GERALD H PHIPPS INC | B= | C | 03/23/2012 | | BLAKE | BLAKE | | B= | C | 4287107 |
GERALD H PHIPPS INC | B= | P | 03/08/2012 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-5982, x2), MECH ONE, INC. Mechanical Final Inspection is not Completed yet. install rated door hardware -- Schedule a new Building Final when above items are complete. | BERTW | BERTW | | B= | P | 4280236 |
GERALD H PHIPPS INC | BFR | C | 03/08/2012 | | BERTW | BERTW | | BFR | C | 4280214 |
GERALD H PHIPPS INC | BSP | P | 03/06/2012 | shaft framing ok/ rec'd eng | BLAKE | BLAKE | | BSP | P | 4279372 |
GERALD H PHIPPS INC | BFR | P | 02/17/2012 | framing of corridor walls for dampers in progress | BERTW | BERTW | | BFR | P | 4272814 |
GERALD H PHIPPS INC | BFR | P | 02/09/2012 | 2hr wall supports new damper ok/need damper framing inspected | BERTW | BERTW | | BFR | P | 4269451 |
GERALD H PHIPPS INC | BSP | P | 02/08/2012 | PLAN SPLICE: (No Fee) by: JAY for Construction: Minor adjustment to wall layout | JAY | JAY | | BSP | P | 4269273 |
MECHONE, INC. | BSP | T | 02/08/2012 | PAID (REC#1027014) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice to show locations of f/s/d | DALEH | DALEH | | BSP | T | 4269259 |
GERALD H PHIPPS INC | BFR | R | 02/02/2012 | NEED NEW PROPOSED 2HR FIRE BARRIER WALL ON NEW REVISION THROUGH RBD/NO INSPECTION DONE/NEED CONSTRUCTION AND MECH REVIEW | BERTW | BERTW | | BFR | R | 4267178 |
GERALD H PHIPPS INC | BFR | P | 01/23/2012 | soffits complete | BLAKE | BLAKE | | BFR | P | 4262670 |
GERALD H PHIPPS INC | BSP | T | 01/23/2012 | PAID (REC#1024026) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELBY Add lighting on second floor to scope | SHELBY | SHELBY | | BSP | T | 4262519 |
GERALD H PHIPPS INC | BSP | P | 01/17/2012 | 1ST LAYER OF DRYWALL OK AT BEAMS | BERTW | BERTW | | BSP | P | 4260151 |
GERALD H PHIPPS INC | BFR | P | 01/17/2012 | BEAMS FRAMED FOR DRYWALL WRAPS OK | BERTW | BERTW | | BFR | P | 4260111 |
GERALD H PHIPPS INC | BFR | P | 01/13/2012 | BEAMS LIGHT GAUGE FRAMING IN PROGRESS | BERTW | BERTW | | BFR | P | 4259412 |
GERALD H PHIPPS INC | BFR | P | 01/11/2012 | east beam framing for drywall wrap ok/need all beams inspected for framing wraps | BERTW | BERTW | | BFR | P | 4258605 |
GERALD H PHIPPS INC | BSP | P | 12/30/2011 | shaft liner system fire barrier ok | BERTW | BERTW | | BSP | P | 4254385 |
GERALD H PHIPPS INC | BSP | P | 12/29/2011 | shaft liner installed at last 2 columns ok | BERTW | BERTW | | BSP | P | 4253974 |
GERALD H PHIPPS INC | BSP | P | 12/28/2011 | columns 6-7 wrapped 3 layers type-x ok/shaft liner ok over columns 1 thru 5/need 6-7 shaft installed | BERTW | BERTW | | BSP | P | 4253724 |
GERALD H PHIPPS INC | BSP | P | 12/23/2011 | columns 1 thru 5 wrapped ok with 3 layers type-x | BERTW | BERTW | | BSP | P | 4252738 |
GERALD H PHIPPS INC | BSP | P | 12/22/2011 | 5 columns- 3 layers of type-x sheetrock ok/need 2 more west inspected | BERTW | BERTW | | BSP | P | 4252450 |
GERALD H PHIPPS INC | BSP | P | 12/21/2011 | all columns have 2 layers of type-x wraps ok | BERTW | BERTW | | BSP | P | 4251906 |
GERALD H PHIPPS INC | BFR | P | 12/21/2011 | engineering on file for deletion of east beam support column on file | BERTW | BERTW | | BFR | P | 4251903 |
