MASTER BILT HOMES, INC. | B= | C | 07/25/2014 | finished basement, deck in | DALE | DALE | | B= | C | 4784352 |
MASTER BILT HOMES, INC. | B= | R | 07/24/2014 | need to sheet rock walls under stairs and seal gaps under stairs / missing guard rail next to front side walk, less than 3' from retaining wall with 30"+ elevation drop / missing hand rail on steps in garage, 4 and more risers / need to seal sheet rock around pipe penetration in garage on common wall | JEREMYC | JEREMYC | | B= | R | 4783440 |
MASTER BILT HOMES, INC. | BLA | C | 06/04/2014 | | DALE | DALE | | BLA | C | 4750962 |
MASTER BILT HOMES, INC. | BIN | C | 05/27/2014 | finished basement | CHRISM | CHRISM | | BIN | C | 4745736 |
MASTER BILT HOMES, INC. | BFR | C | 05/27/2014 | | CHRISM | CHRISM | | BFR | C | 4745731 |
MASTER BILT HOMES, INC. | BFR | P | 05/22/2014 | ok to insulate, nail off t-braces | CHRISM | CHRISM | | BFR | P | 4744045 |
MASTER BILT HOMES, INC. | BSP | P | 05/07/2014 | porch and posts ok | CHRISM | CHRISM | | BSP | P | 4734528 |
MASTER BILT HOMES, INC. | BSP | P | 05/02/2014 | PLAN SPLICE: (No Fee) by: DANM for Construction: Deck framing changes | DANM | DANM | | BSP | P | 4731746 |
MASTER BILT HOMES, INC. | BSP | P | 04/02/2014 | PLAN SPLICE: (No Fee) by: JIMA for Construction: fix floor frasming plans / missed cantilever | JIMA | JIMA | | BSP | P | 4713579 |
MASTER BILT HOMES, INC. | BFI | C | 04/02/2014 | R-10 at walkout | CHRISM | CHRISM | | BFI | C | 4713444 |
MASTER BILT HOMES, INC. | BFD | C | 04/02/2014 | soils on file drain usable isolate and float | CHRISM | CHRISM | | BFD | C | 4713434 |
MASTER BILT HOMES, INC. | BFN | C | 04/02/2014 | design and eng report on file | CHRISM | CHRISM | | BFN | C | 4713432 |
MASTER BILT HOMES, INC. | BFT | C | 04/02/2014 | eng report on file | CHRISM | CHRISM | | BFT | C | 4713431 |
FIRST RATE ELECTRICAL SERVICES, INC. | E= | C | 07/15/2014 | no a/c | MATTHEW | MATTHEW | | E= | C | 4777218 |
FIRST RATE ELECTRICAL SERVICES, INC. | ES | C | 05/22/2014 | Residential Underground: 200 AMP 3-W ----------OK TO SEAL METER------ | BRIAN | BRIAN | | ES | C | 4743619 |
FIRST RATE ELECTRICAL SERVICES, INC. | EUG | C | 05/21/2014 | FROM POLE TO HOUSE------3 4/0 AL | BRIAN | BRIAN | | EUG | C | 4743090 |
FIRST RATE ELECTRICAL SERVICES, INC. | ES | C | 05/21/2014 | Residential Underground: -- 200 AMP 3-W | BRIAN | BRIAN | | ES | C | 4743089 |
FIRST RATE ELECTRICAL SERVICES, INC. | ER | C | 05/21/2014 | NOTES-------TC. CABLE NOT INSTALLED AT TIME OF INSP. ( NEEDS TO BE IN CONDUIT )-----FINISHED BASEMENT----3-20 2-15 | BRIAN | BRIAN | | ER | C | 4743088 |
DESIGN SYSTEMS HEATING & AC | H= | C | 07/23/2014 | correction made | TED | TED | | H= | C | 4782553 |
DESIGN SYSTEMS HEATING & AC | H= | P | 07/22/2014 | complete furnace venting, note: finished basement, no a/c, louver door | TED | TED | | H= | P | 4781375 |
DESIGN SYSTEMS HEATING & AC | HC | C | 05/21/2014 | RELEASE METER | TED | TED | | HC | C | 4743142 |
DESIGN SYSTEMS HEATING & AC | HRR | C | 05/21/2014 | finished basement, no a/c, duct design | TED | TED | | HRR | C | 4743124 |
DOUBLE J GAS, INC. | HI | C | 05/20/2014 | 10 lb test ok. Note: 1 1/4" main. F, w/h, rng, dryer, future garage heater? | MARK | MARK | | HI | C | 4741904 |
JOLLY PLUMBING & HEATING INC. | P= | C | 07/21/2014 | POTABLE WATER CERT TO SCANNING | GABE | GABE | | P= | C | 4780160 |
JOLLY PLUMBING & HEATING INC. | P= | P | 07/10/2014 | ALL OK . POTABLE WATER CERT TO SCANNING | GABE | GABE | | P= | P | 4774065 |
JOLLY PLUMBING & HEATING INC. | P= | R | 07/09/2014 | NO PRESSURE THROUGH OUT HOUSE . POTABLE WATER CERT REQUIRED . RE INSPECT ALL | GABE | GABE | | P= | R | 4773173 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 05/15/2014 | POTABLE WATER CERTIFICATE BY FINAL . NOTE WATER LINE SLEEVED THROUGH FOUNDATION | GABE | GABE | | PTO | C | 4739205 |
JOLLY PLUMBING & HEATING INC. | PWO | C | 04/16/2014 | | GABE | GABE | | PWO | C | 4721287 |
JOLLY PLUMBING & HEATING INC. | PB | C | 04/11/2014 | CHECK WATER LINE AT PTO | GABE | GABE | | PB | C | 4718720 |