HOMEOWNER | B= | C | 02/19/2015 | | DANE | DANE | | B= | C | 4905517 |
HOMEOWNER | B= | P | 01/09/2015 | Need permanent house numbers at street and on house/need engineer letter on retaining wall design and inspections -- Schedule a new Building Final when above items are complete.EDITED COMMENT: Upon further review, retaining walls are not in the approved foundation design. Will need separate permit if any portion of retaining walls exceed 4' above grade to complete final inspection for retaining walls and residence. | DANE | DANE | | B= | P | 4883251 |
HOMEOWNER | BLA | C | 09/03/2014 | | JEREMYA | JEREMYA | | BLA | C | 4808926 |
HOMEOWNER | BIN | C | 07/21/2014 |
| JOHNP | JOHNP | | BIN | C | 4780560 |
HOMEOWNER | BFR | C | 07/11/2014 | | JOHNP | JOHNP | | BFR | C | 4775462 |
HOMEOWNER | BSP | R | 07/07/2014 | POST ADDRESS AT STREET - Roof frame is part of house frame - call when ready | JOHNP | JOHNP | | BSP | R | 4771846 |
HOMEOWNER | BSP | P | 06/20/2014 | Deck posts and frame OK | NICK | NICK | | BSP | P | 4762333 |
HOMEOWNER | BSP | P | 06/20/2014 | Garage narrow brace wall OK | NICK | NICK | | BSP | P | 4762332 |
HOMEOWNER | BTR | C | 06/20/2014 | | NICK | NICK | | BTR | C | 4762331 |
HOMEOWNER | BSP | P | 06/16/2014 | Post address - portal wall - reject - need OSB nailed to header & straps inside; front & rear porch roofs OK | JOHNP | JOHNP | | BSP | P | 4758945 |
HOMEOWNER | BFI | C | 03/13/2014 | 2" insulation, r-10 under slab | JEREMYC | JEREMYC | | BFI | C | 4701726 |
HOMEOWNER | BFD | C | 03/04/2014 | Still need foundation insulaton inspection | JOHNP | JOHNP | | BFD | C | 4696758 |
HOMEOWNER | BFD | R | 03/03/2014 | Perforated pipe comes out of the plastic before it connects to non-perforated pipe. This connection needs to be inside the plastic membrane. Need foundation insulation inspection at same time as drain inspection. | JOHNP | JOHNP | | BFD | R | 4696018 |
HOMEOWNER | BFN | C | 03/03/2014 | 1 eufer ground OK, soils, design, compaction & engineer's inspection letters picked up, drain usable | JOHNP | JOHNP | | BFN | C | 4696012 |
HOMEOWNER | BFT | C | 03/03/2014 | Engineer's inspection letter picked up - all interior & exterior pads OK | JOHNP | JOHNP | | BFT | C | 4696009 |
HOMEOWNER | BFN | P | 03/03/2014 | AUTHORIZED INSPECTION BY ENGINEER | BPHILLIPS | BPHILLIPS | BPHILLIPS | BFN | P | 4695617 |
HOMEOWNER | BFT | P | 03/03/2014 | AUTHORIZED INSPECTION BY ENGINEER | BPHILLIPS | BPHILLIPS | BPHILLIPS | BFT | P | 4695616 |
FIRST RATE ELECTRICAL SERVICES, INC. | E= | C | 01/02/2015 | | CRAIG | CRAIG | | E= | C | 4879658 |
FIRST RATE ELECTRICAL SERVICES, INC. | E= | P | 12/24/2014 | the gfci's at the bbq needs sealed up by someone ----- hot tub not installed at this time on upper deck -- changed to a partial on 12-26-2014 after talking to Dean he never said it was OK to leave it for the someone else to seal and that we need to see that it was done | CRAIGS | CRAIGS | | E= | P | 4877890 |
FIRST RATE ELECTRICAL SERVICES, INC. | E= | R | 12/19/2014 | conductors in free air feeding island receptacles, gfci protect receptacle within 6' of laundry sink, install box extensions and grout around receptacles at bbq, hot tub not wired. living room floor receptacles have no power, install arc-shields receptacles in wood panel living room, gfci protect wet bar dishwasher/ disposal circuit complete re-inspect | BRET | BRET | | E= | R | 4875391 |
FIRST RATE ELECTRICAL SERVICES, INC. | ES | C | 07/11/2014 | Residential Underground: NEW 200 AMP SERVICE | MIKEC | MIKEC | | ES | C | 4774953 |
FIRST RATE ELECTRICAL SERVICES, INC. | ES | R | 07/10/2014 | Residential Underground: UFER NEEDS TO LAND ON NEUTRAL LUG----2OO 3-W | BRIAN | BRIAN | | ES | R | 4774041 |
FIRST RATE ELECTRICAL SERVICES, INC. | ER | C | 07/10/2014 | NOTES----FINISHED BASEMENT--2-SUB PANELS---3-15 - 2 6-3 AL -- 1-30 --1 6-3 COPPER -- 1 4-3 COPPER | BRIAN | BRIAN | | ER | C | 4774032 |
BRUNO'S HEATING & COOLING | H= | C | 12/17/2014 | Note-- partially unfinished basement., | JEFFL | JEFFL | | H= | C | 4873402 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HO | C | 11/21/2014 | 10 LB. test ok. Notes-- 100' of 1 1/4'' installed to garage. | JEFFL | JEFFL | | HO | C | 4858903 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HC | C | 07/09/2014 | RELEASE METER | JEFFL | JEFFL | | HC | C | 4773180 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HI | C | 07/09/2014 | 10 LB. test ok. Notes-- 1 1/2'' main.. 1 boiler.. 1 bbq.. 1 range.. 3 fp.. 1 dryer. | JEFFL | JEFFL | | HI | C | 4773172 |
BRUNO'S HEATING & COOLING | HRR | C | 07/09/2014 | Correction made. | JEFFL | JEFFL | | HRR | C | 4773168 |
BRUNO'S HEATING & COOLING | HRR | P | 07/08/2014 | BOILER VENT HAS BEEN REMOVED FROM MAIN FLOOR THROUGH ROOF - RE INSPECT | JERRYF | JERRYF | | HRR | P | 4772800 |
BRUNO'S HEATING & COOLING | HRR | P | 06/30/2014 | Nail protection required on main level at plastic vent pipe. Rest ok. | JEFFL | JEFFL | | HRR | P | 4767896 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HWP | C | 06/30/2014 | Pressure test ok. Stapled down | JEFFL | JEFFL | | HWP | C | 4767891 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HWP | P | 04/10/2014 | 60 LB TEST OK ON GARAGE. OK TO POUR. | NANCY | NANCY | | HWP | P | 4718378 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HWP | R | 03/14/2014 | ok to cover basement | TED | TED | | HWP | R | 4702408 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | P= | C | 12/31/2014 | | JOEL | JOEL | | P= | C | 4879423 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | P= | P | 12/30/2014 | provide ladder for access to steamer unit, note: rpbfp installed for irrigation | JOEL | JOEL | | P= | P | 4879050 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PTO | C | 07/10/2014 | | JOEL | JOEL | | PTO | C | 4774656 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PB | C | 03/10/2014 | HDPE FOR FUTURE ALSO INSTALLED | LEE | LEE | | PB | C | 4699666 |