GRAY CONSTRUCTION, INC. | B= | C | 06/03/2014 | All other required Final inspections are complete. (This is a computer generated result) | JOND | JOND | | B= | C | 4750306 |
GRAY CONSTRUCTION, INC. | B= | P | 06/02/2014 | Additional Inspections Required: External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: enijkamp@springsgov.com or 385-5977). | JOND | JOND | | B= | P | 4749173 |
GRAY CONSTRUCTION, INC. | B= | R | 05/06/2014 | Additional Inspections Required: External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: enijkamp@springsgov.com or 385-5977). need address numbers on house / step off front door landing is greater than 7 3/4" and step off back deck / final grade is ok | JOND | JOND | | B= | R | 4733467 |
GRAY CONSTRUCTION, INC. | B= | P | 04/22/2014 | Temp CO: pending exterior issues ( Expires: 5/22/2014 12:00:00 AM) | BPHILLIPS | BPHILLIPS | | B= | P | 4724961 |
GRAY CONSTRUCTION, INC. | B= | P | 04/21/2014 | Additional Inspections Required: External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: enijkamp@springsgov.com or 385-5977). int of house ok / ext needs final grade touched up / tip outs / front steps not complete / need step off back deck / seal penetrations -- Schedule a new Building Final when above items are complete. | JOHN | JOHN | | B= | P | 4723840 |
GRAY CONSTRUCTION, INC. | BLA | C | 11/04/2013 | | JOND | JOND | | BLA | C | 4635117 |
GRAY CONSTRUCTION, INC. | BIN | C | 10/31/2013 | | JOND | JOND | | BIN | C | 4633157 |
GRAY CONSTRUCTION, INC. | BFR | C | 10/31/2013 | engineer letter on file | JOND | JOND | | BFR | C | 4633152 |
GRAY CONSTRUCTION, INC. | BFR | R | 10/24/2013 | G4 girder not bearing per plan / need 2 st22 straps at B9 per plan / need truss connection at trusses in garage / fireblock garage bracket / ok to insulate | JOND | JOND | | BFR | R | 4628549 |
GRAY CONSTRUCTION, INC. | BTR | C | 10/15/2013 | | JOND | JOND | | BTR | C | 4622564 |
GRAY CONSTRUCTION, INC. | BSP | T | 10/15/2013 | PAID (REC#1160061) PLAN SPLICE FEE: $50 by: JIMA for Construction: splice : added finished footage to basement | JIMA | JIMA | | BSP | T | 4622495 |
GRAY CONSTRUCTION, INC. | BSP | T | 08/09/2013 | PAID (REC#1147615) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice | TCRIPPEN | TCRIPPEN | | BSP | T | 4581837 |
GRAY CONSTRUCTION, INC. | BFI | C | 07/10/2013 | | BLAKE | BLAKE | | BFI | C | 4560254 |
GRAY CONSTRUCTION, INC. | BSP | P | 07/10/2013 | all fdtn and crawlspace perimeter insulation ok | BLAKE | BLAKE | | BSP | P | 4560253 |
GRAY CONSTRUCTION, INC. | BFD | C | 07/05/2013 | | JOND | JOND | | BFD | C | 4557577 |
GRAY CONSTRUCTION, INC. | BSP | P | 07/05/2013 | structural floor steel ok | JOND | JOND | | BSP | P | 4557552 |
GRAY CONSTRUCTION, INC. | BFN | C | 06/21/2013 | design, soils and open hole on file / caisson observation letter on file / drain entire structure | JOND | JOND | | BFN | C | 4547810 |
GRAY CONSTRUCTION, INC. | BFT | C | 06/05/2013 | caissons, engineer on site | JOND | JOND | | BFT | C | 4537080 |
TIE ELECTRIC INC | E= | C | 03/25/2014 | 30 AMP A.C | MIKEC | MIKEC | | E= | C | 4708369 |
TIE ELECTRIC INC | ER | C | 10/17/2013 | | MIKEC | MIKEC | | ER | C | 4624822 |
TIE ELECTRIC INC | ES | C | 10/17/2013 | Residential Underground: NEW 200 AMP PANEL | MIKEC | MIKEC | | ES | C | 4624820 |
MJC HEATING & COOLING | H= | C | 03/28/2014 | Correction made. | MICHAELS | MICHAELS | | H= | C | 4710994 |
MJC HEATING & COOLING | H= | P | 03/25/2014 | Exhaust and intake not secure to furnaces, rest ok. Note: FB, a/c rough(coil and lineset) for main, no mantels, high/low transfer in wall. | MICHAELS | MICHAELS | | H= | P | 4708189 |
MJC HEATING & COOLING | HC | C | 10/17/2013 | RELEASE METER | JERRYF | JERRYF | | HC | C | 4624915 |
MJC HEATING & COOLING | HRR | C | 10/17/2013 | AT FINALCONFIRM TRANSFER GRILLES AND PANNING ON BASEMENT RETURN - REST OK. NOTES: FINISHED BASEMENT AC ROUGH x1 - 6" OSA TO FURNACE - 2 DIRECT VENT FURNACES | JERRYF | JERRYF | | HRR | C | 4624322 |
COLORADO GAS SYSTEMS | HI | C | 10/14/2013 | CSST must be sized all the way back to the meter. It won't carry the load as is. Rest ok. Note: 1 1/2" main, 2 furn, 2 w/h. 2 f/p. According to contractor's Trak chart, #19 (1/2") will carry 34K BTU providing for the load. 10/15/13 | MARK | MARK | | HI | C | 4622106 |
JOEAGLE PLUMBING & HEATING, INC. | P= | C | 03/27/2014 | | JOEL | JOEL | | P= | C | 4709650 |
JOEAGLE PLUMBING & HEATING, INC. | P= | P | 03/25/2014 | all hose threads in mech room need back flow protection, irrigation line not complete | JOEL | JOEL | | P= | P | 4708009 |
JOEAGLE PLUMBING & HEATING, INC. | PTO | C | 10/07/2013 | GARAGE SINK TRAPPED INSIDE -- MASTER LAVS REQUIRE AAV'S AT FINAL -- BAR SINK HAS VTR | LEE | LEE | | PTO | C | 4618184 |
JOEAGLE PLUMBING & HEATING, INC. | PB | C | 07/08/2013 | 3/4" COPPER SERVICE | LEE | LEE | | PB | C | 4558804 |