J. E. DUNN CONSTRUCTION COMPANY | B= | C | 10/08/2014 | | BERTW | BERTW | | B= | C | 4830565 |
HEATING & PLUMBING ENGINEERS, INC | BSP | T | 09/02/2014 | PAID (REC#1217310) PLAN SPLICE FEE: $50 by: DALEH for Mechanical | DALEH | DALEH | | BSP | T | 4808113 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 09/02/2014 | PLAN SPLICE: (No Fee) by: DOUG for Electrical | DOUG | DOUG | | BSP | P | 4808063 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | T | 09/02/2014 | PAID (REC#1217311) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: removed scope from 4th floor | SHELLEY | SHELLEY | | BSP | T | 4808044 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 06/27/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), HEATING & PLUMBING ENGRS, INC Mechanical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Plumbing Final Inspection is not Completed yet. 5th floor ok -- Schedule a new Building Final when above items are complete. | BERTW | BERTW | | B= | P | 4766794 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | C | 06/16/2014 | | BERTW | BERTW | | BFR | C | 4758416 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 06/16/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), FOSTER ELECTRIC CORP Electrical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Mechanical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Plumbing Final Inspection is not Completed yet. 8th floor ok -- Schedule a new Building Final when above items are complete. | BERTW | BERTW | | B= | P | 4758413 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 06/11/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), FOSTER ELECTRIC CORP Electrical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Mechanical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Plumbing Final Inspection is not Completed yet. Floors 8 & 9 finaled / All penetrations above ceiling at elevator lobbies on 8 & 9 good -- Schedule a new Building Final when above items are complete. | JEREMYA | JEREMYA | | B= | P | 4756157 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 04/23/2014 | elevator lobby 9th,8th,7th,5th penetration firecaulked ok | BERTW | BERTW | | BSP | P | 4725424 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | R | 04/22/2014 | firecaulking not completed at elevator lobbies | BERTW | BERTW | | BSP | R | 4724534 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 04/11/2014 | all framing is completed pending other roughs completed/need firecaulking inspection at all elevator lobbies | BERTW | BERTW | | BFR | P | 4718694 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 04/01/2014 | 5th floor elevator lobby framing ok/7th and 8th interior framing ok pending other roughs completed/still need elevator lobby framing inspected | BERTW | BERTW | | BFR | P | 4712469 |
J. E. DUNN CONSTRUCTION COMPANY | BIN | C | 03/26/2014 | | BERTW | BERTW | | BIN | C | 4708941 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 03/26/2014 | 5th floor interior non bearing ok pending other roughs completed | BERTW | BERTW | | BFR | P | 4708935 |