GERALD H PHIPPS INC | BSP | P | 12/20/2011 | 6 columns wraps 2 sides with 3 layers type-x ok/need 1 more column inspected for 3layers/engineering on file for beam connection revision/need headwall firesafing detail at core board system | BERTW | BERTW | | BSP | P | 4251347 |
GERALD H PHIPPS INC | BFR | P | 12/19/2011 | reveiwed colums wraps with Jeff the new framer on this job | BERTW | BERTW | | BFR | P | 4250817 |
GERALD H PHIPPS INC | BSP | P | 12/16/2011 | review how to construct and inspections for columns with Steve job super | BERTW | BERTW | | BSP | P | 4250356 |
GERALD H PHIPPS INC | BSP | R | 12/14/2011 | column wraps not installed per listing/rework to approved design and reinspect or provide engineering observation letter for all column wraps /contractor to provide all UL listings needed for inspections to inspector at jobsite | BERTW | BERTW | | BSP | R | 4249018 |
GERALD H PHIPPS INC | BFR | R | 12/14/2011 | columns not furred out per ul listing design/shiney 90 used in lieu of 1 5/8" studs | BERTW | BERTW | | BFR | R | 4249016 |
GERALD H PHIPPS INC | BFR | P | 12/13/2011 | core board ok at 2hr fire barrier south wall to underside of lintel only-still need framing above lintel support to roof inspected/all supporting columns for beam supports covered without connection inspections/remove sheetrock from all columns for inspections/need 3 layers and framing inspected at columns tha were wraped before inspection | BERTW | BERTW | | BFR | P | 4248150 |
E LIGHT ELECTRIC SERVICES, INC | E= | C | 02/15/2012 | | GARYL | GARYL | | E= | C | 4272138 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 01/17/2012 | soffit ok need access panels or conduits rolled down for 2 boxes in hardlid line 14 and 15. | BRET | BRET | | ER | P | 4259923 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 12/14/2011 | prerock fire wall ok | BRET | BRET | | ER | P | 4248790 |
E LIGHT ELECTRIC SERVICES, INC | ER | R | 12/13/2011 | need location or poc# | BRET | BRET | | ER | R | 4248054 |
MECHONE, INC. | H= | C | 03/13/2012 | | JON | JON | | H= | C | 4282457 |
MECHONE, INC. | HD | L | 03/12/2012 | no call ahead, found no one on site | JON | JON | | HD | L | 4281525 |
MECHONE, INC. | HD | P | 03/08/2012 | SEE OTHER NOTES | JON | JON | | HD | P | 4280360 |
MECHONE, INC. | H= | P | 03/08/2012 | LAST FIRE DAMPER TO HAVE PROPER ANGLE BE HIND TO CLOSE OFF GAP ANDS HELP RETAIN DAMPER. SAME GOES WITH THE SIDE WITH THE DOUBLE ACTUATOR. | JON | JON | | H= | P | 4280357 |
MECHONE, INC. | HD | P | 03/02/2012 | 36/14 DAMPER FIRST FLOOR COMPLETE WITH ANGLES | JON | JON | | HD | P | 4278233 |
MECHONE, INC. | HD | P | 03/01/2012 | 1 - 36/14 OVAL DAMPER 1ST FLOOR FRAME OK. 1 -16/14 RECTANGULAR DAMPER FRAME AND ANGLES OK. | JON | JON | | HD | P | 4277781 |
MECHONE, INC. | HD | P | 02/23/2012 | 2ND FLOOR 36/14 OVAL DAMPER. COMPLETE. 2ND FLOOR STORE ROOM DAMPER 35/22 COMPLETE. NEED ACCESS DOORS FOR DAMPERS LABELED ON GRID BEFORE FINAL | JON | JON | | HD | P | 4274857 |
MECHONE, INC. | HD | P | 02/09/2012 | framing for 1 - 50 x 16 fire smoke damper ok. | JON | JON | | HD | P | 4269692 |
MECHONE, INC. | HD | R | 02/02/2012 | NEED APPROVED PLANS AND INSTRUCTIONS ON SITE CALLED CONTRACTOR | JON | JON | | HD | R | 4267212 |