GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 07/17/2014 | | JOHNP | JOHNP | | B= | C | 4778433 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 06/26/2014 | Temp CO: to occupy ( Expires: 7/26/2014 12:00:00 AM) | REBECCA | REBECCA | | B= | P | 4765689 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BT= | P | 06/25/2014 | OK after other partial finals | JOHNP | JOHNP | | BT= | P | 4765087 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/17/2014 | Firecaulk complete | JOHNP | JOHNP | | BSP | P | 4759384 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/17/2014 | Letter on spray on fire resistive materials observation & testing picked up | JOHNP | JOHNP | | BSP | P | 4759377 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | C | 06/17/2014 | Letter on structural steel welds picked up | JOHNP | JOHNP | | BFR | C | 4759371 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BBB | C | 06/17/2014 | Engineer's observation letter picked up | JOHNP | JOHNP | | BBB | C | 4759370 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | C | 06/17/2014 | Letter on foundation steel observation picked up | JOHNP | JOHNP | | BFN | C | 4759366 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFT | C | 06/17/2014 | Letter on drilled piers picked up | JOHNP | JOHNP | | BFT | C | 4759365 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/28/2014 | Fireproofing at deck - all except 1 wall of HVAC shaft, stair tower & rated wall at bridge - OK | JOHNP | JOHNP | | BSP | P | 4746402 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/23/2014 | Bridge walls, soffits & underside fir down OK, underside insulation OK | JOHNP | JOHNP | | BFR | P | 4744571 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/16/2014 | Shaft liner at garage side OK | JOHNP | JOHNP | | BSP | P | 4739999 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/12/2014 | Firecaulk above grid in corridor & vault rated walls OK | JOHNP | JOHNP | | BSP | P | 4736684 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/08/2014 | Shafts OK, call for above grid before tile | JOHNP | JOHNP | | BSP | P | 4735037 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | C | 05/08/2014 | | JOHNP | JOHNP | | BIN | C | 4735033 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/06/2014 | Wall in IT room OK | JOHNP | JOHNP | | BFR | P | 4733390 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 05/06/2014 | 2nd floor corridor, except SE end - OK | JOHNP | JOHNP | | BIN | P | 4733385 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/02/2014 | 2nd floor walls - call for outside layers of shaft liner on shafts | JOHNP | JOHNP | | BFR | P | 4731778 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 04/22/2014 | 1st floor OK | JOHNP | JOHNP | | BIN | P | 4724563 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/18/2014 | Soffits in linear accelerator room OK | JOHNP | JOHNP | | BFR | P | 4722724 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/14/2014 | interior office walls first floor OK; need soffits framed | DANF | DANF | | BFR | P | 4719644 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/02/2014 | Exterior walls - South side & patio area | JOHNP | JOHNP | | BFR | P | 4713215 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/25/2014 | exterior wall framing 2nd floor gird A.9, lines 8-11 and grid C.5, lines 8.5-11; OK to rock 1st floor corridor/smoke barrier top 3' and spray for rated headwall detail; contractor working with structural engineer for welding and bolting and structural obseration and will provide letter at later date. | DANF | DANF | | BFR | P | 4707943 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BBB | R | 12/30/2013 | Not ready - need CTL Thompson report | JOHNP | JOHNP | | BBB | R | 4663988 |
ENCORE ELECTRIC, INC. | E= | C | 07/07/2014 | | CRAIGS | CRAIGS | | E= | C | 4771669 |
ENCORE ELECTRIC, INC. | ER | C | 07/07/2014 | | CRAIGS | CRAIGS | | ER | C | 4771668 |
ENCORE ELECTRIC, INC. | E= | P | 06/26/2014 | just need to see under bridge lighting and verify corrections on first floor | CRAIGS | CRAIGS | | E= | P | 4765678 |
