RAINE BUILDING LLC. | B= | C | 12/26/2018 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 6063100 |
RAINE BUILDING LLC. | B= | P | 12/19/2018 | Restrooms 128 & 129 OK / remodel complete. Additional Inspections Required (computer generated): ARTISAN PIPE SYSTEMS, INC. Plumbing Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 6058669 |
RAINE BUILDING LLC. | B= | P | 11/21/2018 | Restrooms 128 & 129 - partitions OK, still need Final to inspect remainder of restroom components -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): ARTISAN PIPE SYSTEMS, INC. Plumbing Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 6032805 |
RAINE BUILDING LLC. | B16 | P | 10/18/2018 | Discussed project scope and incomplete items with new Contractor - the only areas still needing inspections are Restrooms 128 & 129, discussed accessible elements, discussed other Finals | RICHB | RICHB | | B16 | P | 5998856 |
STEINER CONSTRUCTION, INC | BE | L | 09/19/2018 | Renewed at 9/19/2018 2:24:34 PM | GITA | GITA | | BE | L | 5970284 |
STEINER CONSTRUCTION, INC | BE | C | 10/10/2017 | | MINDY | MINDY | | BE | C | 5650870 |
STEINER CONSTRUCTION, INC | B= | P | 04/13/2017 | room 144 door is now single action -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ARTISAN PIPE SYSTEMS, INC. Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5473919 |
STEINER CONSTRUCTION, INC | BE | L | 04/13/2017 | Renewed at 4/13/2017 9:55:25 AM | MINDY | MINDY | | BE | L | 5473764 |
STEINER CONSTRUCTION, INC | B= | R | 10/12/2016 | office 144 / need single action lock at door to office / rest of office OK. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ARTISAN PIPE SYSTEMS, INC. Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 5316583 |
STEINER CONSTRUCTION, INC | B= | P | 04/12/2016 | sink in green room #130 now at 34" AFF and complete -- Schedule a new Building Final when above items are complete. | DANE | DANE | | B= | P | 5174809 |
STEINER CONSTRUCTION, INC | B= | P | 10/16/2015 | inspected only room 130 needs sink lowered to 34" maximum height -- Schedule a new Building Final when above items are complete. | BOBF | BOBF | | B= | P | 5059194 |
STEINER CONSTRUCTION, INC | B= | P | 04/23/2015 | room 131 "green room" complete -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ARTISAN PIPE SYSTEMS, INC. Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 4941867 |
STEINER CONSTRUCTION, INC | B= | P | 10/23/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ARTISAN PIPE SYSTEMS, INC. Plumbing Final Inspection is not Completed yet. met with roi 499-2488- see sheet A1.1, all areas ok except for clouded area that includes bathrooms and "green room" -- Schedule a new Building Final when above items are complete. | BLAKE | BLAKE | | B= | P | 4841014 |
STEINER CONSTRUCTION, INC | BE | L | 09/15/2014 | Renewed at 9/15/2014 8:38:46 AM | MINDY | MINDY | | BE | L | 4815522 |
STEINER CONSTRUCTION, INC | BE | C | 03/14/2014 | | JANE | JANE | | BE | C | 4702939 |
STEINER CONSTRUCTION, INC | BFR | C | 10/02/2013 | west wall south 1/3 to deck OK; Per Michael, contractor completes framing | DANF | DANF | | BFR | C | 4615012 |
STEINER CONSTRUCTION, INC | BSP | P | 07/29/2013 | structural lintel ok at new rear entrance | JOHN | JOHN | | BSP | P | 4573628 |
STEINER CONSTRUCTION, INC | BSP | P | 07/29/2013 | Framing for 2 ramps OK; rear dbl door Lentil OK; boys and girls and private bath framing OK pending plumbing | DANF | DANF | | BSP | P | 4573260 |
