PALACE HOMES, INC. | B= | C | 07/31/2014 | All other required Final inspections are complete. (This is a computer generated result) | ED | ED | | B= | C | 4787962 |
PALACE HOMES, INC. | B= | P | 07/30/2014 | Additional Inspections Required: Mechanical Final Inspection is not Completed yet. building final ok, pending mechanical final | ED | ED | | B= | P | 4786854 |
PALACE HOMES, INC. | BLA | C | 05/05/2014 | | ED | ED | | BLA | C | 4733068 |
PALACE HOMES, INC. | BIN | C | 05/01/2014 | | CHRISM | CHRISM | | BIN | C | 4731131 |
PALACE HOMES, INC. | BFR | C | 04/28/2014 | | CHRISM | CHRISM | | BFR | C | 4728493 |
PALACE HOMES, INC. | BFR | R | 04/25/2014 | ok to insulate, missing SDS screws in hangers, lateral brace D1 on wrong web, missing laterals A1B-A4-A4A truss repair eng on file, hanger detail letter on file | CHRISM | CHRISM | | BFR | R | 4727040 |
PALACE HOMES, INC. | BFI | C | 03/12/2014 | | CHRISM | CHRISM | | BFI | C | 4700875 |
PALACE HOMES, INC. | BFI | R | 03/11/2014 | need ES report for insulation product used | CHRISM | CHRISM | | BFI | R | 4700532 |
PALACE HOMES, INC. | BFN | C | 02/24/2014 | design and soils on file no drain required | CHRISM | CHRISM | | BFN | C | 4691655 |
PALACE HOMES, INC. | BFT | C | 02/21/2014 | eng report on file | CHRISM | CHRISM | | BFT | C | 4691272 |
PALACE HOMES, INC. | BFN | C | 02/21/2014 | wall ok, need all paperwork | CHRISM | CHRISM | | BFN | C | 4690813 |
PEAK ELECTRIC INC. | E= | C | 07/23/2014 | | MATTHEW | MATTHEW | | E= | C | 4782538 |
PEAK ELECTRIC INC. | E= | R | 07/22/2014 | bond water pipe together ----------------- no power to laundry lights ----------- breaker lock for steamer ------------------ no a/c or rough | CRAIG | CRAIG | | E= | R | 4781805 |
PEAK ELECTRIC INC. | ES | C | 04/24/2014 | Residential Overhead: 200 amp 3/w: new res---- meter is set and sealed | MATTHEW | MATTHEW | | ES | C | 4726459 |
PEAK ELECTRIC INC. | ER | C | 04/24/2014 | 4-20, #6al, 6-3nm ran to equipment in mech room | MATTHEW | MATTHEW | | ER | C | 4726447 |
PEAK ELECTRIC INC. | EUG | C | 03/14/2014 | service lateral from pole to house | MATTHEW | MATTHEW | | EUG | C | 4702616 |
JOLLY PLUMBING & HEATING INC. | H= | C | 07/31/2014 | correction made | TED | TED | | H= | C | 4787961 |
JOLLY PLUMBING & HEATING INC. | H= | R | 07/30/2014 | need 9-d installed before pressure regulator, not after on fill water connection, rest ok | TED | TED | | H= | R | 4786945 |
AIR CONCEPTS HEATING & COOLING | HC | C | 04/23/2014 | RELEASE METER | JEFFL | JEFFL | | HC | C | 4725634 |
AIR CONCEPTS HEATING & COOLING | HRR | C | 04/23/2014 | Vents ok. | JEFFL | JEFFL | | HRR | C | 4725633 |
DOUBLE J GAS, INC. | HI | C | 04/22/2014 | 10 psi test ok. note: 1" blk- kitchen range and boiler | MARKB | MARKB | | HI | C | 4725012 |
JOLLY PLUMBING & HEATING INC. | HWP | P | 03/14/2014 | Test is good at 60lbs. Ok to pour / cover. | MARK | MARK | | HWP | P | 4703148 |
JOLLY PLUMBING & HEATING INC. | P= | C | 07/30/2014 | received potable water cert | TIM | TIM | | P= | C | 4786517 |
JOLLY PLUMBING & HEATING INC. | P= | P | 07/28/2014 | still need potable water cert | TIM | TIM | | P= | P | 4785119 |
JOLLY PLUMBING & HEATING INC. | P= | P | 07/22/2014 | NEED TO TEST SHOWER IN MASTER . AND POTABLE WATER CERT FOR COMPLETION | GABE | GABE | | P= | P | 4781565 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 04/15/2014 | | DICK | DICK | | PTO | C | 4720292 |
PALACE HOMES, INC. | PWO | C | 03/14/2014 | | TIM | TIM | | PWO | C | 4702841 |
JOLLY PLUMBING & HEATING INC. | PB | C | 03/04/2014 | | DICK | DICK | | PB | C | 4696551 |