TIMBER LODGE BUILDERS, INC. | B= | C | 02/06/2014 | All other required Final inspections are complete. (This is a computer generated result) | JOND | JOND | | B= | C | 4683595 |
TIMBER LODGE BUILDERS, INC. | B= | P | 02/05/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: enijkamp@springsgov.com or 385-5977). finished basement | JOND | JOND | | B= | P | 4683352 |
TIMBER LODGE BUILDERS, INC. | BLA | C | 11/05/2013 | | JOND | JOND | | BLA | C | 4635691 |
TIMBER LODGE BUILDERS, INC. | BFR | C | 10/11/2013 | | BLAKE | BLAKE | | BFR | C | 4621117 |
TIMBER LODGE BUILDERS, INC. | BIN | C | 10/11/2013 | | BLAKE | BLAKE | | BIN | C | 4621111 |
TIMBER LODGE BUILDERS, INC. | BFR | R | 10/08/2013 | strap balloon walls at peaks and corners / nail ml beam together better by great room / fireblock garage brackets / shoot down t-posts in garage / ledger in garage calls for 1 lag @ 16" oc / 24" oc framing under stairs / landing joist hangers missing / nail off beam strap at landing / ok to insulate | JOND | JOND | | BFR | R | 4618583 |
TIMBER LODGE BUILDERS, INC. | BSP | P | 10/01/2013 | insulation behind fireplace ok | JOND | JOND | | BSP | P | 4613966 |
TIMBER LODGE BUILDERS, INC. | BSP | P | 09/18/2013 | front porch roof ok, no post at this time | JOND | JOND | | BSP | P | 4606280 |
TIMBER LODGE BUILDERS, INC. | BSP | R | 09/18/2013 | no plans on site for front porch inspection | JOND | JOND | | BSP | R | 4606188 |
TIMBER LODGE BUILDERS, INC. | BFT | C | 07/29/2013 | engineer letter on file | JOND | JOND | | BFT | C | 4573848 |
TIMBER LODGE BUILDERS, INC. | BFN | C | 07/29/2013 | engineer letter on file / design and soils on file / drain usable area | JOND | JOND | | BFN | C | 4573847 |
TIMBER LODGE BUILDERS, INC. | BFD | C | 07/29/2013 | | JOND | JOND | | BFD | C | 4573845 |
TIMBER LODGE BUILDERS, INC. | BFN | P | 07/29/2013 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFN | P | 4573015 |
TIMBER LODGE BUILDERS, INC. | BFT | P | 07/29/2013 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFT | P | 4573014 |
WINTERS ELECTRIC, INC. | E= | C | 01/30/2014 | | MIKEC | MIKEC | | E= | C | 4680880 |
WINTERS ELECTRIC, INC. | E= | C | 01/30/2014 | 25 AMP A.C | MIKEC | MIKEC | | E= | C | 4680446 |
WINTERS ELECTRIC, INC. | ES | C | 10/07/2013 | Residential Underground: 200 amp 3/w new res | CRAIGS | CRAIGS | | ES | C | 4617850 |
WINTERS ELECTRIC, INC. | ER | C | 10/07/2013 | #6 al --- no multi ----- unfinshed basement | CRAIGS | CRAIGS | | ER | C | 4617849 |
ASAP | H= | C | 02/04/2014 | OK NOTES: A/C INSTALLED, HI/LO COMBUSTION AIR | KEITHW | KEITHW | | H= | C | 4682512 |
ASAP | HC | C | 10/07/2013 | RELEASE METER | JERRYF | JERRYF | | HC | C | 4617889 |
ASAP | HRR | C | 10/07/2013 | BY FINAL SEAL SUPPLY FLEX CONNECTOR - REST OK. NOTES: 6" OSA TO FURNACE - COIL ONLY - UNFINISHED BASEMENT - FP FRAMING OK - | JERRYF | JERRYF | | HRR | C | 4617879 |
DOUBLE J GAS, INC. | HI | C | 10/04/2013 | 10# OK. NOTES: 1" MAIN - FURN - WH - FP -40' DESIGN | JERRYF | JERRYF | | HI | C | 4617142 |
JOLLY PLUMBING & HEATING INC. | P= | C | 01/27/2014 | | TIM | TIM | | P= | C | 4677857 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 09/25/2013 | | LEE | LEE | | PTO | C | 4610942 |
JOLLY PLUMBING & HEATING INC. | PB | C | 08/08/2013 | Ok to pour concrete with cut out to check coupling when there is water for pressure. | JACK | JACK | | PB | C | 4581244 |
JOLLY PLUMBING & HEATING INC. | PB | P | 08/02/2013 | NO TEST ON SILVER SOLDERED COUPLING -- TURN ON WATER AT STOP BOX ?? -- REST OK | LEE | LEE | | PB | P | 4577815 |