GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 05/20/2014 | All other required Final inspections are complete. (This is a computer generated result) | JOHNP | JOHNP | | B= | C | 4741747 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 06/12/2013 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet. Need other finals | JOHNP | JOHNP | | B= | P | 4541508 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/24/2013 | Smoke barrier above grid OK | JOHNP | JOHNP | | BFR | P | 4530183 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/07/2013 | Walls OK, call for above grid inspection | JOHNP | JOHNP | | BFR | P | 4518675 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/30/2013 | Rooms marks on page A 110 of approved plans, need other rough inspections | JOHNP | JOHNP | | BFR | P | 4514252 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 04/29/2013 | PAID (REC#1126559) PLAN SPLICE FEE: $50 by: MICHAEL for Construction: Revise stress lab corridor | MICHAELA | MICHAELA | | BSP | T | 4514110 |
COLORADO SHEET METAL CO., INC. | BSP | T | 04/29/2013 | PAID (REC#1127364) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice | DALEH | DALEH | | BSP | T | 4513576 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 04/29/2013 | PAID (REC#1126559) PLAN SPLICE FEE: $50 by: SHELBY for Electrical | SHELBY | SHELBY | | BSP | T | 4513519 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 04/29/2013 | PAID (REC#1126559) ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN new splice pages se clouds | TCRIPPEN | TCRIPPEN | | BSP | T | 4513513 |
GREEN ELECTRIC INC | E= | C | 08/07/2013 | | CRAIGS | CRAIGS | | E= | C | 4580597 |
GREEN ELECTRIC INC | E= | C | 06/12/2013 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | E= | C | 4542081 |
GREEN ELECTRIC INC | E= | C | 06/12/2013 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | E= | C | 4542080 |
GREEN ELECTRIC INC | ER | C | 06/12/2013 | FIRE ALARM INSPECTION: above ceiling completed | CRAIGS | CRAIGS | | ER | C | 4542073 |
GREEN ELECTRIC INC | ER | P | 05/28/2013 | FIRE ALARM INSPECTION: all ceilings | GARYL | GARYL | | ER | P | 4531204 |
GREEN ELECTRIC INC | ER | P | 05/28/2013 | FIRE ALARM INSPECTION: all ceilings..... | GARYL | GARYL | | ER | P | 4531200 |
GREEN ELECTRIC INC | ER | P | 05/09/2013 | FIRE ALARM INSPECTION: walls OK | CRAIGS | CRAIGS | | ER | P | 4520522 |
GREEN ELECTRIC INC | ER | P | 05/07/2013 | walls rooms 1008 , 1009 , 1010 , 1015 , 1017 , 1018 , 1019 ---- F/A also | CRAIGS | CRAIGS | | ER | P | 4518625 |
GREEN ELECTRIC INC | ER | P | 04/30/2013 | 1011,1012,1013 walls f.a ok same walls | BRET | BRET | | ER | P | 4514863 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 08/20/2013 | PIPING MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 4588447 |
COLORADO SHEET METAL CO., INC. | H= | C | 07/30/2013 | REVISED TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 4574841 |
COLORADO SHEET METAL CO., INC. | H= | P | 07/01/2013 | TEST AND BALANCE REPORT RECEIVED. SEE NOTES ON REPORT REGARDING EF28 AND EDD-01. READINGS OUTSIDE OF +/- 10% ALLOWED. NEED REVISED REPORT OR LETTER FROM ENGINEER APPROVING EXISTING TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4554336 |
COLORADO SHEET METAL CO., INC. | H= | P | 05/28/2013 | SMOKE DAMPERS OK, CHECK SECONDARY CONDENSATE DRAIN ON LIEBERT IN CT ROOM, NEED TEST AND BALANCE REPORT, REST OK | ROBERTV | ROBERTV | | H= | P | 4531234 |
COLORADO SHEET METAL CO., INC. | HD | C | 05/28/2013 | ABOVE CEILING OK | ROBERTV | ROBERTV | | HD | C | 4531233 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/20/2013 | HOT LAB, STRESS LAB, INJECTION AND SPECT CT ROUGHS OK, NEED TO CHECK 5-SMOKE DAMPERS NEXT INSPECTION, ENGINEER TO REMOVE RM 1003 SCOPE OF WORK PER CONTRACTOR. | ROBERTV | ROBERTV | | HD | P | 4527161 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/03/2013 | NUC MED GAMMA ROOMS-1011, 1012, 1013, UPTAKE ROOM-1015, WK ROOM-1017, AND CONTROL ROOM-1018 ROUGH OK TO INSULATE | ROBERTV | ROBERTV | | HD | P | 4517369 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 04/30/2013 | PIPING FOR FCU-01 OK FROM STRESS LAB 1007 THRU CORRIDOR 1008 TO UNIT OKAY TO INSULATE AND LABEL. NEED STAMPED PLANS ONSITE.--- NOTES FOR INSPECTOR: EMERGENCY ROOM PARKING IS BEST ACCESS | ROBERTV | ROBERTV | | HWP | C | 4514790 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 06/10/2013 | | JOEL | JOEL | | P= | C | 4540086 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 05/08/2013 | | LEE | LEE | | PTO | C | 4519583 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/30/2013 | WALLS O.K | JOEL | JOEL | | PTO | P | 4514609 |