SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | B= | C | 06/18/2014 | | CHRISM | CHRISM | | B= | C | 4760477 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BSP | P | 05/29/2014 | deck piers ok | CHRISM | CHRISM | | BSP | P | 4747543 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BLA | C | 02/28/2014 | | CHRISM | CHRISM | | BLA | C | 4695057 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BIN | C | 02/11/2014 | | CHRISM | CHRISM | | BIN | C | 4685597 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFR | C | 02/11/2014 | | CHRISM | CHRISM | | BFR | C | 4685590 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFR | R | 02/05/2014 | ok to insulate, inspected with Nick, strongback east gable, point loads, FHA strap plate breaks less than 2', block OH door brackets, nail off dbl micro at stairs, backing under stairs | CHRISM | CHRISM | | BFR | R | 4683223 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BIN | P | 02/04/2014 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 4682828 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFI | C | 11/19/2013 | R-10 at walkout walls ok | CHRISM | CHRISM | | BFI | C | 4644492 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFD | C | 11/19/2013 | drain usable ok | CHRISM | CHRISM | | BFD | C | 4644480 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFN | C | 11/13/2013 | design and soils on file drain usable isolate and float | CHRISM | CHRISM | | BFN | C | 4640789 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFN | R | 11/12/2013 | not ready | CHRISM | CHRISM | | BFN | R | 4639490 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFT | C | 11/06/2013 | 5000# bearing pads ok | CHRISM | CHRISM | | BFT | C | 4636576 |
FIRST RATE ELECTRICAL SERVICES, INC. | E= | C | 06/16/2014 | 25 amp a/c ok | MATTHEW | MATTHEW | | E= | C | 4759056 |
FIRST RATE ELECTRICAL SERVICES, INC. | E= | R | 06/13/2014 | afci protect outlets in finished room outside of mech room, neutral and ground re-bonded in well disconnect, provide safe means to check upper deck outlet, install test lights or leave ladder to check x-mas outlets--------- 25 amp a/c ok | MATTHEW | MATTHEW | | E= | R | 4758081 |
FIRST RATE ELECTRICAL SERVICES, INC. | ES | C | 02/21/2014 | Residential Overhead: 150 amp 3/w: new res -meter set; need seal | MATTHEW | MATTHEW | | ES | C | 4691243 |
FIRST RATE ELECTRICAL SERVICES, INC. | EUG | C | 02/20/2014 | | DEAN | DEAN | | EUG | C | 4690602 |
FIRST RATE ELECTRICAL SERVICES, INC. | EUG | R | 02/20/2014 | backfilled; no history of inspection-------- call me in the AM | MATTHEW | MATTHEW | | EUG | R | 4690431 |
FIRST RATE ELECTRICAL SERVICES, INC. | ES | R | 02/20/2014 | Residential Underground: tighten wires at pedestal | MATTHEW | MATTHEW | | ES | R | 4690429 |
FIRST RATE ELECTRICAL SERVICES, INC. | ER | C | 01/22/2014 | pantry cabinet being added in kitchen | TOMC | TOMC | | ER | C | 4675580 |
FIRST RATE ELECTRICAL SERVICES, INC. | ER | R | 01/21/2014 | add outlet left of pantry and area outside of mech room-------- framed area not shown on plans --------------------------finished basement, 1-20 and 1-15 in 200 amp sub-panel | MATTHEW | MATTHEW | | ER | R | 4674800 |
REGIONAL HEATING AND AIR CONDITIONING, INC. | H= | C | 06/13/2014 | Notes-- AC complete.. High/low transfer grills to mech room. | JEFFL | JEFFL | | H= | C | 4757697 |
HOLMES PLUMBING & HEATING INC | HC | C | 02/04/2014 | RELEASE METER | MICHAELS | MICHAELS | | HC | C | 4682610 |
HOLMES PLUMBING & HEATING INC | HI | C | 02/04/2014 | 10# test ok. Correction made. | MICHAELS | MICHAELS | | HI | C | 4682605 |
HOLMES PLUMBING & HEATING INC | HI | R | 02/03/2014 | LOST TEST , INSTALL NAIL PLATE FROM IRON TO CSST ON FIREPLACE NOTE 1 1/4" LINE 1 1/4" LINE 1 FURN,2 W/H , 1 DRYER, 1 RANGE, 1 F/P AND 1 BBQ | DAVIDH | DAVIDH | | HI | R | 4682005 |
REGIONAL HEATING AND AIR CONDITIONING, INC. | HRR | C | 01/30/2014 | Rough ok. Note: duct design, FB, 6" osa, a/c rough(coil and lineset), direct vent furnace. | MICHAELS | MICHAELS | | HRR | C | 4680744 |
REGIONAL HEATING AND AIR CONDITIONING, INC. | HRR | R | 01/16/2014 | Need approved plans on site, b-vent lacks clearance to roofing, frame fp. Re-inspect all. | MICHAELS | MICHAELS | | HRR | R | 4673228 |
HOLMES PLUMBING & HEATING INC | P= | C | 06/17/2014 | CORRECTIONS MADE | GABE | GABE | | P= | C | 4759553 |
HOLMES PLUMBING & HEATING INC | P= | R | 06/16/2014 | KITCHEN WASTE NOT TO CODE , HOT COLD REVERSED AT RIGHT MASTER LAV . SECURE SHOWER ARM IN GUEST IN BASEMENT . LEAK AT BASEMENT BATH LAV . ADJUST UPPER LEVEL TUB/SHOWER VALVES TEMP . NOTE FINISHED BASEMENT . POTABLE WATER CERT TO SCANNING | GABE | GABE | | P= | R | 4758444 |
HOLMES PLUMBING & HEATING INC | PWO | C | 02/12/2014 | | JOEL | JOEL | | PWO | C | 4686114 |
HOLMES PLUMBING & HEATING INC | PWO | C | 02/12/2014 | | JOEL | JOEL | | PWO | C | 4686029 |
HOLMES PLUMBING & HEATING INC | PTO | C | 02/04/2014 | finished bssement | JOEL | JOEL | | PTO | C | 4682731 |
HOLMES PLUMBING & HEATING INC | PB | C | 11/25/2013 | NO H2O | JOEL | JOEL | | PB | C | 4647500 |