HEATING & PLUMBING ENGINEERS, INC | BSP | T | 03/13/2014 | PAID (REC#1185493): ADDITIONAL PLAN REVIEW TIME: $50 From: DALEH splice to add new ventilation duct to new room | DALEH | DALEH | | BSP | T | 4701780 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | T | 03/05/2014 | PAID (REC#1185504) PLAN SPLICE FEE: $50 by: MICHAEL for Construction: 15 minutes | MICHAELA | MICHAELA | | BSP | T | 4697024 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 02/13/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), FOSTER ELECTRIC CORP Electrical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Mechanical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Plumbing Final Inspection is not Completed yet. 1st and 2nd floors ok pending reinspection for elevator lobby door hardware and accessible restroom undersink knee protection and 27" knee space to apron -- Schedule a new Building Final when above items are complete. | BERTW | BERTW | | B= | P | 4686794 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/21/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), FOSTER ELECTRIC CORP Electrical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Mechanical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Plumbing Final Inspection is not Completed yet. 4th floor ok/pending other finals completed -- Schedule a new Building Final when above items are complete. | BERTW | BERTW | | B= | P | 4674547 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | T | 01/16/2014 | PAID (REC#1175758) PLAN SPLICE FEE: $50 by: MICHAEL for Construction: Add windows | MICHAELA | MICHAELA | | BSP | T | 4672843 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 01/03/2014 | chiller lines firecaulked through rated floors 1 and 2 ok | BERTW | BERTW | | BSP | P | 4666114 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 12/26/2013 | 2nd and 4th floor elevator lobbies penetrations firecaulked ok | BERTW | BERTW | | BSP | P | 4662917 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | T | 12/13/2013 | PAID (REC#1172189) PLAN SPLICE FEE: $50 by: MICHAEL for Construction: Revise layout | MICHAELA | MICHAELA | | BSP | T | 4656328 |
FOSTER ELECTRIC CORPORATION | BSP | T | 12/12/2013 | PAID (REC#1171747): PLAN SPLICE FEE: $50 by: DOUG for Electrical | DOUG | DOUG | | BSP | T | 4655525 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 12/05/2013 | elevator lobby new doors at fire partitions 2nd and 4th floors ok/2 layers of type-x sheetrock on corridor side ok/need firecaulking inspection on through penetrations of lobby walls | BERTW | BERTW | | BFR | P | 4653214 |
J. E. DUNN CONSTRUCTION COMPANY | BIN | P | 12/05/2013 | sound walls no inspection required | BERTW | BERTW | | BIN | P | 4653213 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 11/01/2013 | training with inspector Anderson | BERTW | BERTW | | BSP | P | 4634028 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 11/01/2013 | Type 1A building and 2hr firewall training with BW | JEREMYA | JEREMYA | | BSP | P | 4634006 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 10/31/2013 | Mark is job super/job is under the IEBC code/1st-2nd-4th floor phase #1 light gauge framing non-rated walls only ok/reviewed 1hr-2hr fire barriers,elevator lobbies 2hr fire partitions,all H and 2B wall types have ducts,pipes,conduits,electric boxes penetrating items/duct design not matching field conditions,mech engineer review of ducts through penetrations in rated walls per job super will be revised,need mech inspections | BERTW | BERTW | | BFR | P | 4633186 |
FOSTER ELECTRIC CORPORATION | E= | C | 06/23/2014 | | BRET | BRET | | E= | C | 4763530 |
FOSTER ELECTRIC CORPORATION | E= | C | 06/23/2014 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 4763526 |
FOSTER ELECTRIC CORPORATION | E= | P | 06/20/2014 | reverse polarity bath gfci, need color code labels all new panels, remove metal shavings in 5th floor panel, cannot open 6th floor panel cover with out shutting off the disconnect, call fire final with electrical final. | BRET | BRET | | E= | P | 4762287 |
