GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 12/05/2012 | All other required Final inspections are complete. (This is a computer generated result) | JOHNP | JOHNP | | B= | C | 4434735 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 12/05/2012 | Need electric final | JOHNP | JOHNP | | B= | P | 4434078 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 11/13/2012 | PAID (REC#1094148) PLAN SPLICE FEE: $50 by: SHELBY for Electrical | SHELBY | SHELBY | | BSP | T | 4421203 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/13/2012 | All but new area OK -- Schedule a new Building Final when above items are complete. | JOHNP | JOHNP | | B= | P | 4420362 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | C | 11/13/2012 | New area OK | JOHNP | JOHNP | | BFR | C | 4420348 |
COLORADO SHEET METAL CO., INC. | BSP | P | 10/30/2012 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical | DALEH | DALEH | | BSP | P | 4412053 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/10/2012 | Firecaulk above grid in store room & West wall OK | JOHNP | JOHNP | | BFR | P | 4398538 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/07/2012 | need MEP roughs | BLAKE | BLAKE | | BFR | P | 4377941 |
COLORADO SHEET METAL CO., INC. | BSP | P | 07/26/2012 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: splice for relocating duct | DALEH | DALEH | | BSP | P | 4348941 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/26/2012 | fee charged by construction | SHELBY | SHELBY | | BSP | P | 4348935 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 07/26/2012 | PAID (REC#1076792) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: floor plan change | SHELLEY | SHELLEY | | BSP | T | 4348924 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 07/26/2012 | PAID (REC#1070940) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: new splice pages | TCRIPPEN | TCRIPPEN | | BSP | T | 4348916 |
GREEN ELECTRIC INC | E= | C | 12/05/2012 | | CRAIGS | CRAIGS | | E= | C | 4434734 |
GREEN ELECTRIC INC | E= | C | 12/05/2012 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | E= | C | 4434733 |
GREEN ELECTRIC INC | ER | C | 12/05/2012 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | ER | C | 4434731 |
GREEN ELECTRIC INC | E= | C | 11/30/2012 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | E= | C | 4431909 |
GREEN ELECTRIC INC | ER | C | 11/30/2012 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | ER | C | 4431899 |
GREEN ELECTRIC INC | ER | C | 11/14/2012 | | CRAIGS | CRAIGS | | ER | C | 4422351 |
GREEN ELECTRIC INC | E= | T | 10/31/2012 | PAID (REC#1094258): | JOSEPH | JOSEPH | | E= | T | 4412908 |
GREEN ELECTRIC INC | E= | P | 10/30/2012 | inspected all rooms marked on plans sheet e124 and inspected new panel L4C | JOSEPH | JOSEPH | | E= | P | 4411748 |
GREEN ELECTRIC INC | E= | C | 10/30/2012 | FIRE ALARM INSPECTION: | JOSEPH | JOSEPH | | E= | C | 4411742 |
GREEN ELECTRIC INC | ER | C | 10/09/2012 | FIRE ALARM INSPECTION: fire alarm conduits | MIKEC | MIKEC | | ER | C | 4397650 |
GREEN ELECTRIC INC | ER | P | 10/09/2012 | Reopemed by Dean to allow another ER inspection for splice. | MIKEC | MIKEC | | ER | P | 4397641 |
GREEN ELECTRIC INC | ER | P | 09/07/2012 | walls | MIKEC | MIKEC | | ER | P | 4377575 |
GREEN ELECTRIC INC | E= | R | 09/07/2012 | FIRE ALARM INSPECTION: not ready for final | MIKEC | MIKEC | | E= | R | 4377574 |
GREEN ELECTRIC INC | ER | P | 09/07/2012 | FIRE ALARM INSPECTION: stub ups | MIKEC | MIKEC | | ER | P | 4377572 |
COLORADO SHEET METAL CO., INC. | H= | C | 11/07/2012 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 4417338 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 11/02/2012 | | LYNNIE | LYNNIE | | H= | C | 4414773 |
COLORADO SHEET METAL CO., INC. | H= | P | 10/10/2012 | MECHANICAL FINAL OK PENDING REVISED/APPROVED PRINTS SHOWING RETURN AIR TRANSFER DUCT, RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4398943 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 10/09/2012 | HOT WATER PIPING TO 11 VAV'S ALL OK. OK TO INSULATE. FOR FINAL CHANGE SCOPE OF WORK TO SHOW PIPING TO 11 VAV'S AND ONE HUMIDIFIER. INSTALL HUMIDIFIER. | NANCY | NANCY | | HWP | C | 4397724 |
COLORADO SHEET METAL CO., INC. | HD | P | 09/12/2012 | TWO FIRE DAMPER FRAMES OK. SPACING AROUND FIRE DAMPERS OK, OK FOR ANGLES ON BOTH SIDES OF WALLS TO BE INSTALLED. REHEAT COILS INSTALLED. | NANCY | NANCY | | HD | P | 4380449 |
COLORADO SHEET METAL CO., INC. | HD | P | 09/05/2012 | ROUGH DUCTS ABOVE CEILING, LOW AND MEDIUM PRESSURE, ALL OK TO WRAP. NEED INSTALLATION INSTRUCTIONS FOR TWO FIRE DAMPERS, OK TO ROCK ONE SIDE OF SOILED LINEN ROOM. STILL NEED TO SEE MISSING REHEAT COILS, FLEX AND DIFFUSERS INSTALLED. BY FINAL NEED REVISED/APPROVED PRINTS SHOWING TRANSFER DUCT FOR RETURN AIR BACK TO EXISTING UNIT. | NANCY | NANCY | | HD | P | 4375798 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 11/02/2012 | PERMIT CORRECTED | LYNNIE | LYNNIE | | P= | C | 4415222 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 09/06/2012 | GET WASHER BOX ON PERMIT | LYNNIE | LYNNIE | | PTO | C | 4376570 |