COLARELLI CONSTRUCTION, INC. | B= | C | 03/21/2012 | | DANF | DANF | | B= | C | 4285722 |
COLARELLI CONSTRUCTION, INC. | BFR | C | 03/21/2012 | plans revised to delete kickers | DANF | DANF | | BFR | C | 4285713 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 03/21/2012 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: revised detail E4 on A-102 | SHELLEY | SHELLEY | | BSP | P | 4285571 |
COLARELLI CONSTRUCTION, INC. | B= | R | 03/14/2012 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-5982, x2), HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, RYBA ELECTRIC, INC. Electrical Final Inspection is not Completed yet. 1) fire final 2) electrical final 3) heating final 4) complete framing inspection 5) missing exit sign above added north exit door | DANF | DANF | | B= | R | 4283027 |
COLARELLI CONSTRUCTION, INC. | BFR | R | 03/14/2012 | need kicker on interior overhead door; added 3' door lentil not done per detail | DANF | DANF | | BFR | R | 4283024 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 03/01/2012 | interior over head door in metal dept missing kickers to box beam | DANF | DANF | | BFR | P | 4277588 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 02/22/2012 | roof top angle support welding for duct work venting OK; still need over head door framing completed | DANF | DANF | | BSP | P | 4274060 |
COLARELLI CONSTRUCTION, INC. | BSP | T | 02/17/2012 | PAID (REC#1028721) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELBY | SHELBY | SHELBY | | BSP | T | 4273023 |
COLARELLI CONSTRUCTION, INC. | BSP | T | 02/09/2012 | PAID (REC#1028721) PLAN SPLICE FEE: $50 by: MICHAEL for Construction: Revise door types and add installation details | MICHAELA | MICHAELA | | BSP | T | 4269714 |
COLARELLI CONSTRUCTION, INC. | BSP | R | 01/18/2012 | no inspection; rebar in slab on grade | DANF | DANF | | BSP | R | 4260609 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 01/12/2012 | office walls OK; need overhead door infill | DANF | DANF | | BFR | P | 4259147 |
COLARELLI CONSTRUCTION, INC. | BFN | C | 01/12/2012 | | DANF | DANF | | BFN | C | 4259146 |
COLARELLI CONSTRUCTION, INC. | BSP | C | 01/06/2012 | | DANF | DANF | | BSP | C | 4257090 |
RYBA ELECTRIC, INC. | E= | C | 03/20/2012 | | GARYL | GARYL | | E= | C | 4285383 |
RYBA ELECTRIC, INC. | E= | P | 03/14/2012 | office and break room ok----------------------paint mixing room,prep.area and spray booths ,, remove all electric 3 feet from opening bond disconnects remove seal tite from ducts paint mixing room not complete need to verify if prep room concerted a spray booth or open spray area gfci all outlets compete re-inspect | MATTHEW | MATTHEW | | E= | P | 4282912 |
RYBA ELECTRIC, INC. | E= | R | 03/13/2012 | Several circuits off/dead. Need POC and need blue prints on site====couldn't find anyone on site | GARYL | GARYL | | E= | R | 4282341 |
SIMPLEX GRINNELL, LP. | E= | C | 02/29/2012 | FIRE ALARM INSPECTION: | GARYL | GARYL | | E= | C | 4277254 |
SIMPLEX GRINNELL, LP. | ER | C | 02/29/2012 | FIRE ALARM INSPECTION: | GARYL | GARYL | | ER | C | 4277252 |
RYBA ELECTRIC, INC. | ER | P | 02/21/2012 | ceilings thru out | GARYL | GARYL | | ER | P | 4273845 |
RYBA ELECTRIC, INC. | ER | P | 01/12/2012 | walls only===marked and dated on blue prints that were on site | GARYL | GARYL | | ER | P | 4258989 |
HVAC SOLUTIONS, INC. | H= | C | 03/19/2012 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 4284168 |
HVAC SOLUTIONS, INC. | H= | P | 03/15/2012 | PAINT BOOTH FACTORY START UP READINGS RECEIVED AND SCANNED. | NANCY | NANCY | | H= | P | 4283625 |
HVAC SOLUTIONS, INC. | H= | P | 03/12/2012 | ADD PAINT BOOTH TO LIST OF SCOPE OF WORK. PROVIDE INSTALLATION INSTRUCTIONS FOR PAINT BOOTH, QUESTIONS ABOUT TERMINATION LOCATIONS, SECURING OF COOLERS, SCREEN ON EXHAUST ETC. PROVIDE INSTALLATION INSTRUCTIONS FOR RADIANT HEATERS. NEED 1 INCH CLEARANCE FROM HEATER VENTS TO COMBUSTIBLES. PROVIDE START UP CERTIFICATION FOR PAINT BOOTHS. | NANCY | NANCY | | H= | P | 4281782 |
HVAC SOLUTIONS, INC. | H= | P | 03/08/2012 | TEST AND BALANCE REPORT RECEIVED FOR RTU'S. STILL NEED START UP PAPERWORK ON PAINT BOOTHS. | NANCY | NANCY | | H= | P | 4280705 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 03/06/2012 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 4279177 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 02/29/2012 | 3,300,000 BTU'S ADDED TO EXISTING 2 LB METER. | NANCY | NANCY | | HC | C | 4277188 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 02/29/2012 | TWO 60 LB TESTS OK. INSTALLED AS PER PRINTS. FOR FINAL INSTALL REGULATORS, HOOK UP EQUIPMENT AND COMPLETE LABELING OF MEDIUM PRESSURE GAS LINES TO PAINT BOOTHS. | NANCY | NANCY | | HI | C | 4277186 |
HVAC SOLUTIONS, INC. | HD | P | 02/21/2012 | ROUGH DUCT ABOVE OFFICE CEILING OK. SUPPLY AND EXHAUST DUCT FOR PAINT BOOTH OK UP TO ROOF. BY FINAL NEED REVISED/APPROVED PRINTS SHOWING RETURN AIR BEING DELETED IN OFFICE. | NANCY | NANCY | | HD | P | 4273646 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 03/06/2012 | | LEE | LEE | | P= | C | 4279135 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 03/06/2012 | | LEE | LEE | | PTO | C | 4279130 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 01/17/2012 | | LYNNIE | LYNNIE | | PB | C | 4260545 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 01/12/2012 | FOR SINK--FLOOR INTERCEPTOR IN SHOP TO COME | LYNNIE | LYNNIE | | PTO | P | 4259265 |