GOLDEN TRIANGLE CONST. OF S.C. | B= | C | 09/25/2013 | | JOHNP | JOHNP | | B= | C | 4610491 |
GOLDEN TRIANGLE CONST. OF S.C. | BIN | C | 08/16/2013 | | BERTW | BERTW | | BIN | C | 4587020 |
GOLDEN TRIANGLE CONST. OF S.C. | BFR | C | 08/16/2013 | weld inspection observation report on file | BERTW | BERTW | | BFR | C | 4587018 |
GOLDEN TRIANGLE CONST. OF S.C. | BIN | P | 08/05/2013 | ok pending structural connection observation letters | BERTW | BERTW | | BIN | P | 4578484 |
GOLDEN TRIANGLE CONST. OF S.C. | B= | R | 08/02/2013 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: kmagargal@springsgov.com or 385-5060), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: enijkamp@springsgov.com or 385-5977), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, External Agency Inspection PBS by CSUREVIEW is not Completed yet (Contact: 668-3524), Q-5 INC. Electrical Final Inspection is not Completed yet. Not ready | JEREMYA | JEREMYA | | B= | R | 4577570 |
GOLDEN TRIANGLE CONST. OF S.C. | BFR | C | 08/02/2013 | OK to insulate / GTC will have engineer observation letters at insulation | JEREMYA | JEREMYA | | BFR | C | 4577569 |
Q-5 INC. | BSP | T | 07/17/2013 | PAID (REC#1142536) PLAN SPLICE FEE: $50 by: SHELBY for Electrical | SHELBY | SHELBY | | BSP | T | 4565125 |
GOLDEN TRIANGLE CONST. OF S.C. | BLA | C | 06/24/2013 | | JOHNP | JOHNP | | BLA | C | 4548957 |
Q-5 INC. | BSP | T | 05/07/2013 | PAID (REC#1131420) PLAN SPLICE FEE: $50 by: SHELBY for Electrical | SHELBY | SHELBY | | BSP | T | 4518784 |
GOLDEN TRIANGLE CONST. OF S.C. | BSP | T | 05/03/2013 | PAID (REC#1137330) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised details, removed awnings | SHELLEY | SHELLEY | | BSP | T | 4517450 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | T | 05/03/2013 | PAID (REC#1137331) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice to gas and rtu's | DALEH | DALEH | | BSP | T | 4517382 |
GOLDEN TRIANGLE CONST. OF S.C. | BFI | C | 04/24/2013 | | BLAKE | BLAKE | | BFI | C | 4511245 |
GOLDEN TRIANGLE CONST. OF S.C. | BFN | C | 04/19/2013 | Wall OK | JOHNP | JOHNP | | BFN | C | 4508712 |
GOLDEN TRIANGLE CONST. OF S.C. | BFT | C | 04/18/2013 | compaction tests and open excavation observation on file; no drain is required; ISO, flaot; 10% slope from foundation | DANF | DANF | | BFT | C | 4508051 |
GOLDEN TRIANGLE CONST. OF S.C. | BFN | R | 04/18/2013 | steel not ready for inspection; recall | DANF | DANF | | BFN | R | 4508050 |
GOLDEN TRIANGLE CONST. OF S.C. | BFT | P | 04/12/2013 | Pads/pilasters OK, need compaction test | JOHNP | JOHNP | | BFT | P | 4504730 |
Q-5 INC. | E= | C | 08/27/2013 | | MIKEC | MIKEC | | E= | C | 4593124 |
Q-5 INC. | E= | P | 08/15/2013 | pending outside lights | CRAIGS | CRAIGS | | E= | P | 4586323 |
Q-5 INC. | ER | C | 07/25/2013 | shell only | CRAIGS | CRAIGS | | ER | C | 4571184 |
Q-5 INC. | ER | P | 07/24/2013 | house panel room OK | CRAIGS | CRAIGS | | ER | P | 4570614 |
Q-5 INC. | ER | L | 07/23/2013 | please lease access code | CRAIGS | CRAIGS | | ER | L | 4570014 |
Q-5 INC. | ES | C | 07/18/2013 | Commercial Service: 800 amp meter stack ----- meter only 373 | CRAIGS | CRAIGS | | ES | C | 4566838 |
Q-5 INC. | ES | R | 07/12/2013 | plans need to reflect what is installed complete inspection required | CRAIGS | CRAIGS | | ES | R | 4562577 |
Q-5 INC. | ER | R | 07/12/2013 | need 36" working clearance for the panel | CRAIGS | CRAIGS | | ER | R | 4562576 |
Q-5 INC. | ER | P | 06/28/2013 | shell and mech. room only OK | CRAIGS | CRAIGS | | ER | P | 4553747 |
Q-5 INC. | ER | P | 06/18/2013 | exterior soffit ok | BRET | BRET | | ER | P | 4545116 |
Q-5 INC. | EUG | P | 05/24/2013 | underground to monument sign OK | CRAIGS | CRAIGS | | EUG | P | 4530947 |
Q-5 INC. | EUG | P | 05/06/2013 | 2 east pole lights ditch and k-sons OK | CRAIGS | CRAIGS | | EUG | P | 4518472 |
Q-5 INC. | EUG | P | 04/18/2013 | ufer ground OK | CRAIGS | CRAIGS | | EUG | P | 4508382 |
PRESTIGE MECHANICAL CONTRACTORS,INC | H= | C | 08/02/2013 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 4577010 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HC | C | 07/03/2013 | OK TO SET METER. | NANCY | NANCY | | HC | C | 4556476 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HI | C | 07/03/2013 | 10 LB TEST OK. FOR FINAL HOOK UP GAS LINE TO METER WHEN SET. | NANCY | NANCY | | HI | C | 4556460 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HI | P | 07/02/2013 | SLIGHTLY LOW PRESSURE TEST. GAS LINES INSTALLED AS PER PRINTS. | NANCY | NANCY | | HI | P | 4556189 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 06/25/2013 | 2-RTU'S INSTALLED PER SPLICED PLANS | ROBERTV | ROBERTV | | H= | C | 4550851 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | C | 07/08/2013 | PENDING WRAPS EXPOSED ON GREASE TRAP VENTS | LEE | LEE | | P= | C | 4558025 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PRD | C | 07/08/2013 | | LEE | LEE | | PRD | C | 4558021 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | C | 07/08/2013 | | LEE | LEE | | PTO | C | 4558020 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PRD | P | 07/05/2013 | NO TESTS | LEE | LEE | | PRD | P | 4557369 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | R | 07/05/2013 | NOT READY - NO TESTS | LEE | LEE | | PTO | R | 4557367 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PB | C | 04/26/2013 | | JOEL | JOEL | | PB | C | 4512982 |