HIGH COUNTRY INTERNATIONAL LTD | B= | C | 10/15/2013 | | JOND | JOND | | B= | C | 4622578 |
HIGH COUNTRY INTERNATIONAL LTD | B= | P | 10/14/2013 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection PWO by CSUREVIEW is not Completed yet (Contact: 668-3524), External Agency Inspection PBS by CSUREVIEW is not Completed yet (Contact: 668-3524). need to seal holes in deck ledger / unfinished basement -- Schedule a new Building Final when above items are complete. | JOND | JOND | | B= | P | 4621845 |
HIGH COUNTRY INTERNATIONAL LTD | BLA | C | 07/24/2013 | | JOND | JOND | | BLA | C | 4570386 |
HIGH COUNTRY INTERNATIONAL LTD | BIN | C | 07/11/2013 | | BLAKE | BLAKE | | BIN | C | 4561133 |
HIGH COUNTRY INTERNATIONAL LTD | BSP | P | 07/11/2013 | revised/enlarged deck frame ok | BLAKE | BLAKE | | BSP | P | 4561121 |
HIGH COUNTRY INTERNATIONAL LTD | BFR | C | 07/11/2013 | | BLAKE | BLAKE | | BFR | C | 4561117 |
HIGH COUNTRY INTERNATIONAL LTD | BFR | P | 07/08/2013 | finish firestop / ok to insulate | JOND | JOND | | BFR | P | 4558415 |
HIGH COUNTRY INTERNATIONAL LTD | BSP | P | 07/03/2013 | new deck pier ok / narrow braced wall ok, engineer letter on file | JOND | JOND | | BSP | P | 4556534 |
HIGH COUNTRY INTERNATIONAL LTD | BSP | T | 06/25/2013 | PAID (REC#1137832) ADDITIONAL PLAN REVIEW TIME: $50 From: MICHAEL Add to size of deck | MICHAELA | MICHAELA | | BSP | T | 4550115 |
HIGH COUNTRY INTERNATIONAL LTD | BSP | P | 06/03/2013 | need engineer letter on garage wall and rear wall straps / need new staples on garage wall shear / front and rear porch connections, truss, beams and post are good | JEREMYC | JEREMYC | | BSP | P | 4535363 |
HIGH COUNTRY INTERNATIONAL LTD | BSP | P | 04/30/2013 | rear deck piers ok | JOND | JOND | | BSP | P | 4514392 |
HIGH COUNTRY INTERNATIONAL LTD | BFD | C | 04/15/2013 | open hole and soils on file / drain entire structure | JOND | JOND | | BFD | C | 4505893 |
HIGH COUNTRY INTERNATIONAL LTD | BFI | C | 04/15/2013 | | JOND | JOND | | BFI | C | 4505892 |
HIGH COUNTRY INTERNATIONAL LTD | BFN | C | 04/04/2013 | design on file / need full soils at drain | JOND | JOND | | BFN | C | 4499906 |
HIGH COUNTRY INTERNATIONAL LTD | BFN | R | 04/03/2013 | cancelled in field | JOND | JOND | | BFN | R | 4498833 |
HIGH COUNTRY INTERNATIONAL LTD | BFT | C | 04/01/2013 | | JOND | JOND | | BFT | C | 4497117 |
WINTERS ELECTRIC, INC. | E= | C | 10/11/2013 | STRAP RISER, CHECK OUTSIDE CEILING FAN. ------------------ 30 AMP A.C | MIKEC | MIKEC | | E= | C | 4621358 |
WINTERS ELECTRIC, INC. | ES | C | 07/05/2013 | Residential Underground: NEW 200 AMP SERVICE | MIKEC | MIKEC | | ES | C | 4557745 |
WINTERS ELECTRIC, INC. | ER | C | 07/05/2013 | UNFINISHED BASEMENT | MIKEC | MIKEC | | ER | C | 4557742 |
KENT SHEET METAL, INC | H= | C | 10/10/2013 | ALL OK. NOTES: CONDENSATE TRAP NOT REQUIRED - FULL AC - UNFINISHED BASEMENT | JERRYF | JERRYF | | H= | C | 4620208 |
KENT SHEET METAL, INC | HC | C | 07/05/2013 | RELEASE METER | MICHAELS | MICHAELS | | HC | C | 4557549 |
KENT SHEET METAL, INC | HRR | C | 07/05/2013 | Rough ok. Note: duct design, no osa, UB, a/c rough(coil and lineset), direct vent furnace. AT FINAL: check for p-trap on a/c coil. | MICHAELS | MICHAELS | | HRR | C | 4557547 |
ALPINE CREST PLBG. & HEATING INC. | HI | C | 07/02/2013 | 10# test ok. 1 1/4" main to furn, w/h, c-top, fp, bbq. No permit card in sight. | MICHAELS | MICHAELS | | HI | C | 4555754 |
ALPINE CREST PLBG. & HEATING INC. | P= | C | 10/11/2013 | HAS R.P FOR IRRIGATION IN MECH. ROOM | LEE | LEE | | P= | C | 4621518 |
ALPINE CREST PLBG. & HEATING INC. | PTO | C | 07/02/2013 | | LEE | LEE | | PTO | C | 4556080 |
ALPINE CREST PLBG. & HEATING INC. | PB | C | 04/30/2013 | | LEE | LEE | | PB | C | 4514983 |