DME HOMES | B= | C | 06/20/2014 | | ED | ED | | B= | C | 4762658 |
DME HOMES | BIN | C | 06/20/2014 | 3rd party insulation cert on file | ED | ED | | BIN | C | 4762657 |
DME HOMES | BLA | C | 05/05/2014 | | ED | ED | | BLA | C | 4733136 |
DME HOMES | BIN | C | 04/30/2014 | | CHRISM | CHRISM | | BIN | C | 4730146 |
DME HOMES | BFR | C | 04/30/2014 | truss repair letter on file | CHRISM | CHRISM | | BFR | C | 4730143 |
DME HOMES | BFR | R | 04/24/2014 | ok to insulate, missing lateral brace T10, eng repair for broken center web T09 | CHRISM | CHRISM | | BFR | R | 4726731 |
DME HOMES | BSP | P | 04/18/2014 | front and rear porch roofs ok, no posts | CHRISM | CHRISM | | BSP | P | 4722817 |
DME HOMES | BSP | P | 03/24/2014 | deck pier ok | CHRISM | CHRISM | | BSP | P | 4707189 |
DME HOMES | BFD | C | 03/19/2014 | soils on file drain usable isolate and float | CHRISM | CHRISM | | BFD | C | 4705406 |
DME HOMES | BFI | C | 03/19/2014 | R-10 at slab area walls | CHRISM | CHRISM | | BFI | C | 4705405 |
DME HOMES | BFN | C | 03/19/2014 | design and eng report on file | CHRISM | CHRISM | | BFN | C | 4705404 |
DME HOMES | BFT | C | 03/19/2014 | eng report on file | CHRISM | CHRISM | | BFT | C | 4705403 |
PENTAGON ELECTRIC | E= | C | 06/19/2014 | | MATTHEW | MATTHEW | | E= | C | 4761801 |
PENTAGON ELECTRIC | E= | L | 06/18/2014 | locked 1:59 | MATTHEW | MATTHEW | | E= | L | 4760651 |
PENTAGON ELECTRIC | E= | R | 06/17/2014 | gfci exterior outlets, secure front outlet, sump gfci won't set, mech room outlet no power, , cap neutral at well disconnect-------------- no a/c | MATTHEW | MATTHEW | | E= | R | 4759889 |
PENTAGON ELECTRIC | ER | C | 04/24/2014 | | MATTHEW | MATTHEW | | ER | C | 4726298 |
PENTAGON ELECTRIC | ES | C | 04/23/2014 | Residential Underground: 200 amp 3/w: new res------ meter is set ; need seal | MATTHEW | MATTHEW | | ES | C | 4725802 |
PENTAGON ELECTRIC | ER | R | 04/23/2014 | wirenut grounds at lights and smokes, add outlet at 1/2 wall at island------------3-15, #6al | MATTHEW | MATTHEW | | ER | R | 4725797 |
PENTAGON ELECTRIC | EUG | C | 04/17/2014 | 3/w 4/0 AL | CRAIG | CRAIG | | EUG | C | 4722375 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 06/10/2014 | final ok. No range at time of inspection. Hi/Lo grills to mechanical rm. | MARK | MARK | | H= | C | 4754573 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 04/21/2014 | RELEASE METER | JEFFL | JEFFL | | HC | C | 4724009 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 04/21/2014 | Notes-- direct vent furnace.. osa to return.. ***Verify range connection at final.. | JEFFL | JEFFL | | HRR | C | 4724008 |
L & L GAS SHOP, LLC. | HI | C | 04/16/2014 | 10 LB. test ok. Notes-- 1'' main.. 1 furnace.. 1 wh.. 1fp.. 1 range. | JEFFL | JEFFL | | HI | C | 4721589 |
JOLLY PLUMBING & HEATING INC. | P= | C | 06/13/2014 | received potable water cert | TIM | TIM | | P= | C | 4757299 |
JOLLY PLUMBING & HEATING INC. | P= | P | 06/06/2014 | CORRECTIONS MADE . STILL NEED POTABLE WATER CERT TO COMPLETE | GABE | GABE | | P= | P | 4752815 |
JOLLY PLUMBING & HEATING INC. | P= | P | 06/04/2014 | dishwasher standpipe not to code need proof of potable water | TIM | TIM | | P= | P | 4751506 |
JOLLY PLUMBING & HEATING INC. | PWO | C | 04/16/2014 | POTABLE WATER CERTIFICATE AT FINAL | GABE | GABE | | PWO | C | 4721229 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 04/16/2014 | CORRECTIONS MADE | GABE | GABE | | PTO | C | 4721228 |
JOLLY PLUMBING & HEATING INC. | PTO | P | 04/15/2014 | NAIL PLATES FOR SHOWER VENT , NAIL PLATES IN BATHROOM , SECURE FLOOR FLANGE IN BASEMENT , NO TEST ON KITCHEN, REST OK | GABE | GABE | | PTO | P | 4720387 |
JOLLY PLUMBING & HEATING INC. | PB | C | 03/25/2014 | copper main no pwo at this time | TED | TED | | PB | C | 4708655 |
JOLLY PLUMBING & HEATING INC. | PB | P | 03/24/2014 | low test | JOEL | JOEL | | PB | P | 4707553 |