HOMEOWNER | B= | C | 09/22/2015 | | BOBF | BOBF | | B= | C | 5042032 |
HOMEOWNER | BSP | P | 07/28/2015 | 2 piers at front stairs ok | DALE | DALE | | BSP | P | 5002523 |
HOMEOWNER | BFR | C | 03/17/2015 | | BOBF | BOBF | | BFR | C | 4918817 |
HOMEOWNER | BIN | C | 03/17/2015 | | BOBF | BOBF | | BIN | C | 4918816 |
HOMEOWNER | BFR | P | 03/11/2015 | need stamped engineer repair letter for added repairs, add thru bolts into 4 ply LVL in basement, shim bottom of rim joists at deck, add 2x8 joist, over 24"span , need 36" to window well head clearance under deck by final, , ok to insulate | ED | ED | | BFR | P | 4915369 |
HOMEOWNER | BSP | T | 03/09/2015 | PAID (REC#1249329) PLAN SPLICE FEE: $50 by: MICHAEL for Construction: Add spiral stair | MICHAELA | MICHAELA | | BSP | T | 4913344 |
HOMEOWNER | BSP | P | 12/03/2014 | frame at fireplace vent ok | DALE | DALE | | BSP | P | 4863705 |
HOMEOWNER | BSP | P | 04/21/2014 | please contact Chris about ceiling height issues ok to add two plates to foundation, glue lam beam is installed upside down | CHRISM | CHRISM | | BSP | P | 4723815 |
HOMEOWNER | BSP | P | 03/28/2014 | deck and porch piers ok | CHRISM | CHRISM | | BSP | P | 4710912 |
HOMEOWNER | BFD | C | 02/18/2014 | soils on file drain usable isolate and flloat | CHRISM | CHRISM | | BFD | C | 4688511 |
HOMEOWNER | BFN | C | 02/18/2014 | design and eng report on file | CHRISM | CHRISM | | BFN | C | 4688510 |
HOMEOWNER | BFT | C | 02/18/2014 | eng report on file | CHRISM | CHRISM | | BFT | C | 4688498 |
HOMEOWNER | BFN | P | 02/18/2014 | AUTHORIZED INSPECTION BY ENGINEER | BPHILLIPS | BPHILLIPS | BPHILLIPS | BFN | P | 4688024 |
HOMEOWNER | BFT | P | 02/18/2014 | AUTHORIZED INSPECTION BY ENGINEER | BPHILLIPS | BPHILLIPS | BPHILLIPS | BFT | P | 4688023 |
HOMEOWNER | E= | C | 09/11/2015 | | CRAIG | CRAIG | | E= | C | 5034945 |
HOMEOWNER | E= | R | 09/03/2015 | dishwasher/disposal/ kitchen lights on small appliance circuit, afci to 2011 nec, need access to all outlets in dining room and garage, need 20 amp afci to dining outlets, wr back exterior outlet, tr kitchen and mech outlets, gfci mech outlets, need dedicated 20 amp washer circuit, correct spacing left of kitchen sink and ad outlet at end of peninsula, install spa outlet access, protect nm in mech room, sub-panel needs to be labeled/breaker blanks/ko seals---------- complete re-inspect | MATTHEW | MATTHEW | | E= | R | 5030164 |
HOMEOWNER | ER | C | 03/05/2015 | | CRAIG | CRAIG | | ER | C | 4912276 |
HOMEOWNER | ER | R | 03/04/2015 | install 12/3 to all 8 smoke detector | CRAIG | CRAIG | | ER | R | 4911317 |
HOMEOWNER | ER | R | 03/02/2015 | install back porch outlet ---------------- install 12/3 for all smoke detectors in house -------------- | CRAIG | CRAIG | | ER | R | 4910431 |
HIGH MOUNTAIN ELECTRIC INC. | ES | C | 12/18/2014 | Residential Underground: 200 amp 3/w: new res------------------------------------------- NOTE!!!----- ONLY ONE GROUND ROD INSTALLED; CHECK FOR UFER AT TIME OF ROUGH----- LANDING BEING BUILT FOR DISCONNECT CLEARANCE | MATTHEW | MATTHEW | | ES | C | 4874878 |
HOMEOWNER | ER | P | 12/09/2014 | nm to main floor lighting notched in ceiling timbers, stubs for all exterior lights | MATTHEW | MATTHEW | | ER | P | 4868001 |
HIGH MOUNTAIN ELECTRIC INC. | EUG | C | 12/03/2014 | service lateral from pole to home | MATTHEW | MATTHEW | | EUG | C | 4864461 |
HIGH MOUNTAIN ELECTRIC INC. | EUG | R | 11/25/2014 | install service lateral in pedestal | CRAIG | CRAIG | | EUG | R | 4859971 |
HOMEOWNER | H= | C | 09/03/2015 | NOTE: ELECTRIC HEAT ON UPPER LEVEL, FINISHED BASEMENT, DIRECT VENT BOILER. | LUKE | LUKE | | H= | C | 5029898 |
HOMEOWNER | HRR | C | 03/02/2015 | by final need electric baseboard heat in 2nd floor bedroom and 2nd floor office | TED | TED | | HRR | C | 4910229 |
HOMEOWNER | HRR | R | 01/20/2015 | not read, went over needed corrections with owner | TED | TED | | HRR | R | 4887681 |
HOMEOWNER | HC | C | 12/17/2014 | OK FOR METER RELEASE | JERRYF | JERRYF | | HC | C | 4873291 |
HOMEOWNER | H16 | C | 12/03/2014 | CONSULTED WITH HOMEOWNER ON BATH FAN VENT LOCATIONS AND INSTRUCTED HER ON NEEDING HRR INSPECTION FOR ALL EXHAUST DUCTS BEFORE COVER | JERRYF | JERRYF | | H16 | C | 4864371 |
MD SERVICE PLUMBING, INC. | H= | P | 12/03/2014 | PARTIAL FINAL PENDING COMPLETION OF ALL PIPING IN MECHROOM | JERRYF | JERRYF | | H= | P | 4864370 |
MD SERVICE PLUMBING, INC. | HV | C | 12/03/2014 | BOILER VENT OK | JERRYF | JERRYF | | HV | C | 4864362 |
MD SERVICE PLUMBING, INC. | HI | C | 12/02/2014 | 10 LB TEST OK. 1 INCH LINE IN. 1 BOILER, 1 RANGE, 1 BBQ ON DECK. | NANCY | NANCY | | HI | C | 4862980 |
MD SERVICE PLUMBING, INC. | HO | C | 12/01/2014 | 3/4" PE from meter at road to house ok. | MARK | MARK | | HO | C | 4862098 |
MD SERVICE PLUMBING, INC. | HWP | P | 10/31/2014 | ok to cover 1st floor | TED | TED | | HWP | P | 4846035 |
T & N DESIGN LLC | HWP | P | 03/18/2014 | 50lb test on #60 gauge. Ok. Ok to cover.
| MARK | MARK | | HWP | P | 4704508 |
MD SERVICE PLUMBING, INC. | P= | C | 09/21/2015 | | TIM | TIM | | P= | C | 5040794 |
MD SERVICE PLUMBING, INC. | PTO | C | 01/05/2015 | finished basement | TED | TED | | PTO | C | 4880359 |
HOMEOWNER | PWO | C | 03/26/2014 | | TIM | TIM | | PWO | C | 4709028 |
MD SERVICE PLUMBING, INC. | PB | C | 03/04/2014 | | DICK | DICK | | PB | C | 4696333 |