FOSTER ELECTRIC CORPORATION | E= | P | 06/12/2014 | 7th floor ok NOTE; CHECK 7 TH FLOOR PANELS ON 5 TH FLOOR FINAL | BRET | BRET | | E= | P | 4756986 |
FOSTER ELECTRIC CORPORATION | E= | P | 06/05/2014 | 8th floor ok | BRET | BRET | | E= | P | 4752386 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/30/2014 | above ceilings rooms file, copy,IDF,corridor -OK | CRAIGS | CRAIGS | | ER | P | 4748467 |
FOSTER ELECTRIC CORPORATION | ER | C | 05/30/2014 | FIRE ALARM INSPECTION: 5th floor OK | CRAIGS | CRAIGS | | ER | C | 4748466 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/28/2014 | FIRE ALARM INSPECTION: 7th floor complete | BRET | BRET | | ER | P | 4746459 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/28/2014 | 7th floor ceiling complete | BRET | BRET | | ER | P | 4746458 |
FOSTER ELECTRIC CORPORATION | E= | P | 05/28/2014 | 9th floor | BRET | BRET | | E= | P | 4746457 |
FOSTER ELECTRIC CORPORATION | EP | P | 05/28/2014 | 9th floor panels | BRET | BRET | | EP | P | 4746456 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/23/2014 | ceilings 8th floor | BRIAN | BRIAN | | ER | P | 4744664 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/23/2014 | FIRE ALARM INSPECTION: fire alarm 8th floor | BRIAN | BRIAN | | ER | P | 4744660 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/21/2014 | 9th floor ceiling ok | BRET | BRET | | ER | P | 4742667 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/19/2014 | 7th copy and file room secure fixtures in break room, 5th floor perimeter except partition locations | BRET | BRET | | ER | P | 4740891 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/15/2014 | CEILINGS ON 5TH FLOOR --SEE PLANS----STILL NEED TO SEE FURNITURE CONNECTIONS------ | BRIAN | BRIAN | | ER | P | 4739189 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/15/2014 | FIRE ALARM INSPECTION: 5TH FLOOR SEE APPROVED DRAWINGS----CEILINGS | BRIAN | BRIAN | | ER | P | 4739151 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/12/2014 | FIRE ALARM INSPECTION: 7 th floor | BRET | BRET | | ER | P | 4736644 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/12/2014 | 7th floor ceilings except file break corridor and 12' east west 6' north and south. | BRET | BRET | | ER | P | 4736640 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/07/2014 | FIRE ALARM INSPECTION: 8th floor ok | BRET | BRET | | ER | P | 4734118 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/07/2014 | 8th floor ceilings leave tiles out 12' from exterior walls east and west and 6' from exterior wall north and south. bathroom corridor not ready | BRET | BRET | | ER | P | 4734116 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/30/2014 | FIRE ALARM INSPECTION: f.a same area as electrical rough | BRET | BRET | | ER | P | 4729836 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/30/2014 | FIRE ALARM INSPECTION: 9th floor ceilings except elevator corridor idf room | BRET | BRET | | ER | P | 4729833 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/25/2014 | FIRE ALARM INSPECTION: 6th floor bathrooms | BRET | BRET | | ER | P | 4727610 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/25/2014 | 6th floor bathrooms walls and hard lid | BRET | BRET | | ER | P | 4727598 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/23/2014 | ELEVATOR LOBBY 8 &.9 TH FLOORS | BRIAN | BRIAN | | ER | P | 4725876 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/21/2014 | ELEVATOR LOBBY 5TH AND 7TH FLOORS | BRIAN | BRIAN | | ER | P | 4724165 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/15/2014 | conference room soffit | BRET | BRET | | ER | P | 4720272 