SWINERTON BUILDERS | B= | C | 10/21/2013 | All other required Final inspections are complete. (This is a computer generated result) | DANF | DANF | | B= | C | 4626503 |
SWINERTON BUILDERS | B= | P | 10/03/2013 | Additional Inspections Required: HEATING & PLUMBING ENGRS, INC Mechanical Final Inspection is not Completed yet. | DANF | DANF | | B= | P | 4615701 |
SWINERTON BUILDERS | BSP | P | 09/16/2013 | above grid penetrations and wall type lables ok | CHRISM | CHRISM | | BSP | P | 4605311 |
SWINERTON BUILDERS | BSP | R | 09/13/2013 | cancelled in the field by contractor | ED | ED | | BSP | R | 4604010 |
SWINERTON BUILDERS | BFT | R | 05/16/2013 | what is inspection for? / no call ahead # to meet, secured building | DALE | DALE | | BFT | R | 4525434 |
SWINERTON BUILDERS | BFR | P | 04/10/2013 | 2K at damper ok / above ceiling ok at hall | DALE | DALE | | BFR | P | 4503750 |
SWINERTON BUILDERS | BFR | R | 04/09/2013 | canceled by contractor | DALE | DALE | | BFR | R | 4502801 |
SWINERTON BUILDERS | BFR | P | 04/08/2013 | will need 2K at damper | DALE | DALE | | BFR | P | 4502280 |
SWINERTON BUILDERS | BFR | P | 02/01/2013 | walls 1st floor ok | DALE | DALE | | BFR | P | 4465620 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 10/02/2013 | FIRE ALARM INSPECTION: no card on site to sign off | BRIAN | BRIAN | | E= | C | 4615268 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 10/02/2013 | | BRIAN | BRIAN | | E= | C | 4615233 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/23/2013 | FIRE ALARM INSPECTION: cieling phase 7 FIRE ALARM | BRIAN | BRIAN | | ER | P | 4591874 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/23/2013 | ceiling ok -- rest of phase 7 | BRIAN | BRIAN | | ER | P | 4591863 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/06/2013 | complete except for phase 7 | GARYL | GARYL | | ER | P | 4579641 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | C | 08/06/2013 | FIRE ALARM INSPECTION: | GARYL | GARYL | | ER | C | 4579639 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 06/06/2013 | UPS rms A and B penthouse 8-vfd's 2- chillers | CRAIG | CRAIG | | ER | P | 4537915 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 04/23/2013 | FIRE ALARM INSPECTION: MDF room under floor and above ceiling and hall way 105 for fire alarm in conduit and flex | CRAIG | CRAIG | | ER | P | 4510419 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 04/10/2013 | FIRE ALARM INSPECTION: marked and dated on plans | CRAIG | CRAIG | | ER | P | 4503425 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 04/10/2013 | marked and dated on plans | CRAIG | CRAIG | | ER | P | 4503424 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/28/2013 | marked and dated on prints | GARYL | GARYL | | ER | P | 4462297 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 10/21/2013 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 4626502 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 09/06/2013 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4600213 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 09/06/2013 | UV PROTECT FLEX CONNECTORS ON ROOF. UPS A: REMOVE SCREWS FROM DOUBLE SIDED DAMPER ANGLES. WOMEN'S BATHROOM: INSTALL SCREWS INTO WALL ON SINGLE SIDED DAMPER ANGLES. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4599714 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 09/04/2013 | PIPING PORTION OF MECHANICAL PERMIT ALL COMPLETE PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4598355 |
