PCL CONSTRUCTION SERVICES, INC | B= | C | 06/17/2013 | All other required Final inspections are complete. (This is a computer generated result) | BERTW | BERTW | | B= | C | 4544003 |
PCL CONSTRUCTION SERVICES, INC | B= | P | 06/11/2013 | Additional Inspections Required: External Agency Inspection Z= by ZONING is not Completed yet (Contact: kmagargal@springsgov.com or 385-5060), HEATING & PLUMBING ENGRS, INC Mechanical Final Inspection is not Completed yet. | BERTW | BERTW | | B= | P | 4540763 |
PCL CONSTRUCTION SERVICES, INC | BFR | C | 06/11/2013 | | BERTW | BERTW | | BFR | C | 4540745 |
CVK ELECTRIC, LLC | BSP | P | 05/03/2013 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical | SHELBY | SHELBY | | BSP | P | 4516685 |
PCL CONSTRUCTION SERVICES, INC | BSP | P | 01/25/2013 | corridor wall penetrations sealed ok/need roof penetrations inspected | BERTW | BERTW | | BSP | P | 4460719 |
PCL CONSTRUCTION SERVICES, INC | BFR | P | 01/25/2013 | ok pending other roughs completed | BERTW | BERTW | | BFR | P | 4460716 |
PCL CONSTRUCTION SERVICES, INC | BSP | R | 01/23/2013 | no call ahead number/ at 11:30 called kelly at corp office 303-365-6500, she said call nick 303-815-9991 for appt/ canceled inspection at 1:00 after never hearing back from nick | BLAKE | BLAKE | | BSP | R | 4459232 |
PCL CONSTRUCTION SERVICES, INC | BFR | P | 12/28/2012 | RTU curb framing ok/smoke barrier framing ok/infills ok/pending other rough inspections completed/will need fire caulking inspection at barrier walls and roof penetrations | BERTW | BERTW | | BFR | P | 4446381 |
CVK ELECTRIC, LLC | E= | C | 05/07/2013 | | BRET | BRET | | E= | C | 4519479 |
CVK ELECTRIC, LLC | E= | R | 03/01/2013 | Remove all temp wiring from within gear. Checked wiring from MDC to D3X1-------------- 1200 amp breaker missing GFCI protection. | JOSEPH | JOSEPH | | E= | R | 4480159 |
CVK ELECTRIC, LLC | E= | P | 02/14/2013 | outlets in UPS and IT room ok | JOSEPH | JOSEPH | | E= | P | 4471888 |
CVK ELECTRIC, LLC | EP | P | 02/13/2013 | ground ring at raised floor in UPS room; Both UPS units and Both buywaysl | JOSEPH | JOSEPH | | EP | P | 4471149 |
CVK ELECTRIC, LLC | ER | R | 02/12/2013 | inspected EL2N3 ED13 and 400 amp disconnect.-------------- Improper working clearance in front of 112.5kva transformer | JOSEPH | JOSEPH | | ER | R | 4470442 |
CVK ELECTRIC, LLC | ES | L | 02/11/2013 | No one on site | JOSEPH | JOSEPH | | ES | L | 4469977 |
CVK ELECTRIC, LLC | ER | L | 02/11/2013 | No one on site. | JOSEPH | JOSEPH | | ER | L | 4469975 |
CVK ELECTRIC, LLC | EP | P | 02/08/2013 | Inspected one line starting from ED1 to 600 amp breaker to ED9 to ATS (Neutral is switched) | JOSEPH | JOSEPH | | EP | P | 4469325 |
CVK ELECTRIC, LLC | ES | R | 02/06/2013 | Not enough time to inspect this equipment. Went over requirements with electrician. | JOSEPH | JOSEPH | | ES | R | 4467866 |
CVK ELECTRIC, LLC | ER | P | 02/06/2013 | Fire alarm inspection for IT room is complete. For electrical inspections POC is Chris Romo 659-5629 | JOSEPH | JOSEPH | | ER | P | 4467864 |
CVK ELECTRIC, LLC | ER | P | 01/24/2013 | above ceiling UPS room OK ---- informed contractor need fire alarm rough inspection | CRAIGS | CRAIGS | | ER | P | 4459949 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 06/17/2013 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 4544002 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 06/12/2013 | TEST AND BALANCE REPORT RECEIVED. REPORT SHOWS NITROGEN TESTS ON LIEBERT UNITS BUT DID NOT SEE ANY CFM READINGS. | NANCY | NANCY | | H= | P | 4541728 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 02/28/2013 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4478969 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 01/25/2013 | ABOVE CEILING OK. OK TO WRAP TRANSITIONS TO DIFFUSERS. | NANCY | NANCY | | H= | P | 4460786 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 01/22/2013 | RTU16: SUPPLY, RETURN AND OUTSIDE AIR ALL OK, OK TO WRAP. ANGLES ON FIRE DAMPERS THROUGH FLOOR ALL OK. BY FINAL LABEL ALL FIRE DAMPER ACCESS DOORS. | NANCY | NANCY | | HD | P | 4457537 |
HEATING & PLUMBING ENGINEERS, INC | HRP | C | 01/10/2013 | SIX 350 LB TESTS OK. OK TO INSULATE LINES. | NANCY | NANCY | | HRP | C | 4452267 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 01/10/2013 | CHANGE SCOPE OF WORK TO SHOW ACCURATE DESCRIPTION, I.E. 2 LIEBERTS WITH CONDENSERS, 1 AIR HANDLER, DUCTS, ETC. ROUGH DUCTS ABOVE CEILING OK, OK TO WRAP. PROVIDE FIRE DAMPER INSTALLATION INSTRUCTIONS FOR NEXT INSPECTION. CONDENSATE DRAIN ABOVE CEILING OK, OK TO INSULATE. | NANCY | NANCY | | HD | P | 4452263 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 02/06/2013 | | LYNNIE | LYNNIE | | P= | C | 4467346 |
HEATING & PLUMBING ENGINEERS, INC | PTO | C | 12/21/2012 | | JOEL | JOEL | | PTO | C | 4444231 |
HEATING & PLUMBING ENGINEERS, INC | PTO | R | 12/18/2012 | NOT READY | JOEL | JOEL | | PTO | R | 4441958 |