BLUE MOON BUILDERS, INC | B= | C | 04/28/2014 | All other required Final inspections are complete. (This is a computer generated result) | CHRISM | CHRISM | | B= | C | 4727993 |
BLUE MOON BUILDERS, INC | B= | P | 04/28/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet. | CHRISM | CHRISM | | B= | P | 4727966 |
BLUE MOON BUILDERS, INC | B= | P | 04/24/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet. install CO detectors
-- Schedule a new Building Final when above items are complete. | CHRISM | CHRISM | | B= | P | 4726556 |
BLUE MOON BUILDERS, INC | BIN | C | 02/07/2014 | unfinished basement | CHRISM | CHRISM | | BIN | C | 4684270 |
BLUE MOON BUILDERS, INC | BFR | C | 02/07/2014 | | CHRISM | CHRISM | | BFR | C | 4684222 |
BLUE MOON BUILDERS, INC | BFR | P | 02/05/2014 | Need to finish nailing stair straps / Need roll blocking in sun room / Need H2.5 in sun room | CHRISM | CHRISM | | BFR | P | 4683273 |
BLUE MOON BUILDERS, INC | BSP | T | 01/14/2014 | PAID (REC#1177989) PLAN SPLICE FEE: $50 by: RUSSELL for Mechanical: Revised duct layout on basement | RUSSELL | RUSSELL | | BSP | T | 4671861 |
BLUE MOON BUILDERS, INC | BFI | C | 12/18/2013 | | CHRISM | CHRISM | | BFI | C | 4659405 |
BLUE MOON BUILDERS, INC | BFD | C | 12/16/2013 | soils on file drain usable isolate and float | CHRISM | CHRISM | | BFD | C | 4657679 |
BLUE MOON BUILDERS, INC | BFN | C | 12/16/2013 | design and eng report on file | CHRISM | CHRISM | | BFN | C | 4657676 |
BLUE MOON BUILDERS, INC | BFT | C | 12/16/2013 | eng report on file | CHRISM | CHRISM | | BFT | C | 4657673 |
TOP ELECTRIC, INC. | E= | C | 04/18/2014 | no a/c | MATTHEW | MATTHEW | | E= | C | 4723254 |
TOP ELECTRIC, INC. | E= | R | 04/17/2014 | jetted tub outlet wired wrong ------------ master closet light needs to be enclosed -------------- | CRAIG | CRAIG | | E= | R | 4722423 |
TOP ELECTRIC, INC. | ES | C | 04/17/2014 | Residential Overhead: 200 AMP 3/W NEW RES. NO ACTION NEEDED | CRAIG | CRAIG | | ES | C | 4722413 |
TOP ELECTRIC, INC. | EUG | C | 02/18/2014 | 200 amp feeder from panel on pole to house | MATTHEW | MATTHEW | | EUG | C | 4688657 |
TOP ELECTRIC, INC. | ER | C | 02/04/2014 | unfinished basement, 8-3 nm to cooking equipment, #2al sub-panel (no breakers installed) ------------------------check mcc's at service inspection | MATTHEW | MATTHEW | | ER | C | 4682569 |
BROWN'S HEATING & COOLING, INC | H= | C | 04/17/2014 | Unfinished basement.. direct vent furnace. | JEFFL | JEFFL | | H= | C | 4722150 |
BROWN'S HEATING & COOLING, INC | HRR | C | 02/11/2014 | correction made | TED | TED | | HRR | C | 4685155 |
BROWN'S HEATING & COOLING, INC | HRR | P | 02/04/2014 | finish dryer vent through roof, note: unfinished basement, no a/c, outside air to return, duct design | TED | TED | | HRR | P | 4682416 |
AIR CONCEPTS HEATING & COOLING | HI | C | 01/31/2014 | 10 LB TEST OK NOTE 1 FURN,W/H,BBQ AND C/T | DAVIDH | DAVIDH | | HI | C | 4681407 |
T.J. PLUMBING AND HEATING | P= | C | 04/22/2014 | POTABLE WATER CERTIFICATE RECEIVED , SENT TO SCANNING | GABE | GABE | | P= | C | 4724789 |
T.J. PLUMBING AND HEATING | P= | P | 04/21/2014 | ADJUST TEMP AT BOTH BATH SHOWER VALVES , HI LOOP REQUIRED AT DISHWASHER , NOTE : UNFINISHED BASEMENT. | GABE | GABE | | P= | P | 4723637 |
T.J. PLUMBING AND HEATING | PWO | C | 03/20/2014 | | TIM | TIM | | PWO | C | 4705784 |
T.J. PLUMBING AND HEATING | PWO | P | 03/19/2014 | cancel at call ahead | TIM | TIM | | PWO | P | 4704849 |
T.J. PLUMBING AND HEATING | PTO | C | 01/29/2014 | unfinished basement | JOEL | JOEL | | PTO | C | 4680093 |
T.J. PLUMBING AND HEATING | PB | C | 12/24/2013 | basement drains to sewage ejector | TED | TED | | PB | C | 4662406 |