ELDER CONSTRUCTION, INC. | B= | C | 07/17/2012 | all other final inspections completed | BPHILLIPS | BPHILLIPS | | B= | C | 4342958 |
ELDER CONSTRUCTION, INC. | B= | P | 07/16/2012 | Additional Inspections Required: SIMMONS MECHANICAL Mechanical Final Inspection is not Completed yet. received eng report for roof top units/ rec'd plumb final inspection copy/ state elec signed off on card by "CDC" | BLAKE | BLAKE | | B= | P | 4342266 |
ELDER CONSTRUCTION, INC. | B= | P | 07/02/2012 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-5982, x2), RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet, SIMMONS MECHANICAL Mechanical Final Inspection is not Completed yet. met with rob 499-9247 1- need cove base installed at both middle restrooms 2- remove exit signage at room 134 where doors have been replaced with windows 3- need grab bars and partitions installed at both sw restrooms 4- need copies of final state plumb and elec inspections 5- ok to move furniture in -- Schedule a new Building Final when above items are complete. | BLAKE | BLAKE | | B= | P | 4335252 |
ELDER CONSTRUCTION, INC. | BFR | P | 07/02/2012 | need copies of state elec and plumbing rough inspections | BLAKE | BLAKE | | BFR | P | 4335246 |
ELDER CONSTRUCTION, INC. | BSP | P | 06/25/2012 | Fee charged by mechanical | SHELBY | SHELBY | | BSP | P | 4331773 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | T | 06/25/2012 | PAID (REC#1054343) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice pages | TCRIPPEN | TCRIPPEN | | BSP | T | 4331734 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | T | 06/01/2012 | PAID (REC#1048822) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: replaced six existing rtu's with new rtu's and gas piping | DALEH | DALEH | | BSP | T | 4319594 |
ELDER CONSTRUCTION, INC. | BIN | C | 05/10/2012 | exterior walls ok | BERTW | BERTW | | BIN | C | 4309074 |
ELDER CONSTRUCTION, INC. | BFR | P | 05/10/2012 | walls ok pending other rough inspections completed/need engineering for RTU x14 roof supporting | BERTW | BERTW | | BFR | P | 4309066 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 07/06/2012 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 4337464 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 06/29/2012 | HVAC FINAL PENDING BALANCE REPORT. ROOF WORK OK. | LYNNS | LYNNS | | H= | P | 4334066 |
SIMMONS MECHANICAL | HC | C | 06/22/2012 | RELEASE METER, 2# SYSTEM. | LYNNS | LYNNS | | HC | C | 4330794 |
SIMMONS MECHANICAL | HI | C | 06/22/2012 | 1- 55# AND 2- 10# TESTS AND SIZING OK. NEED TO LABEL ROOF AND INSTALL LIMITER CAPS. INSTALL A RISER SUPPORT ABOVE METER. | LYNNS | LYNNS | | HI | C | 4330792 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 06/08/2012 | ABOVE CEILING ALL OK. OK FOR TILES PER MECHANICAL ONLY. | NANCY | NANCY | | HD | P | 4323469 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 06/01/2012 | Permit scope to match job for rtu's. Plans show duct heaters installed and not to reuse unit heaters. Gas piping will have to be revised as well. New duct on all units ok in space, Ready for flex and diffusers. | JON | JON | | HD | P | 4319981 |