ENCORE ELECTRIC, INC. | E= | C | 06/23/2014 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 4763227 |
ENCORE ELECTRIC, INC. | E= | P | 06/11/2014 | 2nd floor hall , rooms 2101 , 2102 , 2103 , 2105 , 2106 , 2107 , 2108 | TOMC | TOMC | | E= | P | 4755358 |
ENCORE ELECTRIC, INC. | E= | R | 06/09/2014 | need poc # could not find area of work. | BRET | BRET | | E= | R | 4753667 |
ENCORE ELECTRIC, INC. | E= | P | 06/06/2014 | first floor ==== gfci device can not go behind an appliance room #1000=====panels need fed from and color codes posted ==========gfci 6' from slop sink room #1108 | CRAIGS | CRAIGS | | E= | P | 4753361 |
ENCORE ELECTRIC, INC. | ER | P | 06/06/2014 | bridge above ceiling | CRAIGS | CRAIGS | | ER | P | 4753353 |
ENCORE ELECTRIC, INC. | ER | P | 06/06/2014 | FIRE ALARM INSPECTION: bridge above ceiling OK | CRAIGS | CRAIGS | | ER | P | 4753352 |
ENCORE ELECTRIC, INC. | E= | R | 06/05/2014 | please leave an on site contact number so we can find them --- was here at 11:55 am | CRAIGS | CRAIGS | | E= | R | 4751957 |
ENCORE ELECTRIC, INC. | ER | C | 05/28/2014 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | ER | C | 4746649 |
ENCORE ELECTRIC, INC. | ER | P | 05/28/2014 | can't have cord connected equipment above the ceiling ---leave tile out where the condensate pump is located in the hall way of the second floor ---- ok to cover the rest of 2nd floor ceiling | CRAIGS | CRAIGS | | ER | P | 4746646 |
ENCORE ELECTRIC, INC. | ER | P | 05/15/2014 | above ceilings first floor and power conditioner | CRAIGS | CRAIGS | | ER | P | 4739183 |
ENCORE ELECTRIC, INC. | ER | P | 05/15/2014 | FIRE ALARM INSPECTION: above ceilings --first floor | CRAIGS | CRAIGS | | ER | P | 4739178 |
ENCORE ELECTRIC, INC. | EP | P | 05/12/2014 | PANELS--J ---B1---STILL NEED TO VERIFY OCP ON LINE SIDE---PANELS OK--WITH # 10 EQUIPMENT BOND------- | BRIAN | BRIAN | | EP | P | 4737000 |
ENCORE ELECTRIC, INC. | ER | P | 05/12/2014 | FIRE ALARM IN VAULT ---CEILING OK | BRIAN | BRIAN | | ER | P | 4736993 |
ENCORE ELECTRIC, INC. | ER | P | 05/12/2014 | CEILING IN VAULT 1ST FLOOR------PART OF CORRIDOR ON 2ND FLOOR -----SEE APPROVED DRAWINGS----- | BRIAN | BRIAN | | ER | P | 4736989 |
ENCORE ELECTRIC, INC. | EP | P | 05/09/2014 | stamped drawings locked up --- need stamped drawings in hand ---- will check both ends on Monday 5/12/2012 | CRAIGS | CRAIGS | | EP | P | 4736467 |
ENCORE ELECTRIC, INC. | ER | P | 05/02/2014 | 2nd floor walls including fire alarm except east end of corridor ------ please call in a separate inspection for fire alarm | CRAIGS | CRAIGS | | ER | P | 4732164 |
ENCORE ELECTRIC, INC. | ER | P | 04/24/2014 | walls and soffit first floor -- see inspection book | CRAIGS | CRAIGS | | ER | P | 4726083 |
ENCORE ELECTRIC, INC. | ER | P | 04/11/2014 | ROOMS--1114---1118--1115--1104--1116---1113---1119---1111---1112---1109---1108---1107---1117---1102---1100-----WALLS ONLY--- AND--FIRE ALARM STUBS | BRIAN | BRIAN | | ER | P | 4719135 |
ENCORE ELECTRIC, INC. | ER | P | 03/04/2014 | under slab second floor see inspection long book | CRAIGS | CRAIGS | | ER | P | 4696627 |
ENCORE ELECTRIC, INC. | EUG | P | 01/16/2014 | see inspection log book -- also OK'd tying the ends of underground conduit with out inspection I have seen both ends and they are not in patient care areas | CRAIGS | CRAIGS | | EUG | P | 4673052 |
ENCORE ELECTRIC, INC. | EUG | P | 01/14/2014 | SEE LOG BOOK | MIKEC | MIKEC | | EUG | P | 4671526 |
ENCORE ELECTRIC, INC. | EUG | P | 11/26/2013 | 2-- 2 1/2 pvc from existing building going east under slab conduits OK | CRAIGS | CRAIGS | | EUG | P | 4648489 |
ENCORE ELECTRIC, INC. | EUG | P | 11/22/2013 | power conduits are in pvc coated grc OK | CRAIGS | CRAIGS | | EUG | P | 4647042 |
ENCORE ELECTRIC, INC. | EUG | P | 11/19/2013 | under slab for pen rad imaging pvc conduits ranging in size | CRAIGS | CRAIGS | | EUG | P | 4644379 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 06/26/2014 | MECHANICAL PIPING FINAL OK. | NANCY | NANCY | | H= | C | 4765935 |