STEINER CONSTRUCTION, INC | BSP | T | 07/11/2013 | PAID (REC#1142174) ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN new splice pages see clouds | TCRIPPEN | TCRIPPEN | | BSP | T | 4561495 |
ARTISAN PIPE SYSTEMS, INC. | BSP | P | 07/11/2013 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical | DALEH | DALEH | | BSP | P | 4561481 |
STEINER CONSTRUCTION, INC | BFR | P | 07/02/2013 | walls ok pending plumbing rough, stage framing ok | CHRISM | CHRISM | | BFR | P | 4555458 |
FOSTER ELECTRIC CORPORATION | E= | C | 11/01/2013 | corrections made | BRIAN | BRIAN | | E= | C | 4633874 |
FOSTER ELECTRIC CORPORATION | EP | R | 10/31/2013 | NEED TO CORRECT CONNECTION ON NEUTRAL IN DISCONNECT-- | BRIAN | BRIAN | | EP | R | 4633577 |
FOSTER ELECTRIC CORPORATION | E= | P | 10/29/2013 | Need panel inspection called in, RTU's--2 panel rooms Stage panel room for RTU's=5- 25amp breaker, 3-30 amp breakers, 1-20 amp, 1-15 amp. electric room 4-25 amp breakers, 2-20 amp breakers, lighting and receptacles complete | GARYL | GARYL | | E= | P | 4631562 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/26/2013 | all dropped ceilings | GARYL | GARYL | | ER | P | 4611702 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | C | 09/25/2013 | FIRE ALARM INSPECTION: | GARYL | GARYL | | E= | C | 4610694 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | C | 09/25/2013 | FIRE ALARM INSPECTION: | GARYL | GARYL | | ER | C | 4610693 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/05/2013 | ceiling south of blue wall | GARYL | GARYL | | ER | P | 4599296 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/03/2013 | open office ceilings | GARYL | GARYL | | ER | P | 4597389 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 08/27/2013 | FIRE ALARM INSPECTION: offices and conference area by offices ceilings only----No fire alarm card on site to sign, if there is one and you need it signed asap,bring to office in AM and i will sign it | GARYL | GARYL | | ER | P | 4593683 |
FOSTER ELECTRIC CORPORATION | ER | P | 08/26/2013 | all office(s) ceilings | GARYL | GARYL | | ER | P | 4592597 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 08/12/2013 | FIRE ALARM INSPECTION: walls only | GARYL | GARYL | | ER | P | 4583428 |
FOSTER ELECTRIC CORPORATION | ER | P | 07/01/2013 | WALLS | MIKEC | MIKEC | | ER | P | 4554905 |
HVAC SOLUTIONS, INC. | H= | C | 12/16/2013 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 4657179 |
ARTISAN PIPE SYSTEMS, INC. | H= | C | 09/18/2013 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 4606078 |
ARTISAN PIPE SYSTEMS, INC. | H= | P | 09/17/2013 | GAS FINAL OK PENDING CONTRACTOR CALLING IN INSPECTION. | NANCY | NANCY | | H= | P | 4605751 |
HVAC SOLUTIONS, INC. | H= | P | 09/17/2013 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4605748 |
HVAC SOLUTIONS, INC. | HD | P | 08/22/2013 | ABOVE CEILING ALL OK ON RTU'S 16, 19, 24, 25, 26, 29, AND 30. RTU'S 11 AND 13: ROUGH DUCTS OK, OK TO WRAP. EF1: EXHAUST DUCT THROUGH ROOF OK, NO ROOF INSPECTION YET. TF1: OK. | NANCY | NANCY | | HD | P | 4590956 |
ARTISAN PIPE SYSTEMS, INC. | HI | C | 08/09/2013 | FOUR 10 LB TESTS OK ON RTU'S 7, 12, 14, 17, 18'S, AND 27. GAS PIPE TO ALL RTU'S INSTALLED. FOR FINAL INSTALL REGULATORS, HOOK UP UNITS AND LABEL ALL MEDIUM PRESSURE GAS LINES ON ROOF. | NANCY | NANCY | | HI | C | 4582461 |
ARTISAN PIPE SYSTEMS, INC. | HC | C | 08/01/2013 | 11,608 MBH ADDED TO EXISTING METER. | NANCY | NANCY | | HC | C | 4576430 |
ARTISAN PIPE SYSTEMS, INC. | HI | P | 08/01/2013 | FIVE 10 LB TESTS OK ON UNITS 15, 16, 19, 24, 25, 26, 28, 29 AND 30. INSTALLED AS PER PRINTS. NO REGULATORS YET.
