LANG LOG HOMES, LLC | B= | C | 06/13/2014 | | CHRISM | CHRISM | | B= | C | 4757534 | LANG LOG HOMES, LLC | B= | P | 06/05/2014 | Additional Inspections Required: Electrical Final Inspection is not Completed yet. E=, guardrail at end of front porch, address numbers on house, landing at house to garage door swings over a step, cover exposed foam in mech room with ignition barrier -- Schedule a new Building Final when above items are complete. | CHRISM | CHRISM | | B= | P | 4751815 | LANG LOG HOMES, LLC | BIN | C | 02/21/2014 | | CHRISM | CHRISM | | BIN | C | 4691286 | LANG LOG HOMES, LLC | BFR | C | 02/21/2014 | | CHRISM | CHRISM | | BFR | C | 4691285 | LANG LOG HOMES, LLC | BFR | R | 02/11/2014 | ok to insulate, isolate bearing walls in basement, garage rake wall over height, truss details dont match, all draftstop | CHRISM | CHRISM | | BFR | R | 4685446 | LANG LOG HOMES, LLC | BLA | C | 01/16/2014 | | CHRISM | CHRISM | | BLA | C | 4673224 | LANG LOG HOMES, LLC | BSP | P | 01/14/2014 | front porch roof and deck framing ok | CHRISM | CHRISM | | BSP | P | 4671599 | LANG LOG HOMES, LLC | BLA | R | 01/14/2014 | extend electric boxes to face of stucco | CHRISM | CHRISM | | BLA | R | 4671594 | LANG LOG HOMES, LLC | BFT | C | 12/02/2013 | deck piers ok | CHRISM | CHRISM | | BFT | C | 4650136 | LANG LOG HOMES, LLC | BFD | C | 10/14/2013 | drain usable isolate and float | CHRISM | CHRISM | | BFD | C | 4621978 | LANG LOG HOMES, LLC | BFN | C | 10/02/2013 | need clean copy of design and soils at drain | CHRISM | CHRISM | | BFN | C | 4615013 | LANG LOG HOMES, LLC | BFT | R | 09/27/2013 | need open hole observation / forms and rebar ok | BOBF | BOBF | | BFT | R | 4612310 | WOODLAND ELECTRIC, LLC | E= | C | 06/12/2014 | | MATTHEW | MATTHEW | | E= | C | 4757026 | WOODLAND ELECTRIC, LLC | E= | R | 06/10/2014 | went over corrections with contractor-------- still need all corrections from previous inspection | MATTHEW | MATTHEW | | E= | R | 4754892 | WOODLAND ELECTRIC, LLC | ES | C | 06/05/2014 | Residential Underground: 200 amp 3/w: new res------- meter is set; need seal | MATTHEW | MATTHEW | | ES | C | 4752506 | WOODLAND ELECTRIC, LLC | E= | R | 06/05/2014 | #8nm on 60 amp breaker in panel and 70 amp breaker at genset, inter-system bonding needs to comply with 250.94 nec, still need protection for nm in mech room and unfinished area of loft, can't have gfci outlet not readily accessible location for x-mas outlets and outlet needs to be wr, gfci protect all outlets within 6' of laundry sink (they have to be readily accessible; not behind dryer, need gfci protection for double duplex in mech room-------------need electrician on site for next inspection to open genset----------- complete re-inspect | MATTHEW | MATTHEW | | E= | R | 4752505 | WOODLAND ELECTRIC, LLC | E= | R | 06/03/2014 | gfci protect: OH door outlet (needs to be readily accessible), gfci mech room outlets and 6' from laundry sink, label furnace breakers to match furnaces, breakers 25 and 26 not labeled (where' laundry breaker?), protect nm in all unfinished loft areas and in mech room, afci protect outlets in finished storage area of basement, , need j-box cover for well, breakfast nook outlet not working, front in-use cover upside down and other in-use covers missing face plates, install inter-system bond terminal, #8nm to transfer switch and generator on 60 amp breaker? need generator opened for inspection, need all labeling required for pv systems and multiple sources of power installed, provide means to check x-mas outlets--------------------------no underground inspection; need to pothole (call me in the am)----------------- complete re-inspect-------------- | MATTHEW | MATTHEW | | E= | R | 4750069 | WOODLAND ELECTRIC, LLC | ES | R | 06/03/2014 | need pv inspection called in: where does pv tie into system----------------- need contractor and plans on site for next inspection | MATTHEW | MATTHEW | | ES | R | 4750053 | WOODLAND ELECTRIC, LLC | ER | C | 02/07/2014 | finished basement, whips for kitchen countertop, no mcc's | MATTHEW | MATTHEW | | ER | C | 4684419 | WOODLAND ELECTRIC, LLC | ER | R | 02/06/2014 | not ready | CRAIG | CRAIG | | ER | R | 4683979 | RICHARD DEEM | H= | C | 06/04/2014 | | JEFFL | JEFFL | | H= | C | 4751148 | RICHARD DEEM | H= | P | 05/22/2014 | Final gas connection not complete at outdoor generator. Rest ok. | JEFFL | JEFFL | | H= | P | 4744006 | DAVIS GAS SHOP INC | HC | C | 02/20/2014 | RELEASE METER, need letter for 2lb system | TED | TED | | HC | C | 4690081 | DAVIS GAS SHOP INC | HO | C | 02/20/2014 | 10lb test on 2'' pe from house to meter | TED | TED | | HO | C | 4690076 | RICHARD DEEM | HC | P | 01/30/2014 | Need HO completed. | MICHAELS | MICHAELS | | HC | P | 4680792 | RICHARD DEEM | HRR | C | 01/30/2014 | Rough ok. Note: FB, no osa, no a/c, direct vent furnace x2. | MICHAELS | MICHAELS | | HRR | C | 4680789 | DAVIS GAS SHOP INC | HI | C | 01/17/2014 | 10# test ok. 2lb. 1 1/4" csst main to 2-furn, range, bbq, dryer, garage htr., generator. No w/h. BY FINAL: need 2lb. letter from BHE. | MICHAELS | MICHAELS | | HI | C | 4673971 | DMB PLUMBING SERVICES INC. | P= | C | 06/02/2014 | certificate of potable water to scanning | TED | TED | | P= | C | 4748894 | DMB PLUMBING SERVICES INC. | P= | P | 05/22/2014 | need certificate of potable water, note: finished basement, no sprinkler stub | TED | TED | | P= | P | 4743975 | DMB PLUMBING SERVICES INC. | PTO | C | 01/15/2014 | finished basement, no hot water heater | JOEL | JOEL | | PTO | C | 4672360 | DMB PLUMBING SERVICES INC. | PB | C | 10/08/2013 | HDPE STUBBED IN THRU WALL SLEEVE | LEE | LEE | | PB | C | 4618555 |
|
|