room walls | BRET | BRET | | ER | P | 4269154 |
GREEN ELECTRIC INC | ER | P | 02/02/2012 | walls discharge,greeter and triage area | BRET | BRET | | ER | P | 4267469 |
GREEN ELECTRIC INC | ER | P | 01/27/2012 | a 1 thru 7, b1,2 and 3 | BRET | BRET | | ER | P | 4264847 |
GREEN ELECTRIC INC | ER | P | 01/27/2012 | FIRE ALARM INSPECTION: hall/ cor room devices have been remove drawings being resubmitted | BRET | BRET | | ER | P | 4264844 |
GREEN ELECTRIC INC | ER | P | 12/22/2011 | final area 2a | BRET | BRET | | ER | P | 4252514 |
GREEN ELECTRIC INC | ER | P | 12/09/2011 | AREA 2A CEILINGS OK | TIMA | TIMA | | ER | P | 4246977 |
GREEN ELECTRIC INC | ER | P | 11/22/2011 | walls phase 2a | MIKEC | MIKEC | | ER | P | 4239564 |
GREEN ELECTRIC INC | ER | P | 11/09/2011 | EM ENTRY EXTERIOR LIGHTS. 3 IN SOFFIT ABOVE DOOR O TO COVER. | BRET | BRET | | ER | P | 4233386 |
GREEN ELECTRIC INC | ER | P | 11/02/2011 | ER ENTRY CEILING ONLY | BRET | BRET | | ER | P | 4230323 |
GREEN ELECTRIC INC | ER | P | 10/20/2011 | b1 area. | BRET | BRET | | ER | P | 4224473 |
GREEN ELECTRIC INC | ER | P | 10/20/2011 | b1 area locations marked on electricians set of plans. | BRET | BRET | | ER | P | 4224470 |
GREEN ELECTRIC INC | ER | P | 09/30/2011 | CANOPY COLUMN AND EUG FOR LIGHTS AND SIGN ONLY. | BRET | BRET | | ER | P | 4215304 |
GREEN ELECTRIC INC | ER | P | 09/14/2011 | walls ph 1 see plans | MIKEC | MIKEC | | ER | P | 4207123 |
GREEN ELECTRIC INC | ER | R | 09/08/2011 | called in wrong day | MIKEC | MIKEC | | ER | R | 4204423 |
GREEN ELECTRIC INC | EP | P | 08/31/2011 | | MIKEC | MIKEC | | EP | P | 4201186 |
COLORADO SHEET METAL CO., INC. | H= | C | 11/21/2012 | received balance report | JON | JON | | H= | C | 4427166 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 11/21/2012 | | JON | JON | | H= | C | 4427141 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 07/02/2012 | REVIEWED BALANCE REPORT, CALLED JARED AT CSM... NEED TO ADDRESS NOTES FROM BALANCE CONTRACTOR FOR MISSING AND IN OPERATIVE BALANCE DAMPERS. APPEARS SOME CFMS ARE NOT LISTED AND SOME MORE THAN 10% OFF. JARED WILL ADDRESS AND CALL INSPECTOR WHEN MORE INFORMATION IS PROVIDED. | JON | JON | | H= | P | 4334896 |
COLORADO SHEET METAL CO., INC. | H= | P | 06/05/2012 | 6 FIRE DAMPERS WITH ACCESS OK. NEED BALANCE REPORT. PHASE 5A | JACK | JACK | | H= | P | 4321655 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 05/23/2012 | Piping complete at 5-A | JON | JON | | HWP | P | 4315466 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/16/2012 | AREA 5A OK FOR WRAP AND 3 ROUND FIRE DAMPERS OK ON FRAMING. SMOKE DAMPERS OK AT ELECTRICAL ROOM AND CT ROOM, 3- DAMPERS | JON | JON | | HD | P | 4312253 |
COLORADO SHEET METAL CO., INC. | H= | P | 05/04/2012 | DUCT AND HOT WATER PIPING COMPLETE AREA 5B. | JON | JON | | H= | P | 4306349 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 04/20/2012 | HWP COMPLETE IN 4B.. OK TO INSULATE PIPING FOR 1 COIL IN 5B | JON | JON | | HWP | P | 4299577 |
COLORADO SHEET METAL CO., INC. | HD | P | 04/20/2012 | 4B DUCT COMPLETE 1ST FLOOR.... 5B 1ST FLOOR OK TO INSULATE DUCT FOR 1 VAV BOX MEDIUM AND LOW PRESSURE. | JON | JON | | HD | P | 4299571 |
COLORADO SHEET METAL CO., INC. | H= | P | 04/06/2012 | HVAC AND HWP 1ST FLOOR WAITING AREA AND BATH ROOMS COMPLETE, 32/12 DAMPER IN FRAMING IN 4B OK ALSO | JON | JON | | H= | P | 4293406 |
COLORADO SHEET METAL CO., INC. | HD | P | 04/02/2012 | BASEMENT EXHAUST BY PASS DUCT OK. | JON | JON | | HD | P | 4290962 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 04/02/2012 | inspected on 3-30-12 on hvac inspection.. ok to insulate pipe. | JON | JON | | HWP | P | 4290945 |
COLORADO SHEET METAL CO., INC. | HD | P | 03/30/2012 | NEED TO EXPOSE 32/12 DAMPER FRAMING FOR INSPECTION IN 4B. OK FOR DUCT WRAP IN 4B. OTHER 3 ROUND FIRE DAMPER OPENINGS OK IN 4B. | JON | JON | | HD | P | 4290225 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 03/23/2012 | Ok for pipe insulation in waiting area 1st floor.. Inspected 3-22-12 during HVAC inspection | JON | JON | | HWP | P | 4286700 |
COLORADO SHEET METAL CO., INC. | HD | P | 03/22/2012 | Isolation room exhaust on 2nd level roof with utility set fan complete. 3- fire dampers in house keeping area ok and ready for support angles. ok for wrap in waiting area 1st floor | JON | JON | | HD | P | 4286573 |
