ELEVATION HOMES, LLC | B= | C | 07/30/2014 | unfinished basement, (half of basement has been framed) - no other rough ins installed | ED | ED | | B= | C | 4786939 | ELEVATION HOMES, LLC | BLA | C | 06/27/2014 | | CHRISM | CHRISM | | BLA | C | 4767261 | ELEVATION HOMES, LLC | BLA | P | 06/02/2014 | ok all but at north porch | CHRISM | CHRISM | | BLA | P | 4749590 | ELEVATION HOMES, LLC | BIN | C | 05/19/2014 | | CHRISM | CHRISM | | BIN | C | 4741557 | ELEVATION HOMES, LLC | BFR | C | 05/19/2014 | | CHRISM | CHRISM | | BFR | C | 4741556 | ELEVATION HOMES, LLC | BFR | R | 05/14/2014 | ok to insulate, point load TR30 and TR34 girder posts | CHRISM | CHRISM | | BFR | R | 4738520 | ELEVATION HOMES, LLC | BSP | P | 04/30/2014 | front and rear porch and posts ok, decks and columnns ok | CHRISM | CHRISM | | BSP | P | 4729941 | ELEVATION HOMES, LLC | BFI | C | 03/24/2014 | R-10 at walkout walls | CHRISM | CHRISM | | BFI | C | 4707065 | ELEVATION HOMES, LLC | BFD | C | 03/24/2014 | soils on file drain usable isolate and float | CHRISM | CHRISM | | BFD | C | 4707061 | ELEVATION HOMES, LLC | BFN | C | 03/24/2014 | design and eng report on file | CHRISM | CHRISM | | BFN | C | 4707060 | ELEVATION HOMES, LLC | BFT | C | 03/24/2014 | eng report on file | CHRISM | CHRISM | | BFT | C | 4707059 | ELEVATION HOMES, LLC | BFN | P | 02/14/2014 | AUTHORIZED INSPECTION BY ENGINEER | MINDY | MINDY | MINDY | BFN | P | 4687586 | ELEVATION HOMES, LLC | BFT | P | 02/14/2014 | AUTHORIZED INSPECTION BY ENGINEER | MINDY | MINDY | MINDY | BFT | P | 4687585 | POSITIVE ELECTRIC, LLC | E= | C | 07/18/2014 | no A/C | TOMC | TOMC | | E= | C | 4779885 | POSITIVE ELECTRIC, LLC | ES | C | 05/15/2014 | Residential Underground: 200 amp 3/w: new res | MATTHEW | MATTHEW | | ES | C | 4739710 | POSITIVE ELECTRIC, LLC | EUG | C | 05/15/2014 | service lateral from pedestal to home | MATTHEW | MATTHEW | | EUG | C | 4739694 | POSITIVE ELECTRIC, LLC | ER | C | 05/13/2014 | | MATTHEW | MATTHEW | | ER | C | 4737875 | POSITIVE ELECTRIC, LLC | ES | R | 05/12/2014 | not ready | MATTHEW | MATTHEW | | ES | R | 4737007 | POSITIVE ELECTRIC, LLC | ER | R | 05/12/2014 | need outlet at handrail in living room, ------------no power to fireplace, basement partially framed but not finished----------2-20 | MATTHEW | MATTHEW | | ER | R | 4737006 | BRUNO'S HEATING & COOLING | H= | C | 07/09/2014 | UNFINISHED BASEMENT, UNDERCUT DOORS . VENT TERMINATION TO MFR SPEC | GABE | GABE | | H= | C | 4773103 | BRUNO'S HEATING & COOLING | HC | C | 05/12/2014 | RELEASE METER | TED | TED | | HC | C | 4737011 | BRUNO'S HEATING & COOLING | HRR | C | 05/12/2014 | basement to be unfinished (framing only, no supplys run out off main duct work), no a/c, duct design | TED | TED | | HRR | C | 4737005 | DOUBLE J GAS, INC. | HI | C | 05/05/2014 | 1'' furnace, w/h, range | TED | TED | | HI | C | 4732905 | PACIFIC PLUMBING, INCORPORATED | P= | C | 07/02/2014 | NOTE : FRAMING ONLY IN BASEMENT, NOT FINISHED . NO IRRIGATION . POTABLE WATER TO SCANNING | GABE | GABE | | P= | C | 4769709 | HOMEOWNER | PWO | C | 06/05/2014 | | GABE | GABE | | PWO | C | 4751825 | PACIFIC PLUMBING, INCORPORATED | PTO | C | 05/02/2014 | UNFINISHED BASEMENT . NOTE POTABLE WATER CERTIFICATE BY FINAL | GABE | GABE | | PTO | C | 4731636 | PACIFIC PLUMBING, INCORPORATED | PB | C | 03/28/2014 | 5 PSI TEST ON DWV . | GABE | GABE | | PB | C | 4710541 | PACIFIC PLUMBING, INCORPORATED | PB | C | 03/28/2014 | 5 PSI TEST ON DWV OK . | GABE | GABE | | PB | C | 4710540 |
|
|