COLORADO SHEET METAL CO., INC. | H= | C | 06/26/2014 | MECHANICAL FINAL OK, TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 4765695 |
COLORADO SHEET METAL CO., INC. | H= | P | 06/19/2014 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4761438 |
COLORADO SHEET METAL CO., INC. | H= | P | 05/28/2014 | SECOND FLOOR: ABOVE CEILING ALL OK. LABEL GRID FOR DAMPER LOCATIONS. FOR REST OF FINAL STILL NEED TO SEE DAMPER ABOVE DOOR ON FIRST FLOOR, BRIDGE, VESTIBULE AND ROOF. | NANCY | NANCY | | H= | P | 4746493 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 05/16/2014 | 1ST FLOOR: PIPING TO VAV'S ALL OK. 2ND FLOOR: CHILLED WATER SUPPLY/RETURN AND HOT WATER SUPPLY/RETURN UNDER WORKING PRESSURE, NO VISIBLE LEAKS. OK TO INSULATE. ROOF: CHILLED WATER SUPPLY/RETURN AND HOT WATER SUPPLY/RETURN UNDER WORKING PRESSURE, OK TO COMPLETE INSULATION AT WELDS. NO STEAM INSPECTION YET. | NANCY | NANCY | | HWP | P | 4739996 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/13/2014 | (MAIN FLOOR) -- ABOVE CEILING OK, CHECK FIRE DAMPERS ABOVE DOORWAY FOR CORRECT RETAINAGE BY FINAL | ROBERTV | ROBERTV | | HD | P | 4737773 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/06/2014 | EAST AND WEST SHAFT FRAMING FOR 3 - DAMPERS OK FOR SHEETROCK PER BUILDING INSPECTOR. CHECK SHEETROCK GAP AND MOTORS OUT OF WALL BEFORE RETAINING ANGLE ATTACHMENT. | ROBERTV | ROBERTV | | HD | P | 4733337 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/01/2014 | EAST AND WEST FRAMING FOR SHAFT DAMPERS APPEARS INCORRECT, PROVIDE SHAFT FRAMING SUPPLEMENT INSTRUCTIONS FOR DAMPER INSTALLATION, EAST SHAFT WITH HORIZONTAL DAMPER MAY NEED STRUCTURAL ENGINEER DETAIL IF MANUFACTURER SUPPLEMENT DOES NOT ADDRESS, DO NOT CONCEAL | ROBERTV | ROBERTV | | HD | P | 4731391 |
COLORADO SHEET METAL CO., INC. | HD | P | 04/23/2014 | 2ND LEVEL SA OK TO WRAP, NEED TO INSPECT FIRE DAMPER FRAMING FOR WEST SHAFT, COULD NOT LOCATE HORIZONTAL FRAMING DETAIL FOR ABOVE SLAB F/SD AT EAST SHAFT, STRUCTURAL ENGINEER NEEDS TO BE CONTACTED. | ROBERTV | ROBERTV | | HD | P | 4725895 |
COLORADO SHEET METAL CO., INC. | HD | P | 04/22/2014 | 30X16 AND 16" ROUND FIRE DAMPER FRAMING ABOVE DOORWAY OK FOR SHEETROCK | ROBERTV | ROBERTV | | HD | P | 4724324 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 04/15/2014 | (MECH PAGE M111) -- ALL FIRST FLOOR HW OK TO INSULATE, CHILLED WATER TO VAULT OK TO INSULATE. CHECK TIE-IN IN CLOSET WHEN READY | ROBERTV | ROBERTV | | HWP | P | 4720799 |
COLORADO SHEET METAL CO., INC. | HD | P | 04/09/2014 | NEED ADDITIONAL FRAMING FOR 30X16 FD AND 16" FD AT CENTER PARTIAL STUDS TO DOOR JAMB BEFORE SHEETROCK, TALKED TO JARED AND FRAMING CONTRACTOR ONSITE. 60X20, 10X20, 50X20 HORIZONTAL F/S DAMPER OPENINGS WITH RETAINAGE OK. ALL DUCT SHOWN ON M110 OK TO WRAP EXCEPT FC/03 AND NAVIGATORS AREA | ROBERTV | ROBERTV | | HD | P | 4717476 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 02/19/2014 | (CANCER CENTER BASEMENT MECH ROOM, PLAN PAGE M100) -- TEST AND INSTALLATION ON HW/CW AND STEAM OK TO INSULATE AND LABEL, 1ST FLOOR VERTICAL PIPING OK TO INSULATE LABEL AND CONCEAL, TEST GAUGES AND VERTICAL STUBS LOCATED ON 2ND FLOOR | ROBERTV | ROBERTV | | HWP | P | 4689406 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 06/26/2014 | | JOEL | JOEL | | P= | C | 4765685 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 06/16/2014 | install mixing valves on lavs | JOEL | JOEL | | P= | P | 4758566 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 05/02/2014 | ALL WASTE AND WATER ON TEST . WATER TIE IN BY FINAL | GABE | GABE | | PTO | C | 4732299 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/10/2014 | OK TO DRY WALL , OK FOR INSULATION ON ROOF DRAIN OVER FLOW | GABE | GABE | | PTO | P | 4718558 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 01/17/2014 | THREE 6" INTO 8" UNDER GROUND ROOF DRAINS TO OUTSIDE OF BUILDING OK. REST OF PLUMBING BASE COMPLETE FOR CANCER CENTER. | DICK | DICK | | PB | C | 4673763 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 11/20/2013 | 2" trunk and risers for hand sink, floor drain and c/o in linear room | TIM | TIM | | PB | P | 4645031 |