| NANCY | NANCY | | HI | P | 4576402 |
HVAC SOLUTIONS, INC. | HD | P | 07/26/2013 | RTU'S 15, 16, 19, 24, 25, 26, 29 AND 30: ROUGH DUCTS OK, OK TO WRAP SUPPLY LATERALS. EF6: EXHAUST DUCTS OK. | NANCY | NANCY | | HD | P | 4572437 |
ARTISAN PIPE SYSTEMS, INC. | P= | C | 12/26/2018 | Contractor 21313 took over scope of work and completed. | JOEL | JOEL | | P= | C | 6063099 |
ARTISAN PIPE SYSTEMS, INC. | PE | L | 12/26/2018 | Renewed at 12/26/2018 3:44:02 PM | JOEL | JOEL | | PE | L | 6063096 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | P= | C | 12/19/2018 | Corrections made. | DANR | DANR | | P= | C | 6057763 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | P= | P | 12/04/2018 | This inspection restroom 128 and 129: caulk all lavs and urinals, left mens lav lacking side clearance, mens accessible toilet needs to flush to open side, rest ok. | DANR | DANR | | P= | P | 6042405 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | P= | P | 11/29/2018 | Notes revised 11/30/2018 called contractor. Need inspections restrooms 128 and 129, rest ok. | DANR | DANR | | P= | P | 6037885 |
ARTISAN PIPE SYSTEMS, INC. | P= | P | 10/10/2017 | @ rm # 116 need to set shwr temp, rest ok for rm # 116 oly | JOHNS | JOHNS | | P= | P | 5650253 |
ARTISAN PIPE SYSTEMS, INC. | PE | L | 10/10/2017 | Renewed online for 1/2 Fee at 10/10/2017 6:26:28 AM (RECEIPT #: 1458162) | WEBSITE | WEBSITE | | PE | L | 5649680 |
ARTISAN PIPE SYSTEMS, INC. | P= | P | 10/12/2016 | HAND SINK AT OFFICE 144 OK | GABE | GABE | | P= | P | 5317301 |
ARTISAN PIPE SYSTEMS, INC. | PE | L | 10/11/2016 | Renewed for 1/2 Fee at 10/11/2016 1:25:17 PM (Receipt#1370964) | GITA | GITA | | PE | L | 5315610 |
ARTISAN PIPE SYSTEMS, INC. | P= | P | 10/15/2015 | SINK IN GREEN ROOM OK , PERMIT IS OLD , | GABE | GABE | | P= | P | 5058194 |
ARTISAN PIPE SYSTEMS, INC. | PE | L | 10/14/2015 | Renewed at 10/14/2015 2:17:50 PM | KENYATTA | KENYATTA | | PE | L | 5057615 |
ARTISAN PIPE SYSTEMS, INC. | PE | L | 02/12/2015 | Renewed online for 1/2 Fee at 2/12/2015 4:57:10 PM (RECEIPT #: 1245866) | WEBSITE | WEBSITE | | PE | L | 4902075 |
ARTISAN PIPE SYSTEMS, INC. | P= | P | 03/14/2014 | bathrooms, mop sink, water heater as marked on plan. | DICK | DICK | | P= | P | 4702570 |
ARTISAN PIPE SYSTEMS, INC. | PTO | C | 08/07/2013 | | JOEL | JOEL | | PTO | C | 4580487 |
ARTISAN PIPE SYSTEMS, INC. | PTO | P | 08/06/2013 | SUPPORT 3'' VENT UP THRU ROOF, ADD DRAINS FOR BACK TO BACK LAVS | JOEL | JOEL | | PTO | P | 4579632 |
ARTISAN PIPE SYSTEMS, INC. | PTO | P | 07/24/2013 | 1/2 BATH AND TWO CLASSROOM SINKS WEST SIDE OK | LEE | LEE | | PTO | P | 4570203 |
ARTISAN PIPE SYSTEMS, INC. | PTO | P | 07/16/2013 | FOR NORTH MAIN RESTROOMS AND TWO POWDER BATHS WALLS ONLY -- NEED TO COMPLETE NAIL / SCREW PROTECTION NORTH RESTROOM WALL | LEE | LEE | | PTO | P | 4563995 |
ARTISAN PIPE SYSTEMS, INC. | PB | C | 07/16/2013 | FOR NORTH MAIN RESTROOM AND AND ADDITIONAL SINK | LEE | LEE | | PB | C | 4563972 |
ARTISAN PIPE SYSTEMS, INC. | PTO | P | 07/10/2013 | SOUTH RESTROOM WALLS OK -- SOUTH BREAK SINK WALL ONLY OK -- NEED TO ADJUST HORIZ. SUPPORT SPACING ON OVERHEAD COPPER | LEE | LEE | | PTO | P | 4559962 |