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/11/2014 | WALLS SEE DRAWINGS | BRIAN | BRIAN | | ER | P | 4718743 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/07/2014 | 9th floor restrooms, note remove old fire alarm wiring above mirror west restroom. | BRET | BRET | | ER | P | 4715500 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/04/2014 | 8th floor walls | BRET | BRET | | ER | P | 4714612 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/02/2014 | 8th floor bathrooms | BRET | BRET | | ER | P | 4713738 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/01/2014 | 7th floor walls complete | BRET | BRET | | ER | P | 4712203 |
FOSTER ELECTRIC CORPORATION | ER | P | 03/31/2014 | 7th floor restroom walls and lid | BRET | BRET | | ER | P | 4711410 |
FOSTER ELECTRIC CORPORATION | ER | P | 03/27/2014 | 5th and 11th floor bathrooms wall and lid | BRET | BRET | | ER | P | 4709746 |
FOSTER ELECTRIC CORPORATION | ER | P | 03/25/2014 | 5th floor walls ok | BRET | BRET | | ER | P | 4707906 |
FOSTER ELECTRIC CORPORATION | E= | P | 02/18/2014 | 2nd floor complete | BRET | BRET | | E= | P | 4688240 |
FOSTER ELECTRIC CORPORATION | E= | P | 02/13/2014 | 2nd floor except handle ties and dead receptacle hallway | BRET | BRET | | E= | P | 4686424 |
FOSTER ELECTRIC CORPORATION | E= | P | 02/12/2014 | first floor ok add light to electric room, label sub panels with power source. | TOMC | TOMC | | E= | P | 4686187 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/31/2014 | 2nd floor ceilings except glass partition n.e area | BRET | BRET | | ER | P | 4681322 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/31/2014 | FIRE ALARM INSPECTION: 2nd floor ceiling except glass partitions n.e area | BRET | BRET | | ER | P | 4681303 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/27/2014 | FIRE ALARM INSPECTION: 2nd floor f.a complete | BRET | BRET | | ER | P | 4678372 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/27/2014 | 2nd floor see plans for location. | BRET | BRET | | ER | P | 4678371 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/22/2014 | FIRE ALARM INSPECTION: 1st floor f.a rough complete | BRET | BRET | | ER | P | 4675897 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/22/2014 | 1st floor rough complete | BRET | BRET | | ER | P | 4675895 |
FOSTER ELECTRIC CORPORATION | E= | P | 01/21/2014 | FIRE ALARM INSPECTION: 4th floor | BRET | BRET | | E= | P | 4674727 |
FOSTER ELECTRIC CORPORATION | E= | P | 01/21/2014 | 4 th floor ok | BRET | BRET | | E= | P | 4674704 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/17/2014 | 2nd floor ceilings see plans | BRET | BRET | | ER | P | 4673838 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/17/2014 | FIRE ALARM INSPECTION: 2nd floor see plans same areas as electrical rough | BRET | BRET | | ER | P | 4673837 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/15/2014 | 1st floor except security lobby, 4th floor ceiling complete | BRET | BRET | | ER | P | 4672130 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/15/2014 | FIRE ALARM INSPECTION: 1st floor ok | BRET | BRET | | ER | P | 4672129 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/09/2014 | CEILING ROOM 115 | BRIAN | BRIAN | | ER | P | 4668714 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/09/2014 | FIRE ALARM INSPECTION: ceilings room 115--FIRE ALARM | BRIAN | BRIAN | | ER | P | 4668713 |
FOSTER ELECTRIC CORPORATION | ER | P | 12/31/2013 | Second floor drop ceilings, marked and dated on plans | JOSEPH | JOSEPH | | ER | P | 4664634 |
