SEEGER HOMES, INC | B= | C | 05/06/2015 | unit# 14-M32545 certification# 35192 | DALE | DALE | | B= | C | 4949835 |
SEEGER HOMES, INC | B= | R | 04/29/2015 | no one home at 1:06 | DALE | DALE | | B= | R | 4945480 |
SEEGER HOMES, INC | B= | R | 08/20/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet, External Agency Inspection HD= by HEALTHDEPT is not Completed yet. need address # at street and house / need tip-outs on downspouts / need cover on window well at patio / final grade / complete siding at walkout | DALE | DALE | | B= | R | 4800705 |
SEEGER HOMES, INC | BFR | C | 07/31/2014 | center wall ok | DALE | DALE | | BFR | C | 4787958 |
SEEGER HOMES, INC | BTD | C | 06/30/2014 | marriage wall connections ok | CHRISM | CHRISM | | BTD | C | 4768166 |
SEEGER HOMES, INC | BIN | P | 06/30/2014 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | CHERYL | CHERYL | | BIN | P | 4767770 |
SEEGER HOMES, INC | BFI | C | 06/05/2014 | R-10 at walkout | CHRISM | CHRISM | | BFI | C | 4752405 |
SEEGER HOMES, INC | BFD | C | 06/05/2014 | soils on file drain usable isolate and float | CHRISM | CHRISM | | BFD | C | 4752403 |
SEEGER HOMES, INC | BFN | C | 06/05/2014 | design and eng report on file | CHRISM | CHRISM | | BFN | C | 4752402 |
SEEGER HOMES, INC | BFT | C | 06/05/2014 | eng report on file | CHRISM | CHRISM | | BFT | C | 4752401 |
SEEGER HOMES, INC | BFN | P | 05/28/2014 | AUTHORIZED INSPECTION BY ENGINEER | REBECCA | REBECCA | REBECCA | BFN | P | 4746285 |
SEEGER HOMES, INC | BFT | P | 05/28/2014 | AUTHORIZED INSPECTION BY ENGINEER | REBECCA | REBECCA | REBECCA | BFT | P | 4746284 |
ADVANCE ELECTRIC | E= | C | 08/15/2014 | | JOSEPH | JOSEPH | | E= | C | 4798010 |
ADVANCE ELECTRIC | E= | R | 07/29/2014 | panel not listed for tandem breaker, install stair light to check 3 ways, gfci protect switch controlled outlet (gfci test needs to be readily accessible) | MATTHEW | MATTHEW | | E= | R | 4786482 |
ADVANCE ELECTRIC | ES | C | 07/29/2014 | Residential Overhead: 200 amp 3/w: new res----- meter is set--- need seal | MATTHEW | MATTHEW | | ES | C | 4786481 |
ADVANCE ELECTRIC | E= | R | 07/16/2014 | not ready: basement not wired, nm hanging in many locations | MATTHEW | MATTHEW | | E= | R | 4778413 |
ADVANCE ELECTRIC | ES | R | 07/16/2014 | bond screw stripped | MATTHEW | MATTHEW | | ES | R | 4778412 |
ADVANCE ELECTRIC | EUG | C | 07/11/2014 | EUG ok.--------------------informed contractor to leave the end open to verify the bell end. | DEAN | DEAN | | EUG | C | 4775641 |
ADVANCE ELECTRIC | EUG | C | 07/11/2014 | OK to cover leave except leave open at utility pole need to see bell end on PVC riser | JOSEPH | JOSEPH | | EUG | C | 4775531 |
ADVANCE ELECTRIC | ES | R | 07/11/2014 | Missing main bonding screw so the neutral is floated----------------UFER GEC should be # 4 cu not # 6.------------If cold water will be copper remember you need to b=run GEC to it.------------- Expose bell end on PVC at utility pole.-----------------Terminate GEC at service neutral terminal strip---------- By final install inter-system bonding terminal | JOSEPH | JOSEPH | | ES | R | 4775530 |
AIR CONCEPTS HEATING & COOLING | H= | C | 08/19/2014 | unfinished basement, no a/c | TED | TED | | H= | C | 4799884 |
AIR CONCEPTS HEATING & COOLING | HC | C | 07/24/2014 | RELEASE METER | TED | TED | | HC | C | 4783551 |
AIR CONCEPTS HEATING & COOLING | HRR | C | 07/24/2014 | unfinished basement, no a/c, duct design (no outside air to return per plan) furnace and water heater in basement, water heater b vent ok | TED | TED | | HRR | C | 4783550 |
AIR CONCEPTS HEATING & COOLING | HI | C | 07/16/2014 | need 2lb system and letter by final, meter at street, note: 1'' furnace, w/h | TED | TED | | HI | C | 4777969 |
AIR CONCEPTS HEATING & COOLING | HRR | R | 07/16/2014 | no duct design or equipment schedule paper work found, frame b vent run through 1st floor, open patch in ceiling around b vent to inspect vent clearance and attic insulation shield, waive trip fee, had another inspection at same house, note: manufacture house (irc) over unfinished basement, furnace and water heater in basement | TED | TED | | HRR | R | 4777968 |
O.M.A.G.M., INC. | HO | C | 07/15/2014 | 10lb test on old and new repaired under ground piping from road to house, note: need 2lb system and letter by final | TED | TED | | HO | C | 4777115 |
T.J. PLUMBING AND HEATING | P= | C | 08/18/2014 | | TIM | TIM | | P= | C | 4798967 |
T.J. PLUMBING AND HEATING | P= | P | 08/14/2014 | no water, (pressure switch not working properly) need proof of potable water | TIM | TIM | | P= | P | 4797400 |
T.J. PLUMBING AND HEATING | PTO | C | 07/23/2014 | | TIM | TIM | | PTO | C | 4782746 |
T.J. PLUMBING AND HEATING | PB | C | 06/12/2014 | no under slab wtr | TIM | TIM | | PB | C | 4757028 |