HEATING & PLUMBING ENGINEERS, INC | HD | C | 08/26/2013 | IT WORKSHOP: ALL COMPLETE. OK TO START CALLING FINAL INSPECTIONS. | NANCY | NANCY | | HD | C | 4592517 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 08/23/2013 | CANCELED FOR TODAY. ALREADY RESCHEDULED FOR MONDAY. | NANCY | NANCY | | HD | P | 4591238 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 07/09/2013 | REMAINDER TIE-IN OF PROCESS PIPING OK FOR PENTHOUSE A, CHECK INSULATION AND LABELING | ROBERTV | ROBERTV | | HWP | P | 4559584 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 05/30/2013 | SEE SHEET M2.03 FOR DATE AND SIGNATURE. 100 LB TEST OK ON COMPLETE GLYCOL SYSTEM, OK TO INSULATE. 100 LB TEST OK ON COMPLETE EXPANSION SYSTEM. OK TO INSULATE. SEE SHEET M1.04 FOR DATE AND SIGNATURE. FOUR NEW PUMPS AND PIPING TO EXISTING VALVES OK. | NANCY | NANCY | | HWP | P | 4533404 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 05/21/2013 | SEE SHEET M2.03 FOR DATE AND SIGNATURE. THREE 100 LB TESTS OK ON HEAT EXCHANGERS 1, 2 AND 3, HEAT EXCHANGER 1 TEST WAS ON COMPLETE OUTLET SIDE. HEAT EXCHANGERS 2 AND 3 TEST WAS ON COMPLETE INLET SIDE AND OUTLET SIDE TO FUTURE POINTS OF CONNECTION, | NANCY | NANCY | | HWP | P | 4527817 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 05/16/2013 | SEE SHEET M2.12 FOR DATE AND SIGNATURE. CHILLED WATER SUPPLY/RETURN IN UPS A, UPS B, IT WORKSHOP, EMERGENCY POWER AND MDF ROOM OK, OK TO COMPLETE INSULATION. ALL FAN COIL UNITS, ALL FLOORS: CHILLED WATER SUPPLY/RETURN TO ALL UNITS OK. OK TO COMPLETE INSULATION. SEE SHEET M4.02 FOR DATE AND SIGNATURE. CONDENSATE DRAINS FOR UPS A, UPS B, IT WORKSHOP, EMERGENCY POWER AND MDF ROOM OK, OK TO COMPLETE INSULATION. | NANCY | NANCY | | HWP | P | 4525225 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/24/2013 | SEE SHEET M2.12 FOR DATE AND SIGNATURE. IT WORKSHOP: FRAMING FOR TWO FIRE DAMPERS OK, OK TO COVER. MDF ROOM: FRAMING FOR FIRE/SMOKE DAMPER (TRANSFER AIR INTO HALLWAY) OK, OK TO COVER. | NANCY | NANCY | | HD | P | 4511249 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 04/11/2013 | FOUR 50 LB TESTS OK ON ALL CONCEALED CONDENSATE DRAINS. OK TO INSULATE ALL. | NANCY | NANCY | | HWP | P | 4504178 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/11/2013 | HAVE INSTALLATION INSTRUCTIONS FOR ONE SIDED DAMPER ANGLES ON SITE AT NEXT INSPECTION. SEE SHEET M3.02 FOR DATE AND SIGNATURE. A CORE SOUTH: EXHAUST IN SHAFT OK. SEE SHEET M3.01 FOR DATE AND SIGNATURE. A CORE NORTH: MAKE-UP AIR IN SHAFT OK, OK TO WRAP. LOW PRESSURE DUCT IN CEILING OK, OK TO WRAP. SEE SHEET M3.04 FOR DATE AND SIGNATURE. LOW PRESSURE DUCT OK TO WRAP. SEE SHEET M2.12 FOR DATE AND SIGNATURE. RETURN AIR FIRE DAMPER OK, OK TO INSTALL ANGLES. | NANCY | NANCY | | HD | P | 4504177 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/05/2013 | CHECK YOUR INSTALLATION INSTRUCTIONS FOR ONE SIDED DAMPER ANGLES, PROBABLY NEED #10 SCREWS INSTALLED INTO WALL ON ALL FOUR SIDES. PROVIDE INSTRUCTIONS AT NEXT INSPECTION. SEE SHEET M2.12 FOR DATE AND SIGNATURE. TWO FIRE DAMPERS ABOVE LOCKER ROOMS INTO SHAFT OK, OK TO CLOSE SHAFT PER MECHANICAL ONLY. OK TO INSTALL ANGLES ON DAMPERS. SEE SHEETS M3.01 AND M3.06 FOR DATE AND SIGNATURE. FIRST AND SECOND FLOOR, OK TO WRAP. | NANCY | NANCY | | HD | P | 4500956 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 04/01/2013 | TWO 100 LB TESTS OK, SEE INSPECTION TEST REPORTS DATED 3/28/13 AND 3/29/13. SEE SHEETS M2.09, M2.10, M2.12, M3.01, M3.03, M3.04, M3.05, M3.06 AND M5.01 FOR DATE AND SIGNATURE. CHILLED WATER SUPPLY AND RETURN ALL OK TO INSULATE. BY FINAL NEED REVISED/APPROVED PRINTS SHOWING NEW PIPING LOCATIONS. | NANCY | NANCY | | HWP | P | 4497530 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/01/2013 | SEE SHEET M2.12 FOR DATE AND SIGNATURE. FRAMING FOR TWO FIRE DAMPERS OK, OK TO INSTALL DAMPERS. INSTALL WIDER ANGLES AS NEEDED. QUESTION REGARDING FRAMING OF DAMPER FOR LARGE RETURN AIR IN HALLWAY. CHECKING ON SHAFT WALL INSTALLATION. | NANCY | NANCY | | HD | P | 4497529 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 03/26/2013 | SEE SHEET M2.12 FOR DATE AND SIGNATURE. WOMEN'S LOCKER ROOM: FIRE/SMOKE DAMPER FRAMING OK, OK TO COVER. SEE SHEETS M3.01, M3.04 AND M3.06 FOR DATE AND SIGNATURE. FIRE DAMPER FRAMING OK, OK FOR DAMPERS AND ANGLES. OK TO WRAP DUCTS. | NANCY | NANCY | | HD | P | 4493705 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 03/15/2013 | SEE SHEET M2.12 FOR DATE AND SIGNATURE. EMERGENCY SWITCH GEAR ROOM: REMOVE SHEET ROCK AROUND FRAMING. STILL NEED LETTER FROM ENGINEER STATING TYPE OF DAMPER TO BE INSTALLED AND INSTALLATION INSTRUCTIONS. TWO OTHER FRAMES OK SEE SHEETS M3.01 AND M3.03 FOR DATE AND SIGNATURE. FRAMING FOR SUPPLY AND TRANSFER AIR FIRE DAMPERS OK. OK TO INSTALL DAMPER AND ANGLES. | NANCY | NANCY | | HD | P | 4488561 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 03/14/2013 | SEE SHEET M3.03 FOR DATE AND SIGNATURE. SUPPLY/RETURN AIR OPENINGS IN BLOCK WALL OK, OK TO INSTALL DAMPERS/SLEEVES. SEE SHEET M3.06 FOR DATE AND SIGNATURE. FRAMING FOR SUPPLY AIR FIRE DAMPER OK, OK TO INSTALL DAMPER AND ANGLES. | NANCY | NANCY | | HD | P | 4487733 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 03/08/2013 | SEE SHEET M7.02 FOR DATE AND SIGNATURE. B PENTHOUSE COOLING TOWERS: TOWERS AND ASSOCIATED PIPING ALL OK. OK TO COMPLETE INSULATION. STILL NEED TO COMPLETE SUPPORTS. | NANCY | NANCY | | HWP | P | 4484207 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 03/08/2013 | SEE SHEETS M3.01, M3.04 AND M3.06 FOR DATE AND SIGNATURE. THIRD AND FOURTH FLOORS: SUPPLY AIR AND TRANSFER AIR FIRE DAMPER OPENINGS OK EXCEPT STILL NEED TO SEE FRAMING FOR TRANSFER AIR FIRE DAMPER FOR C CORE ROOM, OK TO INSTALL DAMPERS AND ANGLES. SEE SHEET M2.12 FOR DATE AND SIGNATURE. SUPPLY DUCTS OK, OK TO WRAP. EXHAUST DUCT OK. QUESTION REGARDING RATING OF HALLWAY WALL. DID NOT SEE FRAMING FOR TWO FIRE DAMPERS. | NANCY | NANCY | | HD | P | 4484204 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 02/22/2013 | SEE SHEET M2.12 FOR DATE AND SIGNATURE. EMERGENCY SWITCH GEAR ROOM: PROVIDE ENGINEERS LETTER APPROVING MOVING TRANSFER AIR FIRE DAMPER AT WALL TO CEILING RADIATION DAMPER AT CEILING, ALSO NEED ENGINEER TO PROVIDE APPROVAL OF FRAMING AND INSTALLATION OF CEILING RADIATION DAMPER. HALLWAY: OK TO WRAP MEDIUM PRESSURE SUPPLY DUCT HIGHLIGHTED ON PRINT. | NANCY | NANCY | | HD | P | 4475678 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 02/06/2013 | SEE SHEET M2.12 FOR DATE AND SIGNATURE. FRAMING FOR TWO FIRE/SMOKE DAMPERS IN IT WORKSHOP WALLS OK, OK TO COVER. FRAMING FOR ONE FIRE DAMPER IN SWITCH GEAR ROOM WALL OK, OK TO COVER. PROVIDE INSTALLATION INSTRUCTIONS FOR INSTALLING FIRE DAMPER IN METAL STUD FRAMED CEILING, INSTRUCTIONS I HAVE ONLY LIST HORIZONTAL INSTALLATION THROUGH CONCRETE FLOOR. | NANCY | NANCY | | HD | P | 4467491 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 02/01/2013 | PROPERLY FRAME THREE FIRE/SMOKE DAMPERS IN IT WORK SHOP. | NANCY | NANCY | | HD | P | 4465268 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 08/07/2013 | | LEE | LEE | | P= | C | 4580003 |
HEATING & PLUMBING ENGINEERS, INC | PBP | C | 08/07/2013 | RPBP FOR CHILLED WATER OK | LEE | LEE | | PBP | C | 4579998 |
HEATING & PLUMBING ENGINEERS, INC | PBP | P | 06/13/2013 | Back flow RP for penthouse A OK | JACK | JACK | | PBP | P | 4542629 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/21/2013 | RE-ROUTED TWO DOMESTIC WATER LINES AND FLOOR SINK VENT -- LOOKED AT SUPPLY TO STEAM GENERATOR (NEED TO INSTALL BACK-FLOW) -- REROUTED TRAP PRIMER SUPPLY | LEE | LEE | | PTO | P | 4527626 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 01/14/2013 | FOR ONE FLOOR SINK / TRAP PRIMER | LEE | LEE | | PB | P | 4453759 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 01/04/2013 | ELIMINATED TWO SHOWER DRAINS | LEE | LEE | | PB | P | 4448706 |