FOSTER ELECTRIC CORPORATION | ER | P | 12/31/2013 | FIRE ALARM INSPECTION: Second floor above ceilings, marked and dated on plans | JOSEPH | JOSEPH | | ER | P | 4664633 |
FOSTER ELECTRIC CORPORATION | ER | P | 12/20/2013 | 2nd and 4th floor ceilings see plans | BRET | BRET | | ER | P | 4660875 |
FOSTER ELECTRIC CORPORATION | ER | P | 12/20/2013 | FIRE ALARM INSPECTION: 2nd and 4th floor ceiling see plans | BRET | BRET | | ER | P | 4660873 |
FOSTER ELECTRIC CORPORATION | ER | R | 12/19/2013 | electrical ok but low volt cables on ceiling grid do not drop tile. | BRET | BRET | | ER | R | 4659935 |
FOSTER ELECTRIC CORPORATION | ER | P | 12/19/2013 | FIRE ALARM INSPECTION: north east area of 2nd floor | BRET | BRET | | ER | P | 4659934 |
FOSTER ELECTRIC CORPORATION | ER | P | 12/11/2013 | 2nd and 4th floor elevator lobby ceilings 24x24 access required at f.a j-boxes | BRET | BRET | | ER | P | 4654832 |
FOSTER ELECTRIC CORPORATION | ER | P | 12/06/2013 | 4 th floor restrooms except ada not ready | BRET | BRET | | ER | P | 4653410 |
FOSTER ELECTRIC CORPORATION | ER | P | 12/05/2013 | 2nd floor center bathrooms walls and lid (3) | BRET | BRET | | ER | P | 4652928 |
FOSTER ELECTRIC CORPORATION | ER | P | 11/19/2013 | 1st floor coffee bar wall, 4th floor columns with floor box wiring. | BRET | BRET | | ER | P | 4644373 |
FOSTER ELECTRIC CORPORATION | ER | P | 11/05/2013 | coffee room 2nd floor | BRET | BRET | | ER | P | 4635832 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/30/2013 | walls 1st,2nd and 3rd floors see plans f.a stubs ok | BRET | BRET | | ER | P | 4632156 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/17/2013 | walls 415,416,417 f.a ok no plans yet | BRET | BRET | | ER | P | 4624219 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 09/30/2014 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 4825167 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 07/07/2014 | NEED REVISED TEST AND BALANCE REPORT OR LETTER FROM ENGINEER ADDRESSING ALL NOTES. | JERRYF | JERRYF | | H= | P | 4771330 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 06/11/2014 | PARTIAL PENDING TEST AND BALANCE REPORT - THE FOLLOWING FLOORS ARE COMPLETE PENDING TEST AND BALANCE REPORTS - 5TH - 6TH - 7TH - 8TH AND 9TH FLOORS | JERRYF | JERRYF | | H= | P | 4756000 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 04/28/2014 | (5TH AND 9TH FLOOR) -- FINALS OK FOR THESE LEVELS | ROBERTV | ROBERTV | | H= | P | 4728402 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/28/2014 | (5TH AND 9TH FLOOR) -- ABOVE CEILING OK | ROBERTV | ROBERTV | | HD | P | 4728394 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/17/2014 | (8TH AND 9TH FLOOR) -- FIRE DAMPER SHEETROCK AND RETAINAGE OK | ROBERTV | ROBERTV | | HD | P | 4722255 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/11/2014 | (8TH AND 9TH FLOOR) -- FIRE DAMPER FRAMING OK FOR SHEETROCK. (5TH AND 7TH FLOOR) SHEETROCK GAP AND RETAINING ANGLES ARE GOOD | ROBERTV | ROBERTV | | HD | P | 4719150 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/08/2014 | (5TH AND 7TH FLOOR) -- 4-FIRE DAMPER FRAMINGS OK FOR SHEETROCK. ENSURE ELECTRICIANS KEEP WIRING OUT AND AWAY FROM OPENINGS AND FRAMING | ROBERTV | ROBERTV | | HD | P | 4716562 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/04/2014 | PHASE II, FIFTH FLOOR. ROUGH DUCTS IN OPEN AREAS OK EXCEPT NO VAV 5-3 OR 5-10 INSTALLED YET. NO FLEX OR DIFFUSERS. ELEVATOR LOBBY: FRAMING FOR RETURN AIR FIRE DAMPER OK, OK TO INSTALL DAMPER AND ANGLES ON ONE SIDE.. PROPERLY FRAME SUPPLY DAMPER. SEVENTH FLOOR: PROPERLY FRAME SUPPLY AND RETURN AIR FIRE DAMPERS IN ELEVATOR LOBBY. HAVE