GOEBEL CONSTRUCTION, INC | B= | C | 07/19/2013 | All other required Final inspections are complete. (This is a computer generated result) | JOND | JOND | | B= | C | 4567892 |
GOEBEL CONSTRUCTION, INC | B= | P | 06/21/2013 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | JOND | JOND | | B= | P | 4548079 |
GOEBEL CONSTRUCTION, INC | B= | R | 06/17/2013 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: enijkamp@springsgov.com or 385-5977). seal pipe in garage ceiling / need plumbing final signed off / need window well cover on well by deck stair landing / pipe sump pipe away from house / finished basement | JOND | JOND | | B= | R | 4544357 |
GOEBEL CONSTRUCTION, INC | BLA | C | 04/08/2013 | | JOND | JOND | | BLA | C | 4501911 |
GOEBEL CONSTRUCTION, INC | BFR | C | 04/01/2013 | | JOND | JOND | | BFR | C | 4497430 |
GOEBEL CONSTRUCTION, INC | BIN | C | 04/01/2013 | | JOND | JOND | | BIN | C | 4497429 |
GOEBEL CONSTRUCTION, INC | BLA | R | 04/01/2013 | need to fix paper and wire at back deck ledger | JOND | JOND | | BLA | R | 4497428 |
GOEBEL CONSTRUCTION, INC | BIN | R | 03/27/2013 | not done in basement / need es report on sprayed foam in attic / need frame signed off | JOND | JOND | | BIN | R | 4494676 |
GOEBEL CONSTRUCTION, INC | BFR | R | 03/27/2013 | upper frame calls for parralam post under beam at front room | JOND | JOND | | BFR | R | 4494675 |
GOEBEL CONSTRUCTION, INC | BFR | R | 03/25/2013 | plans show paralam posts under ml beam at front east room / need more bearing at stair stringers going down to basement / ok to insulate | JOND | JOND | | BFR | R | 4493038 |
GOEBEL CONSTRUCTION, INC | BSP | P | 03/05/2013 | rear piers and soffit OK | JIMP | JIMP | | BSP | P | 4482025 |
GOEBEL CONSTRUCTION, INC | BSP | P | 02/22/2013 | OK to foam roof | JIMP | JIMP | | BSP | P | 4475559 |
GOEBEL CONSTRUCTION, INC | BSP | T | 02/07/2013 | PAID (REC#1111259) ADDITIONAL PLAN REVIEW TIME: $55 From: TCRIPPEN new splice pages | TCRIPPEN | TCRIPPEN | | BSP | T | 4468667 |
GOEBEL CONSTRUCTION, INC | BFD | C | 01/15/2013 | | JIMP | JIMP | | BFD | C | 4454357 |
GOEBEL CONSTRUCTION, INC | BFN | C | 01/09/2013 | need typed open hole at drain; eufer OK | JIMP | JIMP | | BFN | C | 4451639 |
GOEBEL CONSTRUCTION, INC | BFT | C | 01/07/2013 | | JIMP | JIMP | | BFT | C | 4449972 |
SANCHEZ ELECTRIC, INC. | E= | C | 06/12/2013 | | MIKEC | MIKEC | | E= | C | 4542203 |
SANCHEZ ELECTRIC, INC. | E= | T | 06/10/2013 | PAID (REC#1134775): CORRECTION NOT MADE | MIKEC | MIKEC | | E= | T | 4540035 |
SANCHEZ ELECTRIC, INC. | E= | R | 06/07/2013 | KITCHEN GFI WON'T RESET | MIKEC | MIKEC | | E= | R | 4538690 |
SANCHEZ ELECTRIC, INC. | ER | C | 03/22/2013 | check sub panel on final | MIKEC | MIKEC | | ER | C | 4492354 |
SANCHEZ ELECTRIC, INC. | ES | C | 03/21/2013 | Residential Underground: new 200 amp service | MIKEC | MIKEC | | ES | C | 4491522 |
SANCHEZ ELECTRIC, INC. | ER | R | 03/21/2013 | no feeder wire to sub panel | MIKEC | MIKEC | | ER | R | 4491518 |
MICK HEATING & SHEET METAL CO. | H= | C | 06/14/2013 | Mantel is non-combustible. | MICHAELS | MICHAELS | | H= | C | 4543493 |
MICK HEATING & SHEET METAL CO. | H= | P | 06/10/2013 | FIREPLACE NOT COMPLETE, MANTLE BEING INSTALLED? NOTE: FINISHED BASEMENT. GEOTHERMAL HEAT, ELECTRIC WATER HEATERS. | NANCY | NANCY | | H= | P | 4540316 |
MICK HEATING & SHEET METAL CO. | H= | L | 06/05/2013 | No access, house locked at 12:20. | MICHAELS | MICHAELS | | H= | L | 4537074 |
MICK HEATING & SHEET METAL CO. | HC | C | 03/22/2013 | RELEASE METER | MICHAELS | MICHAELS | | HC | C | 4492475 |
MICK HEATING & SHEET METAL CO. | HRR | C | 03/22/2013 | Duct design ok. Entire system is geothermal. Note: FB, attic is conditioned. AT FINAL: check R/A in bsmt hallway and condensate to upstairs washer box. | MICHAELS | MICHAELS | | HRR | C | 4492470 |
DAVIS GAS SHOP INC | HI | C | 03/19/2013 | Slab heat will be Geothermal. AT FINAL: check furnace connection and 2lb. letter from CSPU. | MICHAELS | MICHAELS | | HI | C | 4490176 |
DAVIS GAS SHOP INC | HI | P | 03/15/2013 | 10# test ok. 3/4" csst main to fp, c-top, furn, What is heating slab? BY FINAL: need 2lb. letter from CSPU. | MICHAELS | MICHAELS | | HI | P | 4488267 |
T & N DESIGN LLC | HWP | P | 01/23/2013 | 60# test ok. 3-zones in basement ok. | MICHAELS | MICHAELS | | HWP | P | 4458791 |
MD SERVICE PLUMBING, INC. | P= | C | 06/17/2013 | PVB INSTALLED | JOEL | JOEL | | P= | C | 4544184 |
MD SERVICE PLUMBING, INC. | P= | P | 06/13/2013 | install sprinkler backflow, note: finished basement | TED | TED | | P= | P | 4542429 |
MD SERVICE PLUMBING, INC. | PTO | C | 03/13/2013 | | MARTY | MARTY | | PTO | C | 4486593 |
MD SERVICE PLUMBING, INC. | PB | C | 01/18/2013 | | LEE | LEE | | PB | C | 4457281 |