SHARP GENERAL CONTRACTORS, INC | B= | C | 04/11/2014 | | JOHN | JOHN | | B= | C | 4718809 |
SHARP GENERAL CONTRACTORS, INC | B= | P | 04/10/2014 | pending other finals | JOHN | JOHN | | B= | P | 4718262 |
SHARP GENERAL CONTRACTORS, INC | BFR | C | 04/10/2014 | | JOHN | JOHN | | BFR | C | 4718261 |
SHARP GENERAL CONTRACTORS, INC | BSP | T | 04/02/2014 | PAID (REC#1187076) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice page see clouds | TCRIPPEN | TCRIPPEN | | BSP | T | 4713072 |
MARQUARDT ELECTRIC, INC | BSP | T | 03/28/2014 | PAID (REC#1187075) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: E1 | SHELBY | SHELBY | | BSP | T | 4710671 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 03/27/2014 | eng letter for west wall sign bump out 8" sistered steel studs on file / eng letter for deletion of F/S2 detail for angle brace on file for same west wall sign bump out | JOHN | JOHN | | BFR | P | 4709812 |
SHARP GENERAL CONTRACTORS, INC | BLA | C | 03/27/2014 | | JOHN | JOHN | | BLA | C | 4709805 |
SHARP GENERAL CONTRACTORS, INC | BIN | P | 03/21/2014 | west wall ok | JOHN | JOHN | | BIN | P | 4706521 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 03/20/2014 | west wall ok | JOHN | JOHN | | BFR | P | 4705958 |
SHARP GENERAL CONTRACTORS, INC | BIN | P | 03/19/2014 | north wall ok | JOHN | JOHN | | BIN | P | 4704845 |
SHARP GENERAL CONTRACTORS, INC | BIN | P | 03/14/2014 | south and east walls ok | JOHN | JOHN | | BIN | P | 4702694 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 03/14/2014 | south and north fur out walls ok | JOHN | JOHN | | BFR | P | 4702690 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 03/13/2014 | west half of the south wall and entire east wall interior fur out walls ok | JOHN | JOHN | | BFR | P | 4701817 |
SHARP GENERAL CONTRACTORS, INC | BFI | C | 03/03/2014 | under slab insulation ok | JOHN | JOHN | | BFI | C | 4695655 |
SHARP GENERAL CONTRACTORS, INC | BLA | P | 02/27/2014 | back sign area ok | JOHN | JOHN | | BLA | P | 4694189 |
SHARP GENERAL CONTRACTORS, INC | BSP | P | 02/27/2014 | top of wall trash enclosure bond beam ok | JOHN | JOHN | | BSP | P | 4694188 |
SHARP GENERAL CONTRACTORS, INC | BSP | P | 02/19/2014 | trash enclosure footing ok / roof insulation ok ( r 30 installed) and attachment ok | JOHN | JOHN | | BSP | P | 4689185 |
SHARP GENERAL CONTRACTORS, INC | BFN | C | 02/06/2014 | stamped soils and comp report on file | JOHN | JOHN | | BFN | C | 4683613 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 01/31/2014 | west end light gauge frame ok | JOHN | JOHN | | BFR | P | 4681405 |
SHARP GENERAL CONTRACTORS, INC | BFD | C | 01/28/2014 | | JOHN | JOHN | | BFD | C | 4678778 |
SHARP GENERAL CONTRACTORS, INC | BFD | P | 01/27/2014 | front and north side drain ok | JOHN | JOHN | | BFD | P | 4678309 |
SHARP GENERAL CONTRACTORS, INC | BBB | C | 01/27/2014 | east wall bond beam ok | JOHN | JOHN | | BBB | C | 4678307 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 01/22/2014 | top of wall bond beam north west and south ok and grouted / will need to check east wall at header, bearing and top of wall | JOHN | JOHN | | BBB | P | 4675750 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 01/17/2014 | west wall top of wall ok / east wall top of wall half done | JOHN | JOHN | | BBB | P | 4674143 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 01/13/2014 | top of wall bond beam on north and south joist bearing walls ok | JOHN | JOHN | | BBB | P | 4670511 |
SHARP GENERAL CONTRACTORS, INC | BSP | P | 01/08/2014 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: revise exterior finish | SHELLEY | SHELLEY | | BSP | P | 4668509 |
SHARP GENERAL CONTRACTORS, INC | BBB | P | 01/07/2014 | west wall header bond beams at window openings ok at soldier row and 2' above | JOHN | JOHN | | BBB | P | 4667564 |
SHARP GENERAL CONTRACTORS, INC | BFI | P | 12/02/2013 | 24 inches of r 10 ok up wall / will need to check for 24 inches of under slab insul to reach required amount | JOHN | JOHN | | BFI | P | 4649877 |
