WALLACE CONSTRUCTION SERVICES INC | B= | C | 06/19/2014 | All other required Final inspections are complete. (This is a computer generated result) | CHRISM | CHRISM | | B= | C | 4761779 |
WALLACE CONSTRUCTION SERVICES INC | B= | P | 06/18/2014 | Additional Inspections Required: External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | CHRISM | CHRISM | | B= | P | 4760782 |
WALLACE CONSTRUCTION SERVICES INC | B= | P | 06/11/2014 | Additional Inspections Required: External Agency Inspection HD= by HEALTHDEPT is not Completed yet, Plumbing Final Inspection is not Completed yet. | CHRISM | CHRISM | | B= | P | 4755870 |
WALLACE CONSTRUCTION SERVICES INC | BSP | P | 05/28/2014 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical | DALEH | DALEH | | BSP | P | 4746279 |
WALLACE CONSTRUCTION SERVICES INC | BSP | P | 05/02/2014 | two piers for landing ok | CHRISM | CHRISM | | BSP | P | 4731689 |
WALLACE CONSTRUCTION SERVICES INC | BSP | T | 04/17/2014 | PAID (REC#1189819) PLAN SPLICE FEE: $50 by: MICHAEL for Construction: Add stairs to deck | MICHAELA | MICHAELA | | BSP | T | 4722304 |
WALLACE CONSTRUCTION SERVICES INC | BSP | P | 03/26/2014 | met with Dave about installation of non-combustible framing and mantle at fireplace | CHRISM | CHRISM | | BSP | P | 4708931 |
WALLACE CONSTRUCTION SERVICES INC | BFR | C | 03/07/2014 | | CHRISM | CHRISM | | BFR | C | 4698872 |
WALLACE CONSTRUCTION SERVICES INC | BLA | P | 02/28/2014 | extend electric boxes at garage popouts | CHRISM | CHRISM | | BLA | P | 4695008 |
WALLACE CONSTRUCTION SERVICES INC | BIN | P | 02/04/2014 | insulation ok, complete bfr | CHRISM | CHRISM | | BIN | P | 4682545 |
WALLACE CONSTRUCTION SERVICES INC | BFR | P | 01/28/2014 | ok to insulate, missing posts at front porch and deck cover | CHRISM | CHRISM | | BFR | P | 4678600 |
WALLACE CONSTRUCTION SERVICES INC | BIN | P | 01/28/2014 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 4678404 |
WALLACE CONSTRUCTION SERVICES INC | BFI | C | 10/21/2013 | R-10 at walkout walls | CHRISM | CHRISM | | BFI | C | 4626270 |
WALLACE CONSTRUCTION SERVICES INC | BFD | C | 10/21/2013 | | CHRISM | CHRISM | | BFD | C | 4626265 |
WALLACE CONSTRUCTION SERVICES INC | BFN | C | 10/16/2013 | design and soils on file drain usable isolate and float | CHRISM | CHRISM | | BFN | C | 4623734 |
WALLACE CONSTRUCTION SERVICES INC | BFT | C | 10/10/2013 | 1500# bearing pads ok | CHRISM | CHRISM | | BFT | C | 4620478 |
HAMILTON ELECTRIC, LLC | E= | C | 05/30/2014 | exterior lights on the sides of overhang not being installed | MATTHEW | MATTHEW | | E= | C | 4748855 |
HAMILTON ELECTRIC, LLC | E= | R | 05/23/2014 | install front entry lights, need working clearance at a/c, bond spa motor---------- 40 amp a/c | MATTHEW | MATTHEW | | E= | R | 4745009 |
HAMILTON ELECTRIC, LLC | ER+ | C | 01/30/2014 | TV CENTER IN BASEMENT OK | BRIAN | BRIAN | | ER+ | C | 4680925 |
HAMILTON ELECTRIC, LLC | ES | C | 01/28/2014 | Residential Underground: NEW 200 AMP SERVICE | MIKEC | MIKEC | | ES | C | 4678541 |
HAMILTON ELECTRIC, LLC | ER | C | 01/28/2014 | | MIKEC | MIKEC | | ER | C | 4678540 |
HAMILTON ELECTRIC, LLC | EP | C | 01/28/2014 | | MIKEC | MIKEC | | EP | C | 4678537 |
HAMILTON ELECTRIC, LLC | ES | R | 01/27/2014 | Service not ready no GEC's installed | JOSEPH | JOSEPH | | ES | R | 4678248 |
HAMILTON ELECTRIC, LLC | ER | R | 01/27/2014 | Cables run outside walls in basement bedroom. Cage non ic rated fixtures or let inspector know there will be no insulation in basement ceilings. Make up all grounds and neutrals in main panel.. Install cold water GEC and ufer. Recall with service | JOSEPH | JOSEPH | | ER | R | 4678247 |
HAMILTON ELECTRIC, LLC | EUG | C | 12/19/2013 | service lateral pole to house----------------------------- per contractor: main disconnect on pole will be removed--------------------------- check at time of final--------------------------------------------------- | MATTHEW | MATTHEW | | EUG | C | 4660478 |
BLACK FOREST HEATING | H= | C | 05/28/2014 | Correction made splice on 5/28. Ok. | MARK | MARK | | H= | C | 4746266 |
BLACK FOREST HEATING | H= | P | 05/23/2014 | Still missing docs. need to reschedule when ready. Note:need to verify equip to docs and note c/a. | MARK | MARK | | H= | P | 4744802 |
BLACK FOREST HEATING | H= | P | 05/02/2014 | Unable to locate documentation mentioned at rough. Rest ok. UB mech rm for w/h c/a. | MARK | MARK | | H= | P | 4731772 |
BLACK FOREST HEATING | HC | C | 02/07/2014 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 4684072 |
BLACK FOREST HEATING | HRR | C | 02/07/2014 | VENT CORRECTED STILL NEED PERFORMANCE REPORT AND EQUIP TO MATCH AT FINAL | DAVIDH | DAVIDH | | HRR | C | 4684071 |
CORNERSTONE PLUMBING INC | HI | C | 01/24/2014 | 10 LB TEST OK NOTE 1 1/4" LINE 1 FURN, 1 RANGE,1 W/H, 1 DRYER | DAVIDH | DAVIDH | | HI | C | 4677481 |
BLACK FOREST HEATING | HRR | P | 01/17/2014 | 1/ 24/14 CHANGED STATUS TO PARTIAL WHILE DOING GAS FOUND FURN VENT PIPING NOW CUT OUT AND NOT CONNED. NEEDS RE-INSPECTED, CONTRACTOR IS GOING TO BE PRE FORMING PERFORMANCE TEST BY FINAL ALSO EQUIP DOES NOT MATCH CORRECT BY FINAL | DAVIDH | DAVIDH | | HRR | P | 4673780 |
CORNERSTONE PLUMBING INC | P= | C | 06/03/2014 | NOTE : FINISHED BASEMENT . PVB INSTALLED . POTABLE WATER CERT TO SCANNING | GABE | GABE | | P= | C | 4750168 |
CORNERSTONE PLUMBING INC | PTO | C | 01/22/2014 | | JOEL | JOEL | | PTO | C | 4675977 |
CORNERSTONE PLUMBING INC | PTO | P | 01/21/2014 | low test dwv main bath, 2'' for master lavs lack grade in basement | JOEL | JOEL | | PTO | P | 4675226 |
HOMEOWNER | PWO | C | 11/19/2013 | | JOEL | JOEL | | PWO | C | 4644669 |
CORNERSTONE PLUMBING INC | PB | C | 10/25/2013 | | TED | TED | | PB | C | 4629720 |