ELEVATION HOMES, LLC | B= | C | 01/14/2013 | | JIMP | JIMP | | B= | C | 4454159 | ELEVATION HOMES, LLC | B= | P | 01/10/2013 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: enijkamp@springsgov.com or 385-5977). sump pump drain not installed; no back flow preventor -- Schedule a new Building Final when above items are complete. | JIMP | JIMP | | B= | P | 4452396 | ELEVATION HOMES, LLC | BIN | C | 11/29/2012 | | JIMP | JIMP | | BIN | C | 4430619 | ELEVATION HOMES, LLC | BFR | C | 11/29/2012 | | JIMP | JIMP | | BFR | C | 4430617 | ELEVATION HOMES, LLC | BFR | P | 11/27/2012 | OK to insulate; block above beam in basement with bearing wall above where HVAC installed; finish firestop of chases | JIMP | JIMP | | BFR | P | 4428782 | ELEVATION HOMES, LLC | BLA | C | 11/27/2012 | | JIMP | JIMP | | BLA | C | 4428777 | ELEVATION HOMES, LLC | BSP | P | 11/09/2012 | front porch framing ok | JIMP | JIMP | | BSP | P | 4419856 | ELEVATION HOMES, LLC | BSP | P | 10/24/2012 | front porch pier ok | JIMP | JIMP | | BSP | P | 4408216 | ELEVATION HOMES, LLC | BFT | C | 10/19/2012 | engineers report scanned in on inspection | JIMP | JIMP | | BFT | C | 4405158 | ELEVATION HOMES, LLC | BFN | C | 10/19/2012 | engineer's report on inspection of foundation scanned in; isolate pads and float walls; drain usab le space; 5% grade at final; eufer ground installed | JIMP | JIMP | | BFN | C | 4405155 | ELEVATION HOMES, LLC | BFD | C | 10/19/2012 | | JIMP | JIMP | | BFD | C | 4405150 | ELEVATION HOMES, LLC | BFT | R | 10/18/2012 | no engineers inspection paperwork on site | JIMP | JIMP | | BFT | R | 4404307 | ELEVATION HOMES, LLC | BFN | R | 10/18/2012 | no engineers inspection paperwork on site | JIMP | JIMP | | BFN | R | 4404306 | ELEVATION HOMES, LLC | BFD | R | 10/18/2012 | no engineers inspection paperwork on site | JIMP | JIMP | | BFD | R | 4404304 | ELEVATION HOMES, LLC | BFN | P | 10/12/2012 | AUTHORIZED INSPECTION BY ENGINEER | MINDY | MINDY | MINDY | BFN | P | 4400967 | ELEVATION HOMES, LLC | BFT | P | 10/12/2012 | AUTHORIZED INSPECTION BY ENGINEER | MINDY | MINDY | MINDY | BFT | P | 4400966 | POSITIVE ELECTRIC, LLC | E= | C | 01/08/2013 | a/c rough | CRAIG | CRAIG | | E= | C | 4450366 | POSITIVE ELECTRIC, LLC | ER | C | 11/21/2012 | unfinished basement note:spare circuits in mech. room | MIKEC | MIKEC | | ER | C | 4426473 | POSITIVE ELECTRIC, LLC | ES | C | 11/21/2012 | Residential Underground: new 150 amp service | MIKEC | MIKEC | | ES | C | 4426469 | BRUNO'S HEATING & COOLING | H= | C | 01/08/2013 | OK | MICHAELS | MICHAELS | | H= | C | 4450882 | BRUNO'S HEATING & COOLING | HC | C | 11/27/2012 | RELEASE METER | MICHAELS | MICHAELS | | HC | C | 4428493 | BRUNO'S HEATING & COOLING | HRR | C | 11/27/2012 | B-vent now has clearance. | MICHAELS | MICHAELS | | HRR | C | 4428490 | BRUNO'S HEATING & COOLING | HRR | R | 11/26/2012 | Rear of framing still within 1" of b-vent. | MICHAELS | MICHAELS | | HRR | R | 4427630 | BRUNO'S HEATING & COOLING | HRR | P | 11/21/2012 | Framing is against b-vent. All other corrections made. | MICHAELS | MICHAELS | | HRR | P | 4426532 | BRUNO'S HEATING & COOLING | HRR | P | 11/20/2012 | Furnace model does not match plan, b-vent framing not complete on main, upper bath exhaust not vented, plan shows OSA, none installed. Note: UB, direct vent furnace, a/c rough(coil and lineset). | MICHAELS | MICHAELS | | HRR | P | 4425747 | DOUBLE J GAS, INC. | HI | C | 11/14/2012 | 10# test ok. 1 1/4" main to furn, w/h, range, fp. | MICHAELS | MICHAELS | | HI | C | 4421801 | TEAM PLUMBING, INC. | P= | C | 01/09/2013 | HAS PVB FOR IRRIGATION | LEE | LEE | | P= | C | 4451961 | TEAM PLUMBING, INC. | PTO | C | 11/16/2012 | UB | LYNNIE | LYNNIE | | PTO | C | 4423685 | TEAM PLUMBING, INC. | PB | C | 10/26/2012 | | LEE | LEE | | PB | C | 4410362 |
|
|