COLORADO SHEET METAL CO., INC. | HD | P | 02/15/2012 | AREA 3A AND 3B COMPLETE, VAV 124 OK FOR INSULATION. | JON | JON | | HD | P | 4271886 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 02/15/2012 | VAV 124 OK FOR PIPE INSULATION. AREA 3A AND 3B COMPLETE | JON | JON | | HWP | P | 4271885 |
COLORADO SHEET METAL CO., INC. | HD | P | 02/03/2012 | OK TO WRAP ROUND DUCT FOR 9 VAV'S IN 3B... CONSULTED ON SMOKE DAMPER FOR 1ST FLOOR ELECTRICAL ROOM, SMOKE DAMPER TO HAVE PROPER ACCESS AND INSTALLED PER INSTRUCTIONS, ALSO MUST HAVE APPROVAL FROM ELECTRICAL INSPECTOR FOR LOCATION. | JON | JON | | HD | P | 4267622 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 02/03/2012 | OK TO INSULATE PIPING FOR 9 RE HEAT COILS IN 3B | JON | JON | | HWP | P | 4267619 |
COLORADO SHEET METAL CO., INC. | HD | P | 01/19/2012 | OK FOR WRAP 1ST FLOOR GREETING STATION 3A, 4- VAV BOXES | JON | JON | | HD | P | 4261632 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 01/19/2012 | OK FOR PIPE INSULATION 1ST FLOOR GREETING STATION 3A | JON | JON | | HWP | P | 4261623 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 12/13/2011 | NURSES STATION AND ROOM A-8 1ST FLOOR COMPLETE. | JON | JON | | H= | P | 4248213 |
COLORADO SHEET METAL CO., INC. | H= | P | 12/13/2011 | NURSES STATION AND ROOM A-8 1ST FLOOR COMPLETE. | JON | JON | | H= | P | 4248211 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 12/02/2011 | OK FOR INSULATION FOR PIPING AT NURSES AREA AND ROOM A-8 3- RE-HEAT COILS | JON | JON | | HWP | P | 4244222 |
COLORADO SHEET METAL CO., INC. | HD | P | 12/02/2011 | OK FOR WRAP AT NURSES AREA AND ROOM A-8... 3 VAVS | JON | JON | | HD | P | 4244221 |
COLORADO SHEET METAL CO., INC. | H= | P | 11/02/2011 | Duct complete at new security 1st floor | JON | JON | | H= | P | 4230296 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 10/21/2011 | MAIN FLOOR SECURITY AND ENTRY AREA, HOT WATER FOR CABINET HEATER AND RE HEAT COIL OK FOR INSULATION. | JON | JON | | HWP | P | 4225218 |
COLORADO SHEET METAL CO., INC. | HD | P | 10/18/2011 | OK TO WRAP DUCT IN 1ST FLOOR SECURITY OFFICE 1002 ONLY. | JON | JON | | HD | P | 4222987 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 06/14/2012 | 3-SINKS AND 1-MOP SINK IN EMERGENCY DEPT. O.K | JOEL | JOEL | | P= | C | 4326180 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 05/18/2012 | | LYNNIE | LYNNIE | | PB | C | 4313097 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 04/26/2012 | AREA B | LYNNIE | LYNNIE | | P= | P | 4302248 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 04/06/2012 | FOR WAITING ROOM | LYNNIE | LYNNIE | | P= | P | 4293107 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/29/2012 | AREA B | LYNNIE | LYNNIE | | PTO | P | 4289564 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 03/02/2012 | 10 EXAM SINKS OK (NEXT TO EMERGENCY NURSE STATION) ONE OTHER IS FUTURE AFTER STORAGE USE | LEE | LEE | | P= | P | 4278027 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/10/2012 | P2.10--FIRST FLOOR----ROOMS 1006 AND 1006 | LYNNIE | LYNNIE | | PTO | P | 4269984 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/31/2012 | CALLED IN A FINAL? POD 3 OKAY | LYNNIE | LYNNIE | | PTO | P | 4266083 |
OLSON PLUMBING & HEATING COMPANY | P= | R | 01/30/2012 | NOT READY PER MIKE--OFFICE CALLED IN WRONG DAY | LYNNIE | LYNNIE | | P= | R | 4265481 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/27/2012 | WORK IS ACROSS THE HALL OF EMERGENCY ENTRANCE -- EXAM ROOMS---A1,2,3 DWV AND WATER OKAY---EXAM ROOMS B1,2,3 WATER ONLY OKAY---EXAM ROOMS A5,6,7 WATER ONLY OKAY--SINK IN HALL NEXT TO TRIAGE OKAY | LYNNIE | LYNNIE | | PTO | P | 4264832 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 12/22/2011 | POD 2A-- 1-SK 1-LAV 1-WC | LYNNIE | LYNNIE | | P= | P | 4252480 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 11/23/2011 | pb ok at this time,see tie in on final | MARTY | MARTY | | PTO | C | 4240768 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 09/30/2011 | phase -A, o.k | JOEL | JOEL | | P= | P | 4215222 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/15/2011 | phase 1a. | MARTY | MARTY | | PTO | P | 4208072 |