SHARP GENERAL CONTRACTORS, INC | BFN | P | 12/02/2013 | need stamped soils and comp report for overdig / first 4 courses ok | JOHN | JOHN | | BFN | P | 4649876 |
SHARP GENERAL CONTRACTORS, INC | BSP | T | 11/22/2013 | PAID (REC#1167892) ADDITIONAL PLAN REVIEW TIME: $50 From: DANM Splice - Plan changes | DANM | DANM | | BSP | T | 4646612 |
LANDMARK PLUMBING AND HEATING, INC. | BSP | T | 11/21/2013 | PAID (REC#1167893) PLAN SPLICE FEE: $50 by: DALEH for Mechanical | DALEH | DALEH | | BSP | T | 4646406 |
SHARP GENERAL CONTRACTORS, INC | BSP | T | 11/21/2013 | PAID (REC#1167892) ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN new splice pages see clouds | TCRIPPEN | TCRIPPEN | | BSP | T | 4646391 |
SHARP GENERAL CONTRACTORS, INC | BFT | C | 11/14/2013 | open hole on site / 2600 / 3' overdig / will need stamped soils and compaction results / footing and pads ok | JOHN | JOHN | | BFT | C | 4641361 |
SHARP GENERAL CONTRACTORS, INC | BSP | P | 11/04/2013 | inspections assigned to john welton | BLAKE | BLAKE | | BSP | P | 4635313 |
MARQUARDT ELECTRIC, INC | E= | C | 04/10/2014 | | MIKEC | MIKEC | | E= | C | 4717771 |
BJ COMPANY, LLC | E= | C | 03/27/2014 | FIRE ALARM INSPECTION: | TOMC | TOMC | | E= | C | 4709657 |
BJ COMPANY, LLC | ER | C | 03/27/2014 | FIRE ALARM INSPECTION: rough complete | TOMC | TOMC | | ER | C | 4709653 |
MARQUARDT ELECTRIC, INC | ES | C | 03/27/2014 | Commercial Service: 800 amp 120/208 CT meter ok to set meter and seal ------------- cannot finale until plans have been spliced showing change in feeder size and change in GEC size | TOMC | TOMC | | ES | C | 4709648 |
MARQUARDT ELECTRIC, INC | ES | P | 03/26/2014 | Commercial Service: 800 amp 120/208 CT meter ----------- ok to set meter and seal | TOMC | TOMC | | ES | P | 4709207 |
MARQUARDT ELECTRIC, INC | ESL | C | 02/28/2014 | panel to panel east wall | MATTHEW | MATTHEW | | ESL | C | 4694820 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 03/28/2014 | GAS FINAL REQUESTED. | JON | JON | | H= | C | 4710879 |
AIRTECH MECHANICAL, INC. | H= | C | 03/13/2014 | THIS CONTRACTOR SCOPE OF WORK COMPLETE | ROBERTV | ROBERTV | | H= | C | 4702196 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 02/19/2014 | GAS FINAL OK PENDING CONTRACTOR CALLING IN INSPECTION. | NANCY | NANCY | | H= | P | 4689743 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 02/19/2014 | OK TO SET METER. | NANCY | NANCY | | HC | C | 4689741 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 02/19/2014 | 10 LB TEST OK. INSTALLED AS PER PRINTS. | NANCY | NANCY | | HI | C | 4689740 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | C | 04/03/2014 | new splice to show roof drain design | TIM | TIM | | PRD | C | 4714301 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 04/03/2014 | | TIM | TIM | | P= | C | 4714300 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 03/28/2014 | NEED PLANS REVISED TO SHOW CHANGES ON OVERFLOW PIPING -- CHANGED FROM TWO SEPARATE 6" DROPS TO 2- 6 X 4 X 4 DROPS TO FIT IN EXTERIOR WALL -- TESTS OK | LEE | LEE | | PRD | P | 4710953 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 03/28/2014 | | LEE | LEE | | PTO | C | 4710934 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 01/31/2014 | STUB IN SOUTHEAST CORNER. NEED APPROVED PLAN ON SITE. | DICK | DICK | | PRD | P | 4681647 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 01/31/2014 | TRAP AT SOUTHEAST CORNER. NEED APPROVED PLAN ON SITE. | DICK | DICK | | PB | P | 4681645 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 01/28/2014 | WATER STUB IN OK. | DICK | DICK | | PB | P | 4678953 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 01/28/2014 | | DICK | DICK | | PB | P | 4678684 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 11/19/2013 | DWV FLOOR DRAIN AND CLEAN OUTS. | DICK | DICK | | PB | P | 4644908 |