DME HOMES | B= | C | 12/19/2014 | All other required Final inspections are complete. (This is a computer generated result) | DALE | DALE | | B= | C | 4875328 |
DME HOMES | B= | P | 08/18/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet. finished basement, no deck | DALE | DALE | | B= | P | 4798836 |
DME HOMES | BLA | C | 06/06/2014 | | CHRISM | CHRISM | | BLA | C | 4753248 |
DME HOMES | BFR | C | 05/22/2014 | | CHRISM | CHRISM | | BFR | C | 4743888 |
DME HOMES | BIN | P | 05/21/2014 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | TERRI | TERRI | | BIN | P | 4742643 |
DME HOMES | BFD | C | 04/09/2014 | soils on file drain usable isolate and float | CHRISM | CHRISM | | BFD | C | 4717532 |
DME HOMES | BFN | C | 04/09/2014 | design and eng report on file | CHRISM | CHRISM | | BFN | C | 4717525 |
DME HOMES | BFT | C | 04/09/2014 | eng report on file | CHRISM | CHRISM | | BFT | C | 4717524 |
DME HOMES | BFN | P | 04/09/2014 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFN | P | 4716813 |
DME HOMES | BFT | P | 04/09/2014 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFT | P | 4716812 |
PENTAGON ELECTRIC | E= | C | 08/15/2014 | a/c and generator installed | MATTHEW | MATTHEW | | E= | C | 4798292 |
PENTAGON ELECTRIC | E= | R | 08/14/2014 | outlets for shop lights in garage need to be gfci protected, verify wire size on 15 amp sensing breaker | MATTHEW | MATTHEW | | E= | R | 4797088 |
PENTAGON ELECTRIC | E= | R | 08/13/2014 | cap off neutral in well disconnect and un use wire panel ----------------- provide means to check lights in garage --------------- install vinyl tape over sub panel spice ------------------- all TC cable needs to be in a conduit entire length for well and generator --------------- a/c ok 30 | CRAIG | CRAIG | | E= | R | 4796571 |
PENTAGON ELECTRIC | E= | L | 08/12/2014 | locked 2:38 | MATTHEW | MATTHEW | | E= | L | 4795464 |
PENTAGON ELECTRIC | ES | C | 05/19/2014 | Residential Overhead: 200 amp 3/w: new res----------- meter is set; need seal | MATTHEW | MATTHEW | | ES | C | 4741318 |
PENTAGON ELECTRIC | ER | C | 05/19/2014 | finished basement, 1/0 al sub-panel ok (not breakered)-----1-15 at sub-panel, 3-15 at service----------- contractor needs to verify spacing behind sink | MATTHEW | MATTHEW | | ER | C | 4741316 |
PENTAGON ELECTRIC | EUG | C | 05/15/2014 | service lateral from pole t home | MATTHEW | MATTHEW | | EUG | C | 4739619 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 08/12/2014 | correction made | TED | TED | | H= | C | 4795318 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 07/25/2014 | is generator going to be installed under this permit or at a later date under another permit? note: rest ok, finished basement, a/c installed, water heater in unfinished storage area | TED | TED | | H= | P | 4784298 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | R | 07/24/2014 | cancel per troy | TED | TED | | H= | R | 4783314 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | R | 07/22/2014 | not ready, walk job before inspection is called, venting not complete on furnace or water heater, no stat, no transfer opening to mech. room, connect gas to water heater, did furnace and water heater get change to l.p.? | TED | TED | | H= | R | 4781344 |
GLASER ENERGY GROUP INC. | HC | C | 05/21/2014 | RELEASE METER | TED | TED | | HC | C | 4743157 |
GLASER ENERGY GROUP INC. | HO | C | 05/21/2014 | 60lb test on outside under ground l.p. piping | TED | TED | | HO | C | 4743152 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 05/15/2014 | finished basement, a/c rough, outside air to return, duct design | TED | TED | | HRR | C | 4739555 |
L & L GAS SHOP, LLC. | HI | C | 05/08/2014 | 1 1/4'' furnace, w/h, range, dryer, generator | TED | TED | | HI | C | 4735313 |
JOLLY PLUMBING & HEATING INC. | P= | C | 08/07/2014 | received potable water cert | TIM | TIM | | P= | C | 4792065 |
JOLLY PLUMBING & HEATING INC. | P= | C | 08/06/2014 | | LEE | LEE | | P= | C | 4791775 |
JOLLY PLUMBING & HEATING INC. | P= | P | 07/24/2014 | NOTE : UNFINISHED BASEMENT . PVB INSTALLED . NEED POTABLE WATER CERT FOR COMPLETION . | GABE | GABE | | P= | P | 4783380 |
JOLLY PLUMBING & HEATING INC. | PWO | C | 05/14/2014 | NOTE : POTABLE WATER CERTIFICATE BY FINAL | GABE | GABE | | PWO | C | 4738255 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 05/05/2014 | NOTE : POTABLE WATER CERTIFICATE BY FINAL | GABE | GABE | | PTO | C | 4732555 |
JOLLY PLUMBING & HEATING INC. | PB | C | 04/16/2014 | COPPER WATER IN | GABE | GABE | | PB | C | 4721306 |