CORRECT INSTALLATION INSTRUCTIONS ON SITE AT NEXT INSPECTION. | NANCY | NANCY | | HD | P | 4714601 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 03/25/2014 | (PHASE II) -- (5TH FLOOR) -- OK TO WRAP, ABOVE BATHROOM HARDLIDS OK. NEED ELEVATOR LOBBY FIRE DAMPER FRAMING INSPECTIONS BEFORE ANY CONCEAL. (7TH FLOOR) -- ABOVE BATHROOM HARDLIDS ONLY OK. (11TH FLOOR) -- OK TO WRAP, ABOVE BATHROOM HARDLIDS OK, NEED ELEVATOR LOBBY FIRE DAMPER FRAMING INPSECTIONS BEFORE ANY CONCEAL. | ROBERTV | ROBERTV | | HD | P | 4708147 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 01/07/2014 | (1ST FLOOR) -- ABOVE CEILING OK FOR TILES PER MECH ONLY | ROBERTV | ROBERTV | | HD | P | 4667762 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 12/23/2013 | (2ND FLOOR)--OK FOR TILES PER MECH ONLY | ROBERTV | ROBERTV | | HD | P | 4662016 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 12/11/2013 | (2ND FLOOR)--DAMPER RETAINING ANGLES OK. (4TH FLOOR)--DAMPER RETAINING ANGLES OK | ROBERTV | ROBERTV | | HD | P | 4654901 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 12/10/2013 | (4TH FLOOR)--SHEETROCK GAPS OK FOR RETAINAGE ON DAMPERS. (2ND FLOOR) -- SHEETROCK GAPS OK FOR RETAINAGE ON DAMPERS. | ROBERTV | ROBERTV | | HD | P | 4654337 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 12/06/2013 | (2ND FLOOR)--NORTH WEST FIRE DAMPER FRAMING AT ELEVATOR LOBBY OK FOR SHEETROCK | ROBERTV | ROBERTV | | HD | P | 4653534 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 12/05/2013 | (2ND FLOOR)-- OK FOR WRAP, FLEX'S AND DIFFUSERS.NORTH EAST LOBBY DAMPER FRAMING OK AFTER CORNERS ARE FIRECAULKED. NORTH EAST LOBBY DAMPER NEEDS REFRAMED COMPLETELY. DAMPERS NEED CEILING AND DUCT ACCESS BY FINAL. NEED TO HAVE ENGINEER SPLICE AS-BUILT INSTALLATIONS BY FINAL. (4TH FLOOR)--FLEX'S AND DIFFUSERS OK FOR TILES EXCEPT AREA WITH DAMPERS. SOUTH LOBBY DAMPER NEED TOP FRAMING TRAC COMPLETED, REST OF FRAMING OK. NORTH LOBBY FIRE DAMPER FRAMING OK PENDING CORNERS BEING FIRECAULKED. | ROBERTV | ROBERTV | | HD | P | 4653165 |
HEATING & PLUMBING ENGINEERS, INC | HWP | C | 11/25/2013 | THIS SCOPE OF WORK DOES NOT NEED ANY HWP INSPECTIONS, ALL PIPING AND CONNECTIONS ARE ABOVE GRID CEILING AND ONLY SPAN A SMALL AREA FOR RELOCATION OF COILS. | ROBERTV | ROBERTV | | HWP | C | 4647719 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 11/18/2013 | (PHASE 1)-- 1ST AND 4TH FLOOR OK TO WRAP, NEED FIRE DAMPER FRAMING INSPECTION AT ELEVATOR LOBBY WALLS, WILL NEED ALL FIELD CHANGES TO REFLECT ON APPROVED SPLICE BY FINAL | ROBERTV | ROBERTV | | HD | P | 4643837 |
HEATING & PLUMBING ENGINEERS, INC | HD | L | 11/15/2013 | CANCELLED PER CALL AHEAD, RESCHEDULED FOR 11-18 | ROBERTV | ROBERTV | | HD | L | 4643024 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 09/04/2014 | | JOEL | JOEL | | P= | C | 4809290 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 06/11/2014 | revise plan to show deleted ada restroom on 4th floor and deleted d.f on 2nd and 6th floors | JOEL | JOEL | | P= | P | 4756205 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 04/11/2014 | OK FOR DRY WALL | GABE | GABE | | PTO | P | 4719457 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 04/07/2014 | pto 7 and 8 complete | TIM | TIM | | PTO | P | 4715277 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/27/2014 | 5TH FLOOR BREAK SINK AND A.D.A. RESTROOM WALLS ONLY -- STILL NEED UNDER-FLOOR / REVISIONS | LEE | LEE | | PTO | P | 4709632 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 10/28/2013 | REVISE PLANS, ALL O.K LESS 1-ADA RESTROOM AND D.F | JOEL | JOEL | | PTO | P | 4630643 |