J. E. DUNN CONSTRUCTION COMPANY | B= | C | 07/16/2014 | All other required Final inspections are complete. (This is a computer generated result) | JOHNP | JOHNP | | B= | C | 4778388 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 07/16/2014 | Additional Inspections Required: GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet. Need electric final | JOHNP | JOHNP | | B= | P | 4777532 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 06/25/2014 | Firecaulk | JOHNP | JOHNP | | BFR | P | 4765090 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 06/20/2014 | above grid firecaulking - hybrid OR ok except above double doors to corridor | BERTW | BERTW | | BSP | P | 4762016 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | R | 06/16/2014 | Firecaulk incomplete | JOHNP | JOHNP | | BFR | R | 4758387 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 04/23/2014 | framing for rooms #229, #212, #230 OK noted on approved plans sheet A111; several fire caulking isssues for penetrations and pipes half in and half out of walls at 1hr fire barrier; will need fire caulk inspection of penetrations and head walls | DAN | DAN | | BFR | P | 4725462 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 02/10/2014 | inspections assigned to bert | BLAKE | BLAKE | | BSP | P | 4685046 |
GREEN ELECTRIC INC | E= | C | 07/16/2014 | pnl's and transfer switch OK | CRAIGS | CRAIGS | | E= | C | 4778387 |
GREEN ELECTRIC INC | E= | P | 07/14/2014 | rooms ok need equipment and panel inspection if not already looked at POC Joe 491-5666. note did not see voltage color label on panel | BRET | BRET | | E= | P | 4776147 |
GREEN ELECTRIC INC | E= | C | 07/14/2014 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 4776146 |
GREEN ELECTRIC INC | ER | C | 07/14/2014 | FIRE ALARM INSPECTION: | BRET | BRET | | ER | C | 4776143 |
GREEN ELECTRIC INC | ER | P | 06/24/2014 | every thing except one office | CRAIGS | CRAIGS | | ER | P | 4764613 |
GREEN ELECTRIC INC | ER | C | 06/24/2014 | FIRE ALARM INSPECTION: 5 device letter | CRAIGS | CRAIGS | | ER | C | 4764611 |
GREEN ELECTRIC INC | ER | P | 06/19/2014 | rooms 204 , 205 , 205a , 224 walls only | TOMC | TOMC | | ER | P | 4760991 |
GREEN ELECTRIC INC | ER | P | 04/22/2014 | walls in O R #12 --- I , T ROOM ---- control room OK | CRAIGS | CRAIGS | | ER | P | 4725009 |
COLORADO SHEET METAL CO., INC. | H= | C | 07/15/2014 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 4777229 |
COLORADO SHEET METAL CO., INC. | H= | P | 06/25/2014 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. NOTE: FLEX DUCT DOWN STREAM OF RATED WALL HAS BEEN REMOVED AND REPLACED WITH HARD PIPE. | NANCY | NANCY | | H= | P | 4765645 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 06/24/2014 | MECHANICAL PIPING FINAL OK. | NANCY | NANCY | | H= | C | 4764084 |
COLORADO SHEET METAL CO., INC. | H= | P | 06/24/2014 | RFI FROM ENGINEER REGARDING DUCTS THROUGH RATED WALL RECEIVED AND SCANNED. VERIFY THERE ARE NO FLEX DUCT CONNECTIONS DOWN STREAM OF RATED WALL AS PER ENGINEERS RFI. | NANCY | NANCY | | H= | P | 4763862 |
COLORADO SHEET METAL CO., INC. | H= | P | 06/23/2014 | PROVIDE RFI REGARDING DUCT PENETRATIONS THROUGH 1 HOUR WALL AT INSTRUMENT ROOM 229. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4763186 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 05/20/2014 | STEAM SUPPLY AND CONDENSATE: UNDER WORKING PRESSURE, NO VISIBLE LEAKS, OK TO CLOSE UP INSULATION. HOT WATER SUPPLY/RETURN: UNDER WORKING PRESSURE, NO VISIBLE LEAKS. OK TO CLOSE UP INSULATION. FOR FINAL INSTALL CONDENSATE DRAIN FOR CRAC UNIT, COMPLETE LABELING. | NANCY | NANCY | | HWP | C | 4741994 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/01/2014 | EXISTING FIRE DAMPER FRAMING AT SUB STORAGE 216 WALL OK FOR SHEETROCK, NOTE: FS/D FRAMING WAS REINSTALLED BACK TO EXISTING. STILL NEED RFI FROM ENGINEER REGARDING PENETRATIONS IN INSTRUMENT ROOM 229 | ROBERTV | ROBERTV | | HD | P | 4731396 |
COLORADO SHEET METAL CO., INC. | HD | P | 04/23/2014 | ALL SA OK TO WRAP, NEED TO INSPECT EXISTING FIRE DAMPER FRAMING THAT WAS REMOVED AT STORAGE 216 WALL WHEN NEW FRAMING IS READY BEFORE SHEETROCK. DUCT PENETRATIONS THRU 1 HOUR FIRE BARRIER AT INSTRUMENT ROOM 229 DO NOT COMPLY WITH 2009 IMC 607.5.2. ENGINEER NEEDS TO BE CONTACTED, DO NOT CONCEAL ANYTHING | ROBERTV | ROBERTV | | HD | P | 4725888 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 12/23/2014 | | JOEL | JOEL | | P= | C | 4877427 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 07/21/2014 | need pics of tie-ins at final | JOEL | JOEL | | PTO | C | 4780601 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 07/21/2014 | still need clinical sink rough and final | JOEL | JOEL | | P= | P | 4780147 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 07/09/2014 | add clinical sink, mop sink, and restroom to permit details | JOEL | JOEL | | P= | P | 4773358 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/10/2014 | rest room o.k. still need to add restroom to permit details | JOEL | JOEL | | PTO | P | 4754781 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/20/2014 | mop sink o.k, add restroom to permit details | JOEL | JOEL | | PTO | P | 4742048 |