BASSETT CONSTRUCTION COMPANY | B= | C | 03/07/2012 | | BLAKE | BLAKE | | B= | C | 4279924 |
BASSETT CONSTRUCTION COMPANY | BFR | P | 02/01/2012 | soffit, east pocket and radius framing ok | BLAKE | BLAKE | | BFR | P | 4266902 |
BASSETT CONSTRUCTION COMPANY | BFR | P | 01/23/2012 | north receiver wall and soffit south to north column OK;; east receiver wall and soffit OK to rock back to east column | DANF | DANF | | BFR | P | 4262889 |
HVAC SOLUTIONS, INC. | BSP | T | 01/18/2012 | PAID (REC#1023212) PLAN SPLICE FEE: $50 by: RUSSELL for Mechanical: Revision to damper requirements through soffitt wall | RUSSELL | RUSSELL | | BSP | T | 4260619 |
BASSETT CONSTRUCTION COMPANY | BFR | P | 01/09/2012 | west wall soffit core board and fire caulk of penetration OK to cover with dbl layer of 5/8" rock; noted on approved plans | DANF | DANF | | BFR | P | 4257672 |
BASSETT CONSTRUCTION COMPANY | BFR | P | 01/05/2012 | core board side penetration OK; 3 5/8" stud wall framing at receiver for door north side ; return of c/b between south columns OK ; see approved plans sheet N-A-f-101 | DANF | DANF | | BFR | P | 4256423 |
BASSETT CONSTRUCTION COMPANY | BFR | P | 01/03/2012 | east door receiver core board fire caulking ; south curtain wall OK to rock with dbl 5/8"; OK to dbl rock return of south side curtain wall; received engineering judgments for core board penetration, need to complete as per details; noted on approved plans | DANF | DANF | | BFR | P | 4255363 |
BASSETT CONSTRUCTION COMPANY | BSP | P | 12/28/2011 | met with drywall super and went over penetration issues in core board. Will require several engineering judgment on the unique problems | DANF | DANF | | BSP | P | 4253841 |
BASSETT CONSTRUCTION COMPANY | BFR | P | 12/27/2011 | engineer's letter on file for soffit/headwall attachment ; need fire caulk inspection at core board penetrations and core board repairs; Engineer's letter on file for modified details for structural iron to support door being acceptable per engineer. | DANF | DANF | | BFR | P | 4253266 |
BASSETT CONSTRUCTION COMPANY | BFR | P | 12/19/2011 | core board receiver wall east end OK noted on sheet N-AF-101 of approved plans, need fire caulking; will need fire spray 2hr rating letter from engineer need detail for soffit track attachment to over head concrete | DANF | DANF | | BFR | P | 4251181 |
BASSETT CONSTRUCTION COMPANY | BFR | P | 12/15/2011 | south east pocket core board door installed | DANF | DANF | | BFR | P | 4249974 |
BASSETT CONSTRUCTION COMPANY | BFR | P | 12/14/2011 | need engineer's letter for bolting welding of angle iron attachment to roof deck | DANF | DANF | | BFR | P | 4249361 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 03/05/2012 | | GARYL | GARYL | | E= | C | 4278784 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 02/29/2012 | doors not installed | GARYL | GARYL | | E= | P | 4277240 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 02/29/2012 | doors not installed | GARYL | GARYL | | ER | P | 4277220 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/06/2012 | lid at fire door ok access panels to be cut in. call rough and final together. need to check suspended ceiling in area of work at final rest of conduit run ok. | BRET | BRET | | ER | P | 4256829 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | L | 01/05/2012 | canceled by contractor | MATTHEW | MATTHEW | | ER | L | 4256498 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | R | 12/23/2011 | cancelled by concractor | MIKEC | MIKEC | | ER | R | 4252835 |
HVAC SOLUTIONS, INC. | H= | C | 03/06/2012 | | JON | JON | | H= | C | 4279402 |
HVAC SOLUTIONS, INC. | H= | P | 03/05/2012 | NEED TO CHECK ALL SUPPORT ANGLES. NOTED PREVIOUSLY THAT ALL ANGLES ARE TO HAVE PROPER 1" OVER LAP ONTO FRAMING. 1ST DAMPER INSPECTED HAS GAP ACROSS BOTTOM. ENSURE FIRE CAULK IS REMOVED FROM ANGLES. RECALL INSPECTION | JON | JON | | H= | P | 4278900 |
HVAC SOLUTIONS, INC. | HD | C | 02/02/2012 | NEED TO ENSURE FIRE CAULK IS REMOVED FROM AROUND SUPPORT ANGLES ON DAMPERS AND RETAINING ANGLES ARE TIGHT TO STRUCTURE. NEED TO SEE OPERATION AT FINAL WITH BALANCE REPORT | JON | JON | | HD | C | 4267293 |
HVAC SOLUTIONS, INC. | HD | P | 01/24/2012 | FRAMING OK AT ALL DAMPERS. ENGINEER LETTER RECEIVED. MUST SEE EXPANSION ROOM AT DAMPERS PRIOR TO COVER EXCEPT NORTH DAMPER THIS DAMPER OK. OK FOR DUCT WRAP. NEED TO SEE PROPER ACCESS TO ALL DAMPERS AND RETAINING ANGLES WITH BALANCE REPORT BEFORE FINAL. | JON | JON | | HD | P | 4263354 |
HVAC SOLUTIONS, INC. | HD | R | 01/10/2012 | THERE WILL BE NO MORE INSPECTIONS ON THIS PROJECT WITHOUT DETAILED MANUFACTURE INSTRUCTIONS SHOWING THIS INSTALLATION. DESIGN PROFESSIONALS HAVE BEEN ALERTED TO THIS ISSUE AND THEY MUST RECTIFY THIS SITUATION. ANY THROUGH PENETRATION OF AN ASSEMBLY DOES REQUIRE PROTECTION TO CODE. ALSO AT NO TIME IS IT ALLOWED TO INSTALL FIRE DAMPERS, FIRE/SMOKE DAMPERS OR ANY TYPE OF DAMPER WITHOUT FIRST CALLING A MECHANICAL FRAME INSPECTION BEFORE COVER OF THE FRAMING FOR THESE DAMPERS. TODAYS INSPECTION WAS TO SIMPLY REITERATE PREVIOUS CONVERSATIONS OVER DAMPER INSALLATIONS AND REQUIREMENTS WITH JOB REPRESENTATIVE. | JON | JON | | HD | R | 4258063 |
HVAC SOLUTIONS, INC. | HD | P | 12/28/2011 | Plan review at office with building inspector and phone conversation with on site job representative Danny Trujio. Appears plans indicate dampers installed in structure without floor to ceiling support. Will need damper manufacturer to approve this type of installation. Also appears to be missing dampers at one side of through penetrations at same soffit area. Seems to be confusion on where fire protection only is required and smoke protection only at soffit penetrations. | JON | JON | | HD | P | 4253363 |