GERALD H PHIPPS INC | B= | C | 12/27/2012 | no frame was involved for phases 1, 3,4.5 and 8 | BLAKE | BLAKE | | B= | C | 4445959 |
GERALD H PHIPPS INC | BFR | P | 12/19/2012 | above ceiling fire caulking ok | BLAKE | BLAKE | | BFR | P | 4443257 |
GERALD H PHIPPS INC | BFR | R | 11/07/2012 | phase #7 door infill ok/need friecaulking inspection | BERTW | BERTW | | BFR | R | 4417349 |
GERALD H PHIPPS INC | BFR | P | 10/22/2012 | met with tony 466-7370 - "phase 6" ok (new recessed doors) | BLAKE | BLAKE | | BFR | P | 4406860 |
GERALD H PHIPPS INC | BFR | P | 08/15/2012 | phase #2 ok | BERTW | BERTW | | BFR | P | 4362235 |
FOSTER ELECTRIC CORPORATION | E= | C | 12/27/2012 | | BRET | BRET | | E= | C | 4445917 |
FOSTER ELECTRIC CORPORATION | E= | P | 12/14/2012 | need paper work installation instructions on ups for proper bonding and grounding. | BRET | BRET | | E= | P | 4440230 |
FOSTER ELECTRIC CORPORATION | ER | C | 11/08/2012 | lab 0670 printer outlet | BRET | BRET | | ER | C | 4418307 |
FOSTER ELECTRIC CORPORATION | ER | P | 08/15/2012 | 1/2 wall lab 670 c | BRET | BRET | | ER | P | 4362103 |
COMMERCIAL DESIGN ENGEERING LTD | H= | C | 11/13/2012 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 4421461 |
COMMERCIAL DESIGN ENGEERING LTD | H= | P | 10/12/2012 | PHASE 5: ABOVE CEILING ALL OK. OK FOR TILES PER MECHANICAL ONLY. HOOD OK. MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4400389 |
COMMERCIAL DESIGN ENGEERING LTD | HD | P | 10/03/2012 | PHASE 5 ( LAB SUPPORT SERVICE 0670): TWO SUPPLY RUNS ABOVE CEILING OK, OK TO WRAP. NEED TO SEE WRAP AND SLOT HOOD INSTALLED. | NANCY | NANCY | | HD | P | 4394367 |
COMMERCIAL DESIGN ENGEERING LTD | HD | P | 10/03/2012 | CALLED AND LEFT MESSAGE AT 9:20 AM. WAITED AT DOCK AREA UNTIL 9:50 AM. | NANCY | NANCY | | HD | P | 4393994 |
COMMERCIAL DESIGN ENGEERING LTD | HD | P | 09/26/2012 | PHASE 4 ( LAB 0670C AND SUPERVISOR 0635A): ABOVE CEILING ALL OK. OK FOR TILES PER MECHANICAL ONLY. | NANCY | NANCY | | HD | P | 4389248 |
COMMERCIAL DESIGN ENGEERING LTD | HD | P | 09/19/2012 | PHASE 4 (LAB 0670C AND SUPERVISOR 0635A): ROUGH DUCTS ABOVE CEILING OK, OK TO WRAP. NEED TO SEE WRAP AND DIFFUSERS BEFORE CEILING TILES ARE INSTALLED. PHASE 2 (LAB 0670B): ABOVE CEILING OK, OK FOR TILES PER MECHANICAL ONLY. | NANCY | NANCY | | HD | P | 4384471 |
COMMERCIAL DESIGN ENGEERING LTD | HD | P | 08/16/2012 | PHASE 2 (LAB 0670B): ROUGH DUCTS ABOVE CEILING OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 4363034 |
COMMERCIAL DESIGN ENGEERING LTD | P= | C | 11/30/2012 | | LYNNIE | LYNNIE | | P= | C | 4431133 |
COMMERCIAL DESIGN ENGEERING LTD | PTO | C | 11/30/2012 | | LYNNIE | LYNNIE | | PTO | C | 4431131 |
COMMERCIAL DESIGN ENGEERING LTD | PB | C | 08/31/2012 | | JOEL | JOEL | | PB | C | 4373583 |
COMMERCIAL DESIGN ENGEERING LTD | P= | P | 08/24/2012 | SINK IN ROOM 0670B--FLOOR SINK NEXT TO SINK IS NOW CONSEALED BY CABINET FLOOR SEE AT NEXT INSPECTION | LYNNIE | LYNNIE | | P= | P | 4368739 |
COMMERCIAL DESIGN ENGEERING LTD | PTO | R | 08/23/2012 | NOT READY | LYNNIE | LYNNIE | | PTO | R | 4367693 |
COMMERCIAL DESIGN ENGEERING LTD | PTO | P | 08/16/2012 | PHASE ONE: SEE VENT TIE INS BY FINALS X2 | LYNNIE | LYNNIE | | PTO | P | 4363114 |
COMMERCIAL DESIGN ENGEERING LTD | PTO | P | 08/15/2012 | LAB ROOM 0670b ACID WASTE | LYNNIE | LYNNIE | | PTO | P | 4362077 |
COMMERCIAL DESIGN ENGEERING LTD | PB | P | 08/10/2012 | LAB ROOM 0670b ACID WASTE | LYNNIE | LYNNIE | | PB | P | 4359080 |