GOEBEL CONSTRUCTION, INC | B= | C | 12/23/2013 | All other required Final inspections are complete. (This is a computer generated result) | CHRISM | CHRISM | | B= | C | 4661535 | GOEBEL CONSTRUCTION, INC | B= | P | 12/20/2013 | Additional Inspections Required: External Agency Inspection HD= by HEALTHDEPT is not Completed yet, Plumbing Final Inspection is not Completed yet. ok after P= | CHRISM | CHRISM | | B= | P | 4661010 | GOEBEL CONSTRUCTION, INC | BIN | C | 11/13/2013 | | CHRISM | CHRISM | | BIN | C | 4641111 | GOEBEL CONSTRUCTION, INC | BFR | C | 11/13/2013 | | CHRISM | CHRISM | | BFR | C | 4641103 | GOEBEL CONSTRUCTION, INC | BFR | R | 11/12/2013 | ok to insulate, interior nonbearing walls not floated, provide eng lettere | CHRISM | CHRISM | | BFR | R | 4639664 | GOEBEL CONSTRUCTION, INC | BLA | C | 11/12/2013 | | CHRISM | CHRISM | | BLA | C | 4639662 | GOEBEL CONSTRUCTION, INC | BSP | P | 11/04/2013 | porch and posts ok | CHRISM | CHRISM | | BSP | P | 4635091 | GOEBEL CONSTRUCTION, INC | BFI | C | 10/25/2013 | underslab insulation ok | CHRISM | CHRISM | | BFI | C | 4629496 | GOEBEL CONSTRUCTION, INC | BSP | P | 10/25/2013 | front porch piers ok | CHRISM | CHRISM | | BSP | P | 4629490 | GOEBEL CONSTRUCTION, INC | BFD | C | 10/18/2013 | open hole on file, drain usable | CHRISM | CHRISM | | BFD | C | 4625517 | GOEBEL CONSTRUCTION, INC | BFN | C | 10/15/2013 | design and soils on file need stamped open hole at drain | CHRISM | CHRISM | | BFN | C | 4622756 | GOEBEL CONSTRUCTION, INC | BFT | C | 10/10/2013 | 1500 # bearing | CHRISM | CHRISM | | BFT | C | 4620509 | SANCHEZ ELECTRIC, INC. | E= | C | 12/18/2013 | | MATTHEW | MATTHEW | | E= | C | 4659468 | SANCHEZ ELECTRIC, INC. | E= | R | 12/17/2013 | NEED INTER SYSTEM BOND----SEAL NIPPLE INTO PANEL--- | BRIAN | BRIAN | | E= | R | 4658434 | SANCHEZ ELECTRIC, INC. | ES | C | 12/17/2013 | Residential Underground: 200 AMP 3-W NEW RES ----NEED TO RE-SEAL METER | BRIAN | BRIAN | | ES | C | 4658433 | SANCHEZ ELECTRIC, INC. | ER | C | 11/08/2013 | | MATTHEW | MATTHEW | | ER | C | 4638754 | SANCHEZ ELECTRIC, INC. | EUG | C | 10/28/2013 | from meter to house | BRIAN | BRIAN | | EUG | C | 4630754 | A & Z MECHANICAL, INC. | H= | C | 12/16/2013 | OK NOTE DIRECT VENT HEAT | DAVIDH | DAVIDH | | H= | C | 4657460 | AMERICAN PRIDE PLUMBING | HC | C | 11/08/2013 | RELEASE METER | TED | TED | | HC | C | 4638307 | AMERICAN PRIDE PLUMBING | HI | C | 11/08/2013 | 1 1/4'' boiler, fireplace, range, bbq | TED | TED | | HI | C | 4638306 | MICK HEATING & SHEET METAL CO. | HRR | C | 11/08/2013 | slab on grade, hot water heat, mini-split a/c, 3'' boiler vent installed (no boiler at this time), | TED | TED | | HRR | C | 4638303 | A & Z MECHANICAL, INC. | HWP | P | 10/25/2013 | 100 LB TEST OK NOTE OK TO POUR | DAVIDH | DAVIDH | | HWP | P | 4629498 | AMERICAN PRIDE PLUMBING | P= | C | 12/20/2013 | | TIM | TIM | | P= | C | 4661275 | AMERICAN PRIDE PLUMBING | P= | P | 12/19/2013 | need proof of potable water, need 1" air gap at main bath lav faucet | TIM | TIM | | P= | P | 4660505 | AMERICAN PRIDE PLUMBING | PTO | C | 11/07/2013 | | JOEL | JOEL | | PTO | C | 4637510 | AMERICAN PRIDE PLUMBING | PWO | C | 10/23/2013 | need certificate of potable water by final | TED | TED | | PWO | C | 4627748 | AMERICAN PRIDE PLUMBING | PB | C | 10/23/2013 | | TED | TED | | PB | C | 4627747 |
|
|