PEACEMAKER BUILDERS INC | B= | C | 09/05/2014 | | JOND | JOND | | B= | C | 4810871 |
PEACEMAKER BUILDERS INC | B= | P | 08/28/2014 | need 5" house numbers on the house -- Schedule a new Building Final when above items are complete. / finished basement | JOND | JOND | | B= | P | 4805789 |
PEACEMAKER BUILDERS INC | BIN | C | 08/28/2014 | | JOND | JOND | | BIN | C | 4805788 |
PEACEMAKER BUILDERS INC | BFR | C | 08/28/2014 | | JOND | JOND | | BFR | C | 4805787 |
PEACEMAKER BUILDERS INC | BIN | P | 01/30/2014 | insulation ok, just need frame signed off | JOND | JOND | | BIN | P | 4680581 |
PEACEMAKER BUILDERS INC | BLA | C | 01/27/2014 | | JOND | JOND | | BLA | C | 4678197 |
PEACEMAKER BUILDERS INC | BFR | P | 01/22/2014 | firestop / still need 3" post at top of stairs / need HRR signed off / ok to insulate | JOND | JOND | | BFR | P | 4676132 |
PEACEMAKER BUILDERS INC | BSP | T | 01/22/2014 | PAID (REC#1176033) PLAN SPLICE FEE: $50 by: DANM for Construction: Structural revisions | DANM | DANM | | BSP | T | 4675593 |
PEACEMAKER BUILDERS INC | BFR | R | 01/21/2014 | NEED ALL OTHER ROUGHS SIGNED OFF / brace off ends of laterals / need header detail above slider door upstairs / plans call for 3" t-post by stairs upstairs / firestop throughout / cut C3E truss above fireplace / broken C5 truss / A1 trusses not connected in garage / stair landing not framed per plan by front window / need to know what kind of roof material is being used to make sure your using a class A rating | JOND | JOND | | BFR | R | 4675170 |
PEACEMAKER BUILDERS INC | BSP | P | 01/03/2014 | front and side porches ok | JOND | JOND | | BSP | P | 4666393 |
PEACEMAKER BUILDERS INC | BSP | R | 12/26/2013 | need approved set of plans on site | JOND | JOND | | BSP | R | 4662849 |
PEACEMAKER BUILDERS INC | BSP | P | 10/24/2013 | 2nd story rebar ok | JOND | JOND | | BSP | P | 4629157 |
PEACEMAKER BUILDERS INC | BIN | P | 10/23/2013 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 4627457 |
PEACEMAKER BUILDERS INC | BSP | R | 10/11/2013 | rear deck footers- all 5 are min 30 inches deep (most are 48 inches deep) but are only 12 inches in diameter, where plans call for 18 inch diameter | BLAKE | BLAKE | | BSP | R | 4621083 |
PEACEMAKER BUILDERS INC | BSP | P | 10/10/2013 | main level rebar ok | JOND | JOND | | BSP | P | 4620252 |
PEACEMAKER BUILDERS INC | BFD | C | 09/23/2013 | | JOND | JOND | | BFD | C | 4608668 |
PEACEMAKER BUILDERS INC | BFI | C | 09/23/2013 | | JOND | JOND | | BFI | C | 4608665 |
PEACEMAKER BUILDERS INC | BFN | C | 09/06/2013 | design and soils on file / drain usable area / ufer rod in | JOND | JOND | | BFN | C | 4599762 |
PEACEMAKER BUILDERS INC | BFT | C | 08/14/2013 | no interior pads at this time | JOND | JOND | | BFT | C | 4585048 |
ANJ ELECTRIC LLC | E= | C | 07/11/2014 | 1-20 1-30 AMP A.C | MIKEC | MIKEC | | E= | C | 4775453 |
ANJ ELECTRIC LLC | ES | C | 04/02/2014 | Residential Underground: NEW 200 AMP SERVICE | MIKEC | MIKEC | | ES | C | 4713246 |
ANJ ELECTRIC LLC | ER | C | 01/21/2014 | | MIKEC | MIKEC | | ER | C | 4675359 |
CORNERSTONE PLUMBING INC | H= | C | 05/20/2014 | OK | KEITHW | KEITHW | | H= | C | 4742562 |
CORNERSTONE PLUMBING INC | HC | C | 05/20/2014 | RELEASE METER | KEITHW | KEITHW | | HC | C | 4742517 |
CORNERSTONE PLUMBING INC | HI+ | C | 05/20/2014 | 10 PSI TEST OK FOR METER RELOCATION | KEITHW | KEITHW | | HI+ | C | 4742516 |
COLORADO GAS SYSTEMS | HO | C | 05/06/2014 | NOTES:ALL ISSUES RESOLVED METER MOVE WILL NEED PRESSURE TEST | KEITHW | KEITHW | | HO | C | 4733765 |
COLORADO GAS SYSTEMS | HO | R | 04/25/2014 | need 18'' of cover over p.e. piping, p.e. 90 above ground and piping under 18'' of cover, black iron fitting need to 4'' above grade, if meter is going to be mover will need inside piping reinspected, if not move new under ground to meter | TED | TED | | HO | R | 4727527 |
ROGERS HEATING AND COOLING INC | HC | C | 01/24/2014 | RELEASE METER | JACK | JACK | | HC | C | 4677286 |
ROGERS HEATING AND COOLING INC | HRR | C | 01/24/2014 | | JACK | JACK | | HRR | C | 4677272 |
ROGERS HEATING AND COOLING INC | HRR | P | 01/22/2014 | Need exhaust fan in master bath toilet room, rest ok, duct design good. Fireplaces good. | JACK | JACK | | HRR | P | 4676163 |
CORNERSTONE PLUMBING INC | HI | C | 01/21/2014 | No permit card in sight, 2-Furnaces, water heater, and 3 fireplaces | JACK | JACK | | HI | C | 4675149 |
ROGERS HEATING AND COOLING INC | HRR | T | 01/21/2014 | PAID (REC#1176013): No permit in sight, No duct design plans at furnace, Instructions inside fireplace unable to access I don't take equipment apart. | JACK | JACK | | HRR | T | 4675099 |
CORNERSTONE PLUMBING INC | HI | R | 01/17/2014 | LOST TEST NEED TO SECURE LOWER FIREPLACE CSST GAS LINE | KEITHW | KEITHW | | HI | R | 4673768 |
ROGERS HEATING AND COOLING INC | HRR | T | 12/23/2013 | PAID (REC#1175519): NOT READY. NO APPROVED PLANS OR DUCT DESIGN INFORMATION, FIREPLACES NOT INSTALLED. RETURN AIR BAYS NOT SEALED. VENT CLEARANCE ISSUES WITH FIREPLACE THAT IS INSTALLED. NO NAIL PROTECTION ON PVC VENTING. BATH FANS NOT INSTALLED. STOPPED INSPECTION. ENSURE ALL INSTRUCTIONS FOR ALL APPLIANCES ON SITE. RE INSPECT ALL. | JON | JON | | HRR | T | 4661955 |
CORNERSTONE PLUMBING INC | P= | C | 08/26/2014 | finished basement, rp back flow installed. | DICK | DICK | | P= | C | 4804197 |
CORNERSTONE PLUMBING INC | PTO | C | 01/17/2014 | ANCHOR CLOSET FLANGES PLEASE | LEE | LEE | | PTO | C | 4674147 |
CORNERSTONE PLUMBING INC | PB+ | C | 11/05/2013 | added h2o under slab | TIM | TIM | | PB+ | C | 4636217 |
CORNERSTONE PLUMBING INC | PB | C | 10/15/2013 | NO WATER SERVICE / WALL SLEEVE AT THIS TIME | LEE | LEE | | PB | C | 4623086 |