R. E. ALLEN CONSTRUCTION | B= | C | 07/16/2013 | | CHRISM | CHRISM | | B= | C | 4563617 |
R. E. ALLEN CONSTRUCTION | B= | P | 07/12/2013 | engineer letter on file/still need fire final -- Schedule a new Building Final when above items are complete. | FRANK | FRANK | | B= | P | 4562546 |
R. E. ALLEN CONSTRUCTION | B= | R | 07/09/2013 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), HEATING & PLUMBING ENGRS, INC Mechanical Final Inspection is not Completed yet. OK to stock; 1) complete fire final 2) HI completed 3) dbl keyed locks missing open/close indicator and sign above 4) need engineer's letter of inspecction for roof joist welding reinforcement and different direction of joists for added 2 RTU | DANF | DANF | | B= | R | 4559714 |
R. E. ALLEN CONSTRUCTION | BFR | P | 06/24/2013 | Bathroom walls now complete | BLAKE | BLAKE | | BFR | P | 4549395 |
R. E. ALLEN CONSTRUCTION | BFR | P | 06/03/2013 | walls ok pending other roughs ok all but bathrooms | CHRISM | CHRISM | | BFR | P | 4535655 |
LEGACY ELECTRIC | E= | C | 07/08/2013 | | GARYL | GARYL | | E= | C | 4558869 |
LEGACY ELECTRIC | ER | P | 06/18/2013 | room 1 for ceiling only ok | CRAIG | CRAIG | | ER | P | 4544888 |
LEGACY ELECTRIC | ER | P | 06/14/2013 | rooms 2 and 3 for ceiling only ok | CRAIG | CRAIG | | ER | P | 4543590 |
LEGACY ELECTRIC | ER | P | 06/10/2013 | dressing room ceilings only | GARYL | GARYL | | ER | P | 4540232 |
LEGACY ELECTRIC | ER | P | 06/03/2013 | WALLS | MIKEC | MIKEC | | ER | P | 4535106 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 07/11/2013 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 4561597 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 07/09/2013 | COMPLETION PENDING TEST AND BALANCE REPORT | ROBERTV | ROBERTV | | H= | P | 4559769 |
HEATING & PLUMBING ENGINEERS, INC | HI | C | 07/09/2013 | GAS TEST OK | ROBERTV | ROBERTV | | HI | C | 4559768 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 07/08/2013 | MECHANICAL FINAL OK PENDING PRESSURE TEST ON GAS LINE AND RECEIPT OF TEST AND BALANCE REPORT. NOTE: GAS LINE INSTALLED AS PER PRINTS. | NANCY | NANCY | | H= | P | 4558740 |
HEATING & PLUMBING ENGINEERS, INC | HD | C | 06/13/2013 | ABOVE ALL HARDLIDS OK, CHECK FLEX, REGISTERS AND GRILLES THROUGH FRAMED REGISTER OPENINGS AND ROOF INSPECTION AT FINAL | ROBERTV | ROBERTV | | HD | C | 4542613 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 06/06/2013 | TRUNK LINES AND LATERALS OK, OK TO WRAP. NO UNITS, DROPS, FLEX OR EXHAUST YET. | NANCY | NANCY | | HD | P | 4538080 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 07/08/2013 | PENDING COLD.WATER PIPING RAISED UP TO TOP / ABOVE W/H FOR VAC- RELIEF VALVE | LEE | LEE | | P= | C | 4558088 |
HEATING & PLUMBING ENGINEERS, INC | PTO | C | 07/08/2013 | | JOEL | JOEL | | PTO | C | 4558010 |
HEATING & PLUMBING ENGINEERS, INC | PB | C | 06/24/2013 | | JOEL | JOEL | | PB | C | 4549197 |