ECHO CONSTRUCTION AND REMODELING INC. | B= | C | 07/31/2013 | All other required Final inspections are complete. (This is a computer generated result) | JOND | JOND | | B= | C | 4575219 |
ECHO CONSTRUCTION AND REMODELING INC. | B= | P | 07/25/2013 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). finished basement | JOND | JOND | | B= | P | 4571975 |
ECHO CONSTRUCTION AND REMODELING INC. | BFR | C | 06/10/2013 | | JOND | JOND | | BFR | C | 4539571 |
ECHO CONSTRUCTION AND REMODELING INC. | BLA | C | 05/06/2013 | | JOND | JOND | | BLA | C | 4517884 |
ECHO CONSTRUCTION AND REMODELING INC. | BTR | C | 04/30/2013 | | JOND | JOND | | BTR | C | 4514533 |
ECHO CONSTRUCTION AND REMODELING INC. | BTR | R | 04/29/2013 | can't have nails inside of w-valley | JOND | JOND | | BTR | R | 4514178 |
ECHO CONSTRUCTION AND REMODELING INC. | BFR | P | 04/25/2013 | framing ok, porches ok / need electrical rough signed off / ok to drywall inside | JOND | JOND | | BFR | P | 4512015 |
ECHO CONSTRUCTION AND REMODELING INC. | BFR | R | 04/17/2013 | electrical rough needs signed off / fireblock garage brackets / strap gas line in garage / laterals missing at t23, t18, t17, t16, t15, t05-t10, / need lgt2 bracket on girders / 2-h2.5 at G02 / 3-2x6 under G10 / ok to insulate | JOND | JOND | | BFR | R | 4507791 |
ECHO CONSTRUCTION AND REMODELING INC. | BIN | P | 04/15/2013 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 4506461 |
ECHO CONSTRUCTION AND REMODELING INC. | BSP | R | 01/10/2013 | front porch foundation ok | JIMP | JIMP | | BSP | R | 4452392 |
ECHO CONSTRUCTION AND REMODELING INC. | BSP | P | 01/09/2013 | front footing OK for entry | JIMP | JIMP | | BSP | P | 4451412 |
ECHO CONSTRUCTION AND REMODELING INC. | BFI | C | 12/03/2012 | | JIMP | JIMP | | BFI | C | 4432811 |
ECHO CONSTRUCTION AND REMODELING INC. | BFD | C | 12/03/2012 | | JIMP | JIMP | | BFD | C | 4432810 |
ECHO CONSTRUCTION AND REMODELING INC. | BFN | C | 11/27/2012 | drain all but garages; isolate pads; float walls; 5% grade at final; eufer installed; approved foundation plans with submittial | JIMP | JIMP | | BFN | C | 4428765 |
ECHO CONSTRUCTION AND REMODELING INC. | BFT | C | 11/21/2012 | | JIMP | JIMP | | BFT | C | 4426697 |
MCCLELLAND ELECTRIC COMPANY | E= | C | 07/24/2013 | a/c ok 45 amp | CRAIG | CRAIG | | E= | C | 4570307 |
MCCLELLAND ELECTRIC COMPANY | E= | R | 07/22/2013 | bond down spout, missing receptacles counter top. breaker lock for oven unit . receptacles to low in garage. cap spare conductors in panel. | BRET | BRET | | E= | R | 4568919 |
MCCLELLAND ELECTRIC COMPANY | ER | C | 05/01/2013 | exterior soffitts | MIKEC | MIKEC | | ER | C | 4515909 |
MCCLELLAND ELECTRIC COMPANY | ER | C | 05/01/2013 | rest of rough | MIKEC | MIKEC | | ER | C | 4515882 |
MCCLELLAND ELECTRIC COMPANY | ER | P | 04/12/2013 | INSIDE | MIKEC | MIKEC | | ER | P | 4505130 |
MCCLELLAND ELECTRIC COMPANY | ER | R | 03/07/2013 | NOT READY | TIMA | TIMA | | ER | R | 4482951 |
MCCLELLAND ELECTRIC COMPANY | ES | C | 03/07/2013 | Residential Underground: 200 AMP 3/W NEW RES. | TIMA | TIMA | | ES | C | 4482950 |
A & Z MECHANICAL, INC. | H= | C | 07/18/2013 | All OK Notes: finished basement | JERRYF | JERRYF | | H= | C | 4566565 |
R AND D PLUMBING | HO+ | C | 05/22/2013 | 10# test ok. 2-outside fp, bbq. | MICHAELS | MICHAELS | | HO+ | C | 4528749 |
A & Z MECHANICAL, INC. | HV | C | 05/22/2013 | 2- outside fp vents and frame ok. | MICHAELS | MICHAELS | | HV | C | 4528748 |
R AND D PLUMBING | HO+ | P | 05/10/2013 | 10# test ok. 1" poly from meter to structure with tee and cap for bbq. Complete lines to appliances and re-call. OK to cover. | MICHAELS | MICHAELS | | HO+ | P | 4521602 |
A & Z MECHANICAL, INC. | HRR | C | 04/16/2013 | Correction made. | MICHAELS | MICHAELS | | HRR | C | 4506736 |
A & Z MECHANICAL, INC. | HRR | P | 04/15/2013 | Fireplace lacks insulation shield, Rest ok. | MICHAELS | MICHAELS | | HRR | P | 4506106 |
R AND D PLUMBING | HC | C | 04/10/2013 | RELEASE METER | MICHAELS | MICHAELS | | HC | C | 4503395 |
R AND D PLUMBING | HI | C | 04/10/2013 | 10# test ok. 2" main to boiler, fp, c-top, 2-garage heaters. | MICHAELS | MICHAELS | | HI | C | 4503394 |
A & Z MECHANICAL, INC. | HRR | P | 03/13/2013 | Unico system in attic for main level, need fp installed. Note: will need HRR+ for outside fireplaces. | MICHAELS | MICHAELS | | HRR | P | 4486496 |
R AND D PLUMBING | HWP | C | 01/08/2013 | 60# test ok. 4-zones in basement are only ones in house. | MICHAELS | MICHAELS | | HWP | C | 4450923 |
R AND D PLUMBING | P= | C | 07/18/2013 | HAS R.P BACK-FLOW FOR IRRIGATION | LEE | LEE | | P= | C | 4566900 |
R AND D PLUMBING | PTO | C | 03/21/2013 | CHECK STEAMER CLEARANCES ON FINAL | LEE | LEE | | PTO | C | 4491776 |
R AND D PLUMBING | PTO | R | 03/20/2013 | ALL LOCKED UP -- TRIP-FEE ?? | LEE | LEE | | PTO | R | 4490994 |
R AND D PLUMBING | PB | C | 12/06/2012 | | LEE | LEE | | PB | C | 4435702 |