SADDLETREE INC. | B= | C | 04/30/2013 | finished basement | JOND | JOND | | B= | C | 4514531 |
SADDLETREE INC. | BSP | T | 04/10/2013 | PAID (REC#1122635): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice to add o.s.a. | DALEH | DALEH | | BSP | T | 4503722 |
SADDLETREE INC. | BLA | C | 02/19/2013 | | JIMP | JIMP | | BLA | C | 4474350 |
SADDLETREE INC. | BFR | C | 02/11/2013 | | JIMP | JIMP | | BFR | C | 4470009 |
SADDLETREE INC. | BIN | P | 02/11/2013 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | JIMP | JIMP | | BIN | P | 4469712 |
SADDLETREE INC. | BFT | C | 12/07/2012 | engineers observation on file | JIMP | JIMP | | BFT | C | 4436628 |
SADDLETREE INC. | BFN | C | 12/07/2012 | engineers observation on file | JIMP | JIMP | | BFN | C | 4436627 |
SADDLETREE INC. | BFD | C | 12/07/2012 | eufer ground installed; isolate pads; float walls; 10% grade at final; drain habitable space | JIMP | JIMP | | BFD | C | 4436625 |
SADDLETREE INC. | BFN | P | 11/28/2012 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFN | P | 4429229 |
SADDLETREE INC. | BFT | P | 11/28/2012 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFT | P | 4429228 |
D & J QUALITY ELECTRIC INC | E= | C | 04/10/2013 | | MIKEC | MIKEC | | E= | C | 4503536 |
D & J QUALITY ELECTRIC INC | E= | R | 04/09/2013 | rev. polarity garage gfi | MIKEC | MIKEC | | E= | R | 4502588 |
D & J QUALITY ELECTRIC INC | ES | C | 02/08/2013 | Residential Underground: 200 AMP 3/W NEW RES. | TIMA | TIMA | | ES | C | 4469384 |
D & J QUALITY ELECTRIC INC | ER | C | 02/08/2013 | NO MULTI WIRE #6AL----FINISHED BASEMENT---- | TIMA | TIMA | | ER | C | 4469362 |
OLYMPIA HEATING & COOLING INC. | H= | C | 04/11/2013 | Duct leakage report received. Note: mantel clearance ok, full a/c on main, a/c rough(coil and lineset) in attic. | MICHAELS | MICHAELS | | H= | C | 4504395 |
OLYMPIA HEATING & COOLING INC. | HC | C | 02/11/2013 | RELEASE METER | MICHAELS | MICHAELS | | HC | C | 4469802 |
OLYMPIA HEATING & COOLING INC. | HRR | C | 02/11/2013 | Corrections made. AT FINAL: check attic equipment, need leakage report, add osa to duct design. | MICHAELS | MICHAELS | | HRR | C | 4469801 |
OLYMPIA HEATING & COOLING INC. | HRR | P | 02/07/2013 | PROVIDE ATTIC SYSTEM LEAKAGE TEST AT FINAL. NEED TO VERIFY ATTIC EQUIPMENT SIZING AT FINAL, I DID NOT HAVE A LADDER AT ROUGH. REPLACE BROKEN 4 INCH RUN IN BASEMENT. REATTACH 6 INCH SUPPLY BOOT IN BASEMENT CEILING. TIGHTEN STRAP ON BASEMENT BEDROOM 6 INCH SUPPLY RUN. OUTSIDE AIR INSTALLED TO BASEMENT RETURN, DID NOT SEE OUTSIDE AIR ON DUCT DESIGN. NOTE: FINISHED BASEMENT. OUTSIDE AIR TIED TO BASEMENT FURNACE RETURN. A/C ROUGH, COIL AND LINESET ON BOTH FURNACES. BASEMENT FURNACE IS DIRECT VENT. | NANCY | NANCY | | HRR | P | 4468778 |
KAMPP-L ENTERPRISES, INC. | HI | C | 02/01/2013 | 10# test ok. 1 1/4" main to furn, w/h, range, bbq, attic furnace, fp, future fp in bsmt. | MICHAELS | MICHAELS | | HI | C | 4465456 |
KAMPP-L ENTERPRISES, INC. | P= | C | 04/11/2013 | HAS PVB | LEE | LEE | | P= | C | 4504554 |
KAMPP-L ENTERPRISES, INC. | PTO | C | 02/05/2013 | | LEE | LEE | | PTO | C | 4467117 |
KAMPP-L ENTERPRISES, INC. | PTO | P | 02/04/2013 | BAR SINK ON OUTSIDE WALL NOT VENTED ? NO STRUCTURAL CONDITIONS, REST OK | LEE | LEE | | PTO | P | 4466441 |
KAMPP-L ENTERPRISES, INC. | PTO | R | 02/01/2013 | TRIP-FEE ?? ALL LOCKED UP @ 3:30 | LEE | LEE | | PTO | R | 4465634 |