SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | B= | C | 07/31/2014 | finished basement, deck in | DALE | DALE | | B= | C | 4787650 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BLA | C | 04/09/2014 | | CHRISM | CHRISM | | BLA | C | 4717105 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BIN | C | 04/07/2014 | | CHRISM | CHRISM | | BIN | C | 4715384 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFR | C | 04/07/2014 | truss repair on file | CHRISM | CHRISM | | BFR | C | 4715381 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFR | R | 04/02/2014 | ok to insulate, truss repair for T19 bottom cords, strap landing to floor, strap top plates at rake walls | CHRISM | CHRISM | | BFR | R | 4713407 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BIN | P | 04/02/2014 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 4713023 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BSP | P | 02/10/2014 | front and rear porch roofs and posts ok | CHRISM | CHRISM | | BSP | P | 4684705 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BSP | P | 01/10/2014 | deck piers ok | CHRISM | CHRISM | | BSP | P | 4669733 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFD | C | 12/24/2013 | habitable drain, good | JEREMYC | JEREMYC | | BFD | C | 4662432 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFI | C | 12/24/2013 | 2" rigid insulation, R-10 under walk out area | JEREMYC | JEREMYC | | BFI | C | 4662423 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFN | C | 12/17/2013 | design and soils on file drain usable, isolate and float, one deck pier ok | CHRISM | CHRISM | | BFN | C | 4658493 |
SC SCOTT CONSTRUCTION CONSULTING, L.L.C. | BFT | C | 12/12/2013 | 2000# bearing pads ok | CHRISM | CHRISM | | BFT | C | 4655950 |
FIRST RATE ELECTRICAL SERVICES, INC. | E= | C | 07/30/2014 | hot tub installed, 30 amp a/c ok, generator future | MATTHEW | MATTHEW | | E= | C | 4786995 |
FIRST RATE ELECTRICAL SERVICES, INC. | E= | R | 07/29/2014 | gfci protect all kitchen countertop outlets, need afci protection and gfci protection for wet bar micro (gfci test needs to be readily accessible), breaker #16 in sub-panel won't reset, need paperwork for tub, bond all metal within 5' of tub, provide paperwork for tub, need sub-panel that feeds hot tub replaced with a disconnect that only accepts hot tub breaker, correct mater closet light clearance------------ 30 amp a/c ok----- generator pre-wire only (future) | MATTHEW | MATTHEW | | E= | R | 4786198 |
FIRST RATE ELECTRICAL SERVICES, INC. | EUG | C | 03/26/2014 | 200 amp 3/w 4/0 urd ok | TOMC | TOMC | | EUG | C | 4709486 |
FIRST RATE ELECTRICAL SERVICES, INC. | ES | C | 03/26/2014 | Residential Underground: 200 amp 3/w ok to seal | TOMC | TOMC | | ES | C | 4709484 |
FIRST RATE ELECTRICAL SERVICES, INC. | ER | C | 03/25/2014 | finished basement, #2al feeder to sub-panel on 80 amp breaker---1-15 and 1-20 at service----- 6-15 at sub-panel, #6al-------------------------get with plumber to make sure he will not be in the working space in front of sub-panel--------------------------- | MATTHEW | MATTHEW | | ER | C | 4708268 |
REGIONAL HEATING AND AIR CONDITIONING, INC. | H= | C | 07/29/2014 | correction made | TED | TED | | H= | C | 4786096 |
REGIONAL HEATING AND AIR CONDITIONING, INC. | H= | P | 07/28/2014 | Furnace and boiler vents need support in mech room. Not approved material used for discharge pipe for t&p valve to boiler. Make up air required to laundry room. Rest OK. **AC complete. | JEFFL | JEFFL | | H= | P | 4785310 |
HOLMES PLUMBING & HEATING INC | HO+ | C | 06/26/2014 | 10 lb test is ok. Note: 45' of 3/4 to fire pit. | MARK | MARK | | HO+ | C | 4765944 |
HOLMES PLUMBING & HEATING INC | HC | C | 04/02/2014 | RELEASE METER | TED | TED | | HC | C | 4713019 |
HOLMES PLUMBING & HEATING INC | HI | C | 04/02/2014 | gas piping ok | TED | TED | | HI | C | 4713018 |
HOLMES PLUMBING & HEATING INC | HWP | P | 04/01/2014 | 1st floor staple up ok | TED | TED | | HWP | P | 4712861 |
HOLMES PLUMBING & HEATING INC | HI | P | 04/01/2014 | need more info on hybrid csst system, note: 2lb system, furnace, boiler, 3-fireplaces, range, 2-bbq , need 2lb letter by final | TED | TED | | HI | P | 4712856 |
REGIONAL HEATING AND AIR CONDITIONING, INC. | HRR | C | 04/01/2014 | finished basement, a/c rough | TED | TED | | HRR | C | 4712852 |
REGIONAL HEATING AND AIR CONDITIONING, INC. | HRR | R | 03/31/2014 | no duct design paper work found, need to correct basement fireplace framing for clearance to sides, need to complete master bedroom fireplace framing | TED | TED | | HRR | R | 4711943 |
HOLMES PLUMBING & HEATING INC | HWP | P | 01/30/2014 | 60# test ok. Basement under slab. | MICHAELS | MICHAELS | | HWP | P | 4680745 |
HOLMES PLUMBING & HEATING INC | P= | C | 07/29/2014 | NOTE : FINISHED BASEMENT , RP IN MEC ROOM . PVB INSTALLED . POTABLE WATER CERT TO SCANNING | GABE | GABE | | P= | C | 4785980 |
HOLMES PLUMBING & HEATING INC | PTO | C | 04/01/2014 | DWV AND WATER ON TEST OK | GABE | GABE | | PTO | C | 4712970 |
HOLMES PLUMBING & HEATING INC | PWO | C | 02/21/2014 | | JOEL | JOEL | | PWO | C | 4691045 |
HOLMES PLUMBING & HEATING INC | PB | C | 01/03/2014 | | TIM | TIM | | PB | C | 4666313 |