SUNSET DREAM HOMES, INC | B= | C | 06/05/2014 | | CHRISM | CHRISM | | B= | C | 4751758 |
SUNSET DREAM HOMES, INC | B= | P | 06/02/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet, External Agency Inspection HD= by HEALTHDEPT is not Completed yet. handrail at front steps, return basement handrail to wall, secure egress ladders, secure basement post tops, hangers missing at stair header -- Schedule a new Building Final when above items are complete. | CHRISM | CHRISM | | B= | P | 4749176 |
SUNSET RIDGE DREAM HOMES | BIN | P | 01/16/2014 | insulation ok pending inspections for gas fireplace | CHRISM | CHRISM | | BIN | P | 4673181 |
SUNSET RIDGE DREAM HOMES | BFR | P | 01/13/2014 | ok to insulate, fireplace not set at this time make sure not to cover area | CHRISM | CHRISM | | BFR | P | 4670699 |
SUNSET RIDGE DREAM HOMES | BFR | R | 01/10/2014 | ok to insulate, missing lateral T02, strongback and windbrace gables, roll block truss heals over 8", deck frame ok, fireplace not installed | CHRISM | CHRISM | | BFR | R | 4669799 |
SUNSET RIDGE DREAM HOMES | BLA | C | 12/20/2013 | | CHRISM | CHRISM | | BLA | C | 4661051 |
SUNSET RIDGE DREAM HOMES | BSP | P | 11/27/2013 | front porch roof and beam ok, no posts | CHRISM | CHRISM | | BSP | P | 4648872 |
SUNSET RIDGE DREAM HOMES | BFI | C | 10/28/2013 | R-10 at walkout walls ok | CHRISM | CHRISM | | BFI | C | 4630316 |
SUNSET RIDGE DREAM HOMES | BFD | C | 10/28/2013 | soils on file drain usable isolate and float | CHRISM | CHRISM | | BFD | C | 4630305 |
SUNSET RIDGE DREAM HOMES | BFN | C | 10/28/2013 | design and eng report on file | CHRISM | CHRISM | | BFN | C | 4630304 |
SUNSET RIDGE DREAM HOMES | BFT | C | 10/28/2013 | eng report on file | CHRISM | CHRISM | | BFT | C | 4630300 |
HOMEOWNER | E= | C | 05/13/2014 | no a/c | MATTHEW | MATTHEW | | E= | C | 4737828 |
HOMEOWNER | E= | R | 05/12/2014 | for closet light, need wiring removed (leave box open at light and switch), or light installed with correct clearance | MATTHEW | MATTHEW | | E= | R | 4736975 |
HOMEOWNER | E= | R | 05/05/2014 | install inter-system bond terminal, gfci outlets need to be tamper resistant, dish/ disposal circuit can't be on small appliance circuit, provide means to check OH door outlet, front hall lights need to be afci protected, gfci protect washer outlet (it can't be behind the washer), closet light too close to shelf, 40 amp max breaker to range, remove neutral from ground bar at well disconnect, strap flex at well disconnect, where is the ufer connection?---------------no a/c | MATTHEW | MATTHEW | | E= | R | 4732803 |
HOMEOWNER | ER | C | 01/08/2014 | | MATTHEW | MATTHEW | | ER | C | 4668467 |
HOMEOWNER | ER | R | 01/07/2014 | need to add floor box on west side of stairs--------need access to ufer on final---------notes--1/2 finished basement--1 6-3 AL to range | BRIAN | BRIAN | | ER | R | 4667490 |
HOMEOWNER | EUG | C | 12/20/2013 | service lateral from pole to home | MATTHEW | MATTHEW | | EUG | C | 4661329 |
HOMEOWNER | ES | C | 12/20/2013 | Residential Overhead: 200 amp 3/w: new res-------- meter is set---- need seal | MATTHEW | MATTHEW | | ES | C | 4661325 |
FRONT RANGE HEATING & COOLING | H= | C | 05/13/2014 | | GABE | GABE | | H= | C | 4737479 |
FRONT RANGE HEATING & COOLING | H= | P | 04/24/2014 | Partial until plumbing final notes T&P drain pipe is present. Rest ok. Note; Partial finish basement, no a/c. | MARK | MARK | | H= | P | 4726485 |
FRONT RANGE HEATING & COOLING | HC | C | 01/17/2014 | RELEASE METER | MICHAELS | MICHAELS | | HC | C | 4673937 |
FRONT RANGE HEATING & COOLING | HRR | C | 01/17/2014 | FP vent and clearances ok. | MICHAELS | MICHAELS | | HRR | C | 4673934 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HI+ | C | 01/17/2014 | 10# test ok. 1/2" black from main to fp. | MICHAELS | MICHAELS | | HI+ | C | 4673930 |
FRONT RANGE HEATING & COOLING | HRR | P | 01/09/2014 | Need fp installed, w/h vent lacks clearance to pex, rest ok. Note: duct design, partial FB, no osa, no a/c, direct vent furnace. | MICHAELS | MICHAELS | | HRR | P | 4669000 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HI | C | 01/09/2014 | 10# test ok. 1" main to furn, w/h, range. | MICHAELS | MICHAELS | | HI | C | 4668999 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | P= | C | 05/13/2014 | POTABLE WATER CERTIFICATE TO SCANNING | GABE | GABE | | P= | C | 4737470 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PWO | C | 01/27/2014 | | JOEL | JOEL | | PWO | C | 4678060 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PTO | C | 01/09/2014 | finished basement, by final sleeve thru foundation for building drain must be 2 pipe sizes larger than drain | JOEL | JOEL | | PTO | C | 4669031 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PB | C | 11/04/2013 | | JOEL | JOEL | | PB | C | 4635359 |