GERALD H PHIPPS INC | B= | C | 01/23/2013 | | BLAKE | BLAKE | | B= | C | 4459034 |
MECHONE, INC. | BSP | T | 01/17/2013 | PAID (REC#1107051) PLAN SPLICE FEE: $50 by: DALEH for Mechanical | DALEH | DALEH | | BSP | T | 4456275 |
GERALD H PHIPPS INC | B= | P | 10/10/2012 | Additional Inspections Required: HARMON-BONDED Plumbing Final Inspection is not Completed yet, MECH ONE, INC. Mechanical Final Inspection is not Completed yet. need all other finals completed -- Schedule a new Building Final when above items are complete. | BLAKE | BLAKE | | B= | P | 4399046 |
GERALD H PHIPPS INC | BFR | P | 08/27/2012 | All ok need framing and details at hood / chase at chemo room. | ROGER | ROGER | | BFR | P | 4369876 |
GERALD H PHIPPS INC | BFR | P | 08/09/2012 | Shaft frame at room 1475 only. Ok | ROGER | ROGER | | BFR | P | 4358590 |
GERALD H PHIPPS INC | BFR | P | 08/03/2012 | BFR for temp shaft at 2nd flood O.R. to roof for future chemo hood. | ROGER | ROGER | | BFR | P | 4355288 |
E LIGHT ELECTRIC SERVICES, INC | E= | C | 09/27/2012 | choke both ends of conduit with gec | BRET | BRET | | E= | C | 4390134 |
E LIGHT ELECTRIC SERVICES, INC | ER | C | 09/26/2012 | ceilings except filters | CRAIGS | CRAIGS | | ER | C | 4389345 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 09/17/2012 | consultation | BRET | BRET | | ER | P | 4382615 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 09/11/2012 | hard lids complete | GARYL | GARYL | | ER | P | 4379177 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 08/27/2012 | wall and temp exhaust fans see plans. | BRET | BRET | | ER | P | 4369584 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 08/23/2012 | partial walls see plans, roof wiring of exhaust fans ok not made to motor control center at this time. | BRET | BRET | | ER | P | 4367659 |
MECHONE, INC. | H= | C | 01/23/2013 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 4458591 |
MECHONE, INC. | H= | P | 12/24/2012 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | P | 4445071 |
MECHONE, INC. | H= | P | 11/01/2012 | NEED REVISED/APPROVED PRINTS SHOWING NEW EXHAUST FANS ON ROOF AND REVISIONS TO PHARMACY/ROBOT/ORDER ENTRY AREA. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4414127 |
MECHONE, INC. | HD | P | 09/28/2012 | DUCTS, FLEX, DIFFUSERS, STEAM AND CONDENSATE LINES ABOVE CEILING IN PHARMACY AREA ALL OK. OK FOR TILES PER MECHANICAL ONLY. STILL NEED TO SEE CHEMO HOODS AND EXHAUST ON ROOF. | NANCY | NANCY | | HD | P | 4391122 |
MECHONE, INC. | HWP | C | 09/20/2012 | ABOVE CEILING STEAM LINES AND CONDENSATE DRAINS FROM TWO HUMIDIFIERS OK, OK TO INSULATE. FOR FINAL COMPLETE INSTALLATION OF CONDENSATE DRAINS INTO TOP OF HUMIDIFIERS. | NANCY | NANCY | | HWP | C | 4385523 |
MECHONE, INC. | HD | P | 09/05/2012 | OK TO WRAP ALL LOW PRESSURE DUCTS. | NANCY | NANCY | | HD | P | 4375536 |
MECHONE, INC. | HD | P | 08/20/2012 | 2- exhaust ducts from 2nd floor Mechanical room up through roof is ready for shaft enclosure. | JON | JON | | HD | P | 4365071 |
MECHONE, INC. | HD | P | 08/06/2012 | FIRST FLOOR RADIOLOGY SHAFT, 8 INCH AND 12 INCH EXHAUST DUCT BOTH OK, OK FOR SHAFT. | NANCY | NANCY | | HD | P | 4355520 |
MECHONE, INC. | HD | P | 08/02/2012 | TEMPORARY CHEMO EXHAUST DUCT OK, OK TO BUILD SHAFT. | NANCY | NANCY | | HD | P | 4353654 |
MECHONE, INC. | HD | P | 06/25/2012 | NOTE ADDED 6/26/12: THIS INSPECTION WAS FOR PERMIT I13723. BASEMENT: TWO CHEMO EXHAUST DUCTS OK, OK FOR SHAFT CONSTRUCTION. | NANCY | NANCY | | HD | P | 4331326 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | C | 12/27/2012 | TWO PERMITS WERE PULLED FOR SAME JOB---SEE HISTORY ON PERMIT I13723 | LYNNIE | LYNNIE | | P= | C | 4445765 |