BRYAN CONSTRUCTION, INC. | B= | C | 07/01/2014 | | BERTW | BERTW | | B= | C | 4768808 | RK MECHANICAL, LLC | BSP | T | 05/30/2014 | PAID (REC#1197937) PLAN SPLICE FEE: $50 by: DALEH for Mechanical | DALEH | DALEH | | BSP | T | 4748633 | BRYAN CONSTRUCTION, INC. | B= | P | 03/27/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: dtortorice@springsgov.com or 385-5099), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, GREINER ELECTRIC, LLC Electrical Final Inspection is not Completed yet, RK MECHANICAL, INC Mechanical Final Inspection is not Completed yet. 1)exit signs west exit 2)accessible restroom signs and undersink knee protection 3)4" max openings at interior ramp bottom rail to cap 4)smoke seals 2hr firewall doors both levels 5)elevator equip rooms and shafts need firecaulking inspections -- Schedule a new Building Final when above items are complete. | BERTW | BERTW | | B= | P | 4709790 | BRYAN CONSTRUCTION, INC. | BLA | C | 02/03/2014 | | BERTW | BERTW | | BLA | C | 4681899 | BRYAN CONSTRUCTION, INC. | BBB | C | 02/03/2014 | observation letter on file | BERTW | BERTW | | BBB | C | 4681897 | BRYAN CONSTRUCTION, INC. | BFR | C | 02/03/2014 | Structural steel connection observation letter on file | BERTW | BERTW | | BFR | C | 4681896 | BRYAN CONSTRUCTION, INC. | BIN | C | 01/03/2014 | | BERTW | BERTW | | BIN | C | 4666260 | BRYAN CONSTRUCTION, INC. | BLA | P | 12/20/2013 | upper sections ok | BERTW | BERTW | | BLA | P | 4660937 | BRYAN CONSTRUCTION, INC. | BFI | C | 12/13/2013 | | BERTW | BERTW | | BFI | C | 4656424 | BRYAN CONSTRUCTION, INC. | BFR | P | 12/06/2013 | ok pending elevator equip room inspection and other roughs completed | BERTW | BERTW | | BFR | P | 4653351 | BRYAN CONSTRUCTION, INC. | BLA | P | 12/06/2013 | | BERTW | BERTW | | BLA | P | 4653346 | BRYAN CONSTRUCTION, INC. | BLA | P | 11/18/2013 | east and south upper sections ok | BERTW | BERTW | | BLA | P | 4643270 | BRYAN CONSTRUCTION, INC. | BSP | P | 11/08/2013 | plumbing pipes through 1hr fire barriers at pool equip room need firestopping inspection | BERTW | BERTW | | BSP | P | 4638231 | BRYAN CONSTRUCTION, INC. | BLA | P | 10/30/2013 | parapet ok upper roof section | BERTW | BERTW | | BLA | P | 4632046 | BRYAN CONSTRUCTION, INC. | BIN | P | 10/25/2013 | pool mech room insulation ok | BERTW | BERTW | | BIN | P | 4629511 | BRYAN CONSTRUCTION, INC. | BSP | P | 10/25/2013 | training with Bert | BOBF | BOBF | | BSP | P | 4629475 | BRYAN CONSTRUCTION, INC. | BFR | P | 10/23/2013 | 1hr rated section ok west wall | BERTW | BERTW | | BFR | P | 4627713 | BRYAN CONSTRUCTION, INC. | BIN | P | 10/23/2013 | 1hr rated section ok west wall | BERTW | BERTW | | BIN | P | 4627704 | BRYAN CONSTRUCTION, INC. | BFR | P | 10/11/2013 | south and west walls and south stair tower ok pending other roughs completed | BERTW | BERTW | | BFR | P | 4621475 | BRYAN CONSTRUCTION, INC. | BIN | P | 10/11/2013 | south and west walls rigid ok | BERTW | BERTW | | BIN | P | 4621473 | BRYAN CONSTRUCTION, INC. | BFR | P | 09/26/2013 | ok to use 2 screws in clips addressing previous comments | BERTW | BERTW | | BFR | P | 4611605 | BRYAN CONSTRUCTION, INC. | BIN | P | 09/26/2013 | east exterior rigid ok/west underslab ok | BERTW | BERTW | | BIN | P | 4611545 | BRYAN CONSTRUCTION, INC. | BFR | P | 09/09/2013 | BB line lower roof exterior ok/pool mech room ok pending revision for ductwork penetrating 1hr infill framing at precast panels/east exterior framing pending 4 screws in BC800 bridging clips to stud face per plans where only 2 are installed (all) | BERTW | BERTW | | BFR | P | 4600780 | BRYAN CONSTRUCTION, INC. | BSP | P | 08/21/2013 | letter on file to revise 2hr expansion joint to non-rated | BERTW | BERTW | | BSP | P | 4589906 | BRYAN CONSTRUCTION, INC. | BFN | C | 08/06/2013 | open hole report on file | BERTW | BERTW | | BFN | C | 4579131 | BRYAN CONSTRUCTION, INC. | BFI | C | 08/06/2013 | | BERTW | BERTW | | BFI | C | 4579130 | BRYAN CONSTRUCTION, INC. | BFR | P | 08/06/2013 | hydro pool platform ok | BERTW | BERTW | | BFR | P | 4579129 | RK MECHANICAL, LLC | BSP | T | 08/01/2013 | PAID (REC#1146358) PLAN SPLICE FEE: $125 by: RUSSELL for Mechanical: Revised or added 27 pages for splice | RUSSELL | RUSSELL | | BSP | T | 4576327 | BRYAN CONSTRUCTION, INC. | BSP | T | 07/25/2013 | PAID (REC#1146356) ADDITIONAL PLAN REVIEW TIME: $75 From: TCRIPPEN new splice pages see clouds | TCRIPPEN | TCRIPPEN | | BSP | T | 4571649 | BRYAN CONSTRUCTION, INC. | BFR | P | 07/19/2013 | reviewed with job super Steve the documents needed to complete footing and foundation inspections | BERTW | BERTW | | BFR | P | 4567768 | BRYAN CONSTRUCTION, INC. | BFI | P | 07/02/2013 | under slab ok AA-AB-0.7-5.4 | BERTW | BERTW | | BFI | P | 4555485 | BRYAN CONSTRUCTION, INC. | BBB | P | 06/19/2013 | ok for CTL to do inspections/observation letter to follow | BERTW | BERTW | | BBB | P | 4545864 | BRYAN CONSTRUCTION, INC. | BFD | C | 06/19/2013 | south ok | BERTW | BERTW | | BFD | C | 4545862 | BRYAN CONSTRUCTION, INC. | BFR | R | 06/14/2013 | no inspection done, according to contractor inspection called in by mistake | BLAKE | BLAKE | | BFR | R | 4543341 | BRYAN CONSTRUCTION, INC. | BIN | P | 06/14/2013 | not a bin but a bfi- "1.1 and 0.7, gride line GG to A" | BLAKE | BLAKE | | BIN | P | 4543338 | BRYAN CONSTRUCTION, INC. | BFT | C | 06/05/2013 | pad at 3.4 AB line ok | BERTW | BERTW | | BFT | C | 4536753 | BRYAN CONSTRUCTION, INC. | BSP | T | 05/28/2013 | PAID (REC#1135523) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: pool pit details | SHELLEY | SHELLEY | | BSP | T | 4531308 | BRYAN CONSTRUCTION, INC. | BFI | P | 05/28/2013 | vertical ok but not required on com check-inspections are needed for horizontal only when ready | BERTW | BERTW | | BFI | P | 4531116 | BRYAN CONSTRUCTION, INC. | BFR | P | 05/23/2013 | walls completed ok | BERTW | BERTW | | BFR | P | 4529329 | BRYAN CONSTRUCTION, INC. | BSP | P | 05/22/2013 | pad @ CC 4.7 line ok/reviewed open hole reports and drain requirements with Ben contractor rep | BERTW | BERTW | | BSP | P | 4528447 | BRYAN CONSTRUCTION, INC. | BFT | P | 05/22/2013 | this completes exterior wall footings | BERTW | BERTW | | BFT | P | 4528445 | BRYAN CONSTRUCTION, INC. | BFN | P | 05/20/2013 | completes wall inspections for AA-BB line 5.4 thru .05 | BERTW | BERTW | | BFN | P | 4526615 | BRYAN CONSTRUCTION, INC. | BFT | P | 05/20/2013 | need pilaster reinforcing details | BERTW | BERTW | | BFT | P | 4526607 | BRYAN CONSTRUCTION, INC. | BFN | P | 05/15/2013 | elevator walls ok/walls @ BB line 1.5 thru 3.4/2 pilasters AA-BB line @ 4.7 pending stamped detail ok | BERTW | BERTW | | BFN | P | 4524026 | BRYAN CONSTRUCTION, INC. | BFT | P | 05/15/2013 | need details with designer stamp for all pilasters at steps in elevation not on plans | BERTW | BERTW | | BFT | P | 4524023 | BRYAN CONSTRUCTION, INC. | BFN | P | 05/10/2013 | 1-5.4 AA thru BB line ok | BERTW | BERTW | | BFN | P | 4521224 | BRYAN CONSTRUCTION, INC. | BFN | P | 05/06/2013 | GG line .05 thru 5.4/DD thru GG line 4.7 -5.4 | BERTW | BERTW | | BFN | P | 4517670 | BRYAN CONSTRUCTION, INC. | BFN | P | 05/02/2013 | BB thru GG,1.6 to 1.1 line ok | BERTW | BERTW | | BFN | P | 4516199 | BRYAN CONSTRUCTION, INC. | BFN | P | 05/01/2013 | reviewed plans for 2hr firewall construction | BERTW | BERTW | | BFN | P | 4515312 | BRYAN CONSTRUCTION, INC. | BFT | P | 05/01/2013 | will need observation letter for push piers being installed to stabilize columns @ support pads in building 2B | BERTW | BERTW | | BFT | P | 4515304 | BRYAN CONSTRUCTION, INC. | BFN | P | 04/30/2013 | B thru GG on 0.7 line ok/reviewed ufer inspections required by RBD with Ben contractor rep for foundations | BERTW | BERTW | | BFN | P | 4514375 | BRYAN CONSTRUCTION, INC. | BFT | P | 04/24/2013 | B-GG line 1 thru0.5/GG line .05 thru 5.4/GG-DD line 5,4 thru 4.7 ok | BERTW | BERTW | | BFT | P | 4511143 | BRYAN CONSTRUCTION, INC. | BFT | P | 04/23/2013 | Steve cell # 492-2587/reviewed pour schedules with foundation contractor | BERTW | BERTW | | BFT | P | 4510516 | BRYAN CONSTRUCTION, INC. | BFT | P | 04/17/2013 | met with steve coffin and ben 491-3824- see sheet S2.12 of approved plans- partial footer and pads ok | BLAKE | BLAKE | | BFT | P | 4507519 | GREINER ELECTRIC, LLC. | E= | C | 04/01/2014 | main level --- outside pole lights -----electric room OK | CRAIGS | CRAIGS | | E= | C | 4712315 | GREINER ELECTRIC, LLC. | EUG | C | 03/17/2014 | 5 light poles west side of building | CRAIGS | CRAIGS | | EUG | C | 4703317 | GREINER ELECTRIC, LLC. | EP | C | 03/17/2014 | panels H1A------L1A ----H2A -------L2A ---- AND XFMR 1A------ OK | CRAIGS | CRAIGS | | EP | C | 4703313 | GREINER ELECTRIC, LLC. | E= | P | 03/17/2014 | 2nd floorOK | CRAIGS | CRAIGS | | E= | P | 4703310 | GREINER ELECTRIC, LLC. | ER | C | 02/28/2014 | ceiling insp for rooms A 102 , 103 , 105 , 112 , 123 , 204 , 207 and 210 | TOMC | TOMC | | ER | C | 4695603 | GREINER ELECTRIC, LLC. | ES | C | 02/05/2014 | Commercial Service: 800 amp 4/w 480 volt CT metered ---- ok to energize | CRAIGS | CRAIGS | | ES | C | 4683237 | GREINER ELECTRIC, LLC. | EP | P | 02/04/2014 | Following sub panel inspected, ---------H1M and H2M | JOSEPH | JOSEPH | | EP | P | 4682441 | GREINER ELECTRIC, LLC. | ES | R | 02/04/2014 | Add brass address tag and bonding bushing at meter housing----------- In the CT cabinet, tighten the connections at neutral bar, and scrap the paint off the lug that is bolted to the back of the ct cabinet. ------------ Duck seal conduits entering the MDP-------------By final you need, a plaque at service disconnect indicating available fault current and date; Jumper the cold water meter, labels for phase color designation. | JOSEPH | JOSEPH | | ES | R | 4682438 | GREINER ELECTRIC, LLC. | ER | P | 02/04/2014 | Walls under the ramps------------- This includes the fire alarm | JOSEPH | JOSEPH | | ER | P | 4682431 | GREINER ELECTRIC, LLC. | EUG | P | 01/15/2014 | under ground to ct cabinet to building --- told contractor to make sure to get csu out here to look at the primary | CRAIGS | CRAIGS | | EUG | P | 4672141 | GREINER ELECTRIC, LLC. | ER | P | 01/15/2014 | see inspection log | CRAIGS | CRAIGS | | ER | P | 4672137 | GREINER ELECTRIC, LLC. | ER | P | 01/03/2014 | see inspection log --- 1st floor walls and lobby soffit ---- except under stair and ramp area | CRAIGS | CRAIGS | | ER | P | 4665942 | GREINER ELECTRIC, LLC. | ER | P | 12/18/2013 | stairwell #2, locker rooms, and 2nd floor hard lid | BRET | BRET | | ER | P | 4658944 | GREINER ELECTRIC, LLC. | ER | P | 12/10/2013 | 2nd floor walls, soffit bb line | BRET | BRET | | ER | P | 4654434 | GREINER ELECTRIC, LLC. | ESL | P | 12/10/2013 | 1st floor slab ok | BRET | BRET | | ESL | P | 4654433 | GREINER ELECTRIC, LLC. | EUG | P | 10/30/2013 | 3-- 3" pvc from building running west--OK | CRAIGS | CRAIGS | | EUG | P | 4632030 | GREINER ELECTRIC, LLC. | ER | P | 09/09/2013 | grid line BB wall --- high roof under insulation power and F/A--OK | CRAIGS | CRAIGS | | ER | P | 4600395 | GREINER ELECTRIC, LLC. | EUG | P | 07/02/2013 | first floor electrical room OK | CRAIGS | CRAIGS | | EUG | P | 4555629 | GREINER ELECTRIC, LLC. | ESL | P | 06/28/2013 | elevation 100 ----aa to bb under slab OK | CRAIGS | CRAIGS | | ESL | P | 4553236 | GREINER ELECTRIC, LLC. | ESL | P | 06/14/2013 | 2a under slab south corridor | CRAIGS | CRAIGS | | ESL | P | 4543135 | GREINER ELECTRIC, LLC. | EUG | P | 05/20/2013 | ufer n.w corner of addition #4 bare | BRET | BRET | | EUG | P | 4526570 | RK MECHANICAL, LLC | H= | C | 06/30/2014 | THIS CONTRACTOR SCOPE OF WORK COMPLETE FOR 2A ADDITION ONLY. | ROBERTV | ROBERTV | | H= | C | 4768249 | RK MECHANICAL, LLC | H= | P | 05/20/2014 | TEST AND BALANCE REPORT RECEIVED AND OK, STILL NEED MECHANICAL PLANS REVISED AND APPROVED SHOWING ACTUAL GAS METER LOCATION AT BUILDING. (THIS IS FOR BUILDING 2A ADDITION ONLY) | ROBERTV | ROBERTV | | H= | P | 4741757 | OTIS ELEVATOR COMPANY | HE= | C | 05/16/2014 | BUFFERS ARE ACCEPTABLE-ELEVATOR COMPLETE | ERIC | ERIC | | HE= | C | 4739909 | OTIS ELEVATOR COMPANY | HE= | P | 04/28/2014 | ELEVATOR 2A COMPLETE. CHANGED TO PARTIAL 5/5/14 DUE TO SOLID BUMPERS INSTALLED VERSUS SPRING BUFFERS, NOTIFIED OTIS AND EMAIL IN TO OTIS FOR INFO. | ERIC | ERIC | | HE= | P | 4728515 | RK MECHANICAL, LLC | H= | P | 03/28/2014 | COMPLETION PENDING REVIEW OF SPLICE SHOWING ACTUAL GAS METER LOCATIONS AND TEST / BALANCE REPORT | ROBERTV | ROBERTV | | H= | P | 4710991 | OTIS ELEVATOR COMPANY | HER | C | 03/24/2014 | ELEVATORS ARE STILL UNDER CONSTRUCTION, OK FOR BUILDING TCO WITHOUT USE OF ELEVATORS IF APPROVED BY BUILDING INSPECTOR AND FIRE DEPARTMENT | ERIC | ERIC | | HER | C | 4728335 | RK MECHANICAL, LLC | H= | P | 03/24/2014 | PUNCH LIST TO INCLUDE: (waived trip fee) -- FINISH CONDENSATE DRAINS TO MINI-SPLIT SYSTEMS, RTU-3 AND W/H'S, NEED ALL MEDIUM PRESSURE LABELING COMPLETED, NEED SPLICED PLANS SHOWING ACTUAL GAS METER LOCATIONS, NEED TEST AND BALANCE REPORT, NOTES MAY BE ADDED AFTER TODAYS INSPECTION PENDING REVIEW OF PLANS. | ROBERTV | ROBERTV | | H= | P | 4707366 | RK MECHANICAL, LLC | HD | C | 03/24/2014 | ALL DUCT COMPLETE | ROBERTV | ROBERTV | | HD | C | 4707361 | RK MECHANICAL, LLC | HV | C | 03/24/2014 | W/H VENTS OK | ROBERTV | ROBERTV | | HV | C | 4707359 | RK MECHANICAL, LLC | H= | R | 03/21/2014 | NOT READY, NOBODY ONSITE -- MECHANICAL CONTRACTOR NEEDS TO IDENTIFY AREAS LACKING INSPECTIONS AND ACKNOWLEDGE INSPECTIONS NEEDED. NEED ONSITE CONTACT TO BE PRESENT WHEN NEXT REQUEST IS SCHEDULED. | ROBERTV | ROBERTV | | H= | R | 4706624 | RK MECHANICAL, LLC | HD | P | 03/21/2014 | LOOKED AT UPPER LEVEL ABOVE CEILING GRID TODAY ONLY | ROBERTV | ROBERTV | | HD | P | 4706800 | OTIS ELEVATOR COMPANY | HE | L | 02/21/2014 | Renewed for 1/2 Fee at 2/21/2014 3:06:31 PM (Receipt#1180391) | JESSIE | JESSIE | | HE | L | 4728334 | RK MECHANICAL, LLC | HC | C | 01/30/2014 | RELEASE METER--2PSI | ROBERTV | ROBERTV | | HC | C | 4681004 | RK MECHANICAL, LLC | HI | C | 01/30/2014 | REMAINDER OF TEST AND INSTALLATION TO W/H'S AND METER OK, NEED TO CHECK REGULATORS, LABELING AT FINAL. | ROBERTV | ROBERTV | | HI | C | 4681001 | RK MECHANICAL, LLC | HI | P | 01/22/2014 | 10 PSI TEST ON 1" LINE FROM MECH ROOM ON 1ST FLOOR UP THROUGH 2ND FLOOR CHASE AND THROUGH ROOF DECK. NEED TO SEE PLANS NEXT TRIP. CONTRACTOR IS CALLING FOR 2# SYSTEM. NO 2# RELEASE AS OF TODAY. | JON | JON | | HI | P | 4675991 | RK MECHANICAL, LLC | HD | P | 11/07/2013 | (PLAN PAGE M2.22)--NORTH AREA UPPER LEVEL ONLY OK TO WRAP, NO FIRE DAMPERS YET | ROBERTV | ROBERTV | | HD | P | 4637699 | RK MECHANICAL, LLC | HI | L | 10/25/2013 | WRONG PERMIT CALLED IN, SHOULD BE #I64201 FOR GAS PIPING FROM EXISTING BUILDING. ENTERED TODAYS INSPECTION RESULT UNDER #I64201 | ROBERTV | ROBERTV | | HI | L | 4629719 | RK MECHANICAL, LLC | HD | P | 10/10/2013 | EAST WALL SPIRAL OK TO WRAP ONLY | ROBERTV | ROBERTV | | HD | P | 4620024 | RK MECHANICAL, LLC | P= | C | 03/21/2014 | | DICK | DICK | | P= | C | 4706370 | RK MECHANICAL, LLC | PTO | C | 03/21/2014 | water and mech room all dwv complete. | DICK | DICK | | PTO | C | 4706366 | RK MECHANICAL, LLC | PRD | C | 03/21/2014 | roof drains and overflows complete. | DICK | DICK | | PRD | C | 4706298 | RK MECHANICAL, LLC | PRD | P | 01/17/2014 | 8" PRIMARY AND SECONDARY RISERS 3" PRIMARY AND SECONDARY HIGH SOUTH WEST CORNER OK. 3" AND 2" PRIMARY AND SECONDARY NORTHWEST SIDE OK. | DICK | DICK | | PRD | P | 4673641 | RK MECHANICAL, LLC | PTO | P | 01/15/2014 | 6 primary and 6 secondary roof drains 4", 6" and 8" high horizontal tested to risers. | DICK | DICK | | PTO | P | 4672117 | RK MECHANICAL, LLC | PTO | P | 01/08/2014 | DWV COMPLETE. NEED WATER AND ROOF DRAINS. | DICK | DICK | | PTO | P | 4667984 | RK MECHANICAL, LLC | PTO | P | 01/03/2014 | WATER BUILDING 2 A, ALL BUT MECH ROOM. | DICK | DICK | | PTO | P | 4666197 | RK MECHANICAL, LLC | PTO | P | 10/25/2013 | MENS AND WOMENS VTR O.K | JOEL | JOEL | | PTO | P | 4629233 | RK MECHANICAL, LLC | PRD | P | 10/18/2013 | 5 R.D ON MID LEVEL DECK O.K | JOEL | JOEL | | PRD | P | 4625126 | RK MECHANICAL, LLC | PTO | P | 10/17/2013 | MENS AND WOMENS LOCKER ROOMS H2O O.K, NEED TO CALL SEPERATE INSPECTION FOR ROOF DRAINS | JOEL | JOEL | | PTO | P | 4624473 | RK MECHANICAL, LLC | PTO | P | 10/16/2013 | LOW TEST H2O, INSTALL UNISTRUT CLAMPS | JOEL | JOEL | | PTO | P | 4623506 | RK MECHANICAL, LLC | PTO | P | 08/23/2013 | women's locker room 107 A, marked on plan. | DICK | DICK | | PTO | P | 4591396 | RK MECHANICAL, LLC | PB | C | 07/01/2013 | | JOEL | JOEL | | PB | C | 4554665 | RK MECHANICAL, LLC | PB | P | 06/27/2013 | POOLEQUIPMENT ROOM AND SHOWERS O.K | JOEL | JOEL | | PB | P | 4552189 | RK MECHANICAL, LLC | PB | P | 06/25/2013 | TRUNK LINE AND BRANCHES FOR BATH ROOMS | JOEL | JOEL | | PB | P | 4550112 | RK MECHANICAL, LLC | PRD | P | 06/20/2013 | UNDERGROUND ROOF DRAINS COMPLETE | JOEL | JOEL | | PRD | P | 4547074 | RK MECHANICAL, LLC | PGI | P | 06/18/2013 | 4'' SEE PLANS | JOEL | JOEL | | PGI | P | 4544892 | RK MECHANICAL, LLC | PB | P | 06/11/2013 | STORM LINE NORTH END O.K | JOEL | JOEL | | PB | P | 4540766 | RK MECHANICAL, LLC | PB | R | 06/10/2013 | CONTRACTOR CANCELLED | JOEL | JOEL | | PB | R | 4539994 | RK MECHANICAL, LLC | PB | P | 06/05/2013 | 8'' STORM FROM EXISTING BUILDING, H2O SERVICE STUBBED IN O.K | JOEL | JOEL | | PB | P | 4536981 | RK MECHANICAL, LLC | PRD | P | 05/01/2013 | SEE PLANS | JOEL | JOEL | | PRD | P